Total Cost of Labor and Materials P 60,000.00
Total Cost of Labor and Materials P 60,000.00
Total Cost of Labor and Materials P 60,000.00
Scope of Work
1. Demolition
- Gypsom board
- Metal paring
2. Re installation
- Metal paring
- Gypsom board
3. Installation of Cove lights
- ¾ plywood
- ¼ plywood
4. Electrical
- Piping
- Wiring
- T8 lights
- Pin lights
5. Painting
- Ceiling
- Wall
- Cove lights