This document provides a breakdown of the parts and materials needed for a hydraulic ring basket breakdown. It includes 26 items for the frame/structure, 14 items for weights, and finishing materials. It also lists materials for impact protection, rebound panels, and rings including steel pipes, plates, bolts, foam, and fabric. The total cost is estimated at Rp. 138,000,000 including shipping.
This document provides a breakdown of the parts and materials needed for a hydraulic ring basket breakdown. It includes 26 items for the frame/structure, 14 items for weights, and finishing materials. It also lists materials for impact protection, rebound panels, and rings including steel pipes, plates, bolts, foam, and fabric. The total cost is estimated at Rp. 138,000,000 including shipping.
This document provides a breakdown of the parts and materials needed for a hydraulic ring basket breakdown. It includes 26 items for the frame/structure, 14 items for weights, and finishing materials. It also lists materials for impact protection, rebound panels, and rings including steel pipes, plates, bolts, foam, and fabric. The total cost is estimated at Rp. 138,000,000 including shipping.
I. Rangka / konstruksi tiang 1 Holo 150X150X5 2 Batang 2 Holo 100X100X2 4 Batang 3 Holo 100X50X2 3 Batang 4 Holo 75X75X3 2 Batang 5 Holo 60x60x2 2 Batang 6 Holo 50X50X2 2 Batang 7 Holo 40X40X2 7 Batang 8 Holo 30X30X2 1 Batang 9 Assential Ǿ 35 ST 40 1 Batang 10 Beton 16 mm 1 Batang 11 UNP 100x50x5 1 Batang 12 Pipa seamlus 1” sch40 1 Batang 13 Pipa seamlus 1¼” sch40 1 batang 14 Plat hitam 15 mm 150 kg 15 Plat hitam 8 mm 118 kg 16 Plat hitam 14 mm 87 kg 17 PO BLOCK Ǿ 35 mm 16 pcs 18 Per Tarik380X120X10 10 pcs 19 Eye Bolt M 14 10 pcs 20 Roda teflon / nylon 6 “ 2 Set 21 Mur 1 " 8 pcs 22 Mur M18 4 pcs 23 Mur Baut M14x55 20 pcs 24 Mur Baut M12x60 10 pcs 25 Mur Baut M8x35 40 pcs 26 Mur Baut M6x25 100 pcs 27 As Drat 1” 2 Batang 28 As Drat M18 3 Batang 29 Plat strip 9x50 4 Batang II. Pemberat 1 Plat besi 1000 Kg III. Finishing 1 powder coating 1 Gallon IV. Sefti Benturan 1 Triplek 9 mm 8 Lembar 2 Busa rebondit 8 cm 3 Lembar 3 Busa Black 5 cm 3 Lembar 4 Busa Black 3cm 1 Lembar 5 Lem 2 Galon 6 Kain Peding 22 Meter V. Papan Pantul 1 Acrilik 2 Lembar 1800mmX1050mmX15 mm 2 Siku bending 8 Batang 60x40x1800x2 3 Siku bending 8 Batang 40x40x1050x2 4 Silen 3 botol 5 Dempul 1 kg 6 Holo 40x40x2 1 Batang 7 Plat ezer 6 mm 2 kg 8 Plat ezer 2 mm 1 kg 9 Plat ezer 8mm 10 Kg 10 Mur baud M 12X60 10 Pcs 11 Mur baud M 12X30 10 Pcs 12 Busa ati 15mm 1 lembar 13 Kain peding 3 meter 14 lem aica aibon 1 kg
VI. Cincin Ring
1 Assential Ǿ 20 ST 40 1 1batang 2 Per Tekan 80X30X8 4 pcs 3 Assential Ǿ 16 ST 40 2 kg 4 Plat ezer 1,5 mm 1 kg 5 Pipa lobang 16 mm 1 kg 6 Mur baut M 12x100 4 Pcs 7 Baut M6x15 4 pcs 8 Plat bending 5 mm 2 set 9 Pipa besi Ǿ 10 1 Batang 10 Jaring nylon 1 set
Harga : Rp. 120.000.000
Biaya Pengiriman : Rp. 18.000.000 Total : RP. 138.000.000