IJM CONSTRUCTION SDN BHD

JANICE ANG YIZING 133475


TRAINING PERIOD: 1 JULY - 6 SEP 2019

COMPANY BACKGROUND TRAINING LIST & TIMEFRAME


IJM began as a daring dream of a group of civil engineers who
were ahead of their time. It was formed in 1983 to compete as
equals with well-capitalised foreign players who had entered the
growing Malaysian construction industry.
IJM now celebrates 35 years of a winning game, with a footprint
that has grown across the world.

PROJECT ORGANIZATION

TRAINING OUTCOME
Assisted the design
of temporary wet
riser system by
determined the
ACHIEVEMENT
pump head and flow
1. Construction Industry Development Board (CIDB)
required
Certificate of Achievement SCORE 5-Star Rating
2. Malaysian Construction Industry Excellence Awards
Best Project Award for a Major Project (Building)
Supervized the
Best Infrastructure Project Award
transportation
3. Compliance to ISO 9001:2008, ISO 9001:2015
process of AHU and
installation of
PROJECT INVOLVED ducting.

Assisted Technical
team in Revit BIM
Execution of 1 block of 47 storey offices which compromise of: coordination for
1) 43 storeys of commercial offices sanitary piping
2) 4 storeys of podium car park with 3 storeys of basement car system.
park on Lot PT 169 [Plot 5(C7.9)] Tun Razak Exchange,
Seksyen 67, Jalan Tun Razak, Kuala Lumpur for Affin Bank
Berhad.
PROBLEMS FACED & SOLUTIONS
Problems:
JOB CLASSIFICATION Insufficient period of industrial training
QAQC is to control the quality of Unfamiliar with construction legends and terms
every single work trait, incoming
materials and also update the Solution:
drawings from consultants or sub Extend the industrial training period to at least 3
contractors. months
SHO is to maintain the To have collaboration with more companies for pre-
environment in site and take internship program which allows student to have
responsibility of the site to provide earlier exposure to the industry.
a good surroundings to work.
On-site supervision is to notice
the problem on site and propose
References:
solutions. https://www.ijm.com/our-business/awards