MT QC CHECKLIST

Name of MT:
Mae Ann Rose P. Salvacion
Date of Training:
October 16, 2017 - November 24, 2017 (Under Production Team)
DETAILS PROJECT SIGNATURE
Unit Layout Eka (SAT), Miggy (ATR), Philip (VRP)
Unit Sectional Brylee (SAT), Franz (ATR)
Stair Details Cza (ATR), Z (SAT-MRB)
Ramp & Parking Details
Kitchen Details Gab (SAT), Z (ATR)
T&B Details Cza/Z (SAT)
RCP Hallways Brylee, David (ATR)
Hallway Railing Details Karl (ATR), Miggy (SAT)
Balcony Detail Philip (ATR)
Main Entrance Details Philip (OHR)
Hallway Tile Layout
Atrium Skylight & Precast Wall Details
Elevator Shaft Details
Roof Cover/ Canopy Details
Laundry Cage Details Miggy (MLP)
Mailbox Details Miggy (BXP), Z (IFT-N)
Signages Jeff (SRT-N), Bry/Karl (CLP), Kenn/Franz (BXP)

Noted by:

___________________________
Nikko L. Gabiosa
Senior Architect
MT QC CHECKLIST

Name of MT:
Gabriel Ariston S. Latorre
Date of Training:
October 16, 2017 - November 24, 2017 (Under Production Team)
DETAILS PROJECT SIGNATURE
Unit Layout
Unit Sectional
Stair Details
Ramp & Parking Details
Kitchen Details
T&B Details
RCP Hallways
Hallway Railing Details
Balcony Detail
Main Entrance Details
Hallway Tile Layout
Atrium Skylight & Precast Wall Details
Elevator Shaft Details
Roof Cover/ Canopy Details
Laundry Cage Details
Mailbox Details
Signages

Noted by:

___________________________
Nikko L. Gabiosa
Senior Architect