 SUMMARY OF PIPELINE

Total  HDPE PIPE D.I PIPES


Total Pipe  Avg  Avg  Total 
No of  Duration  No of  Duratio
SL No. Zones Length  Productivi Duration Total  Producti Duration  REMARKS
Teams by dia  OD 63 OD 110 OD 180 OD 225 OD 280 OD 315 Teams n
(m.) ty vity by dia wise DN 300 DN 400 DN 600
wise

Productivity/LM  75 75 60 60 55 55
1 Zone‐1 1204.000 70 1 17 18 307.00 332.00 565.00 0.00 0.00 0.00 0.00 0.00 0.00
4 4 9 0 0 0

2 Zone‐2A 10733.900 66 3 54 56 2958.80 4459.30 3315.80 0 688.00 0 543.00 35 1 16 16 543.00 0 0


39 59 55 0 13 0 16 0 0
3 Zone‐2B 12909.300 70 3 61 60 4867.50 5324.20 2717.60 0 0 0 0.00 0 0 0
65 71 45 0 0 0
4 Zone‐2C 10761.250 70 2 77 75 3638.45 5314.80 1808.00 0 0 0 0.00 0 0 0
49 71 30 0 0 0
5 Zone‐2D 7823.600 63 2 62 58 1914.60 2760.00 2398.00 720.00 81.00 31.00 0.00 0 0 0
26 37 40 12 1 1
6 Zone‐2E 14076.950 63 4 56 56 2496.55 4264.00 4327.00 1943.40 544.00 1046.00 1542.00 35 1 44 44 1542.00 0 0
33 57 72 32 10 19 44 0 0
Productivity Unit
Excavation, 
Bedding 
1 m 75 75 60 60 55 55 35 30 25
Prerparatio
n, 
Intial 
2 m
Pressure 

You might also like