www.pertamina-ep.com 0
Outline
01 Background
02 PEP Profile
03 Challenges &
Opportunities
04 Development Drilling
05 Waterflood Project
06 EOR Project
www.pep.pertamina.com 1
About John Hisar Simamora
EDUCATION
S1 – Bandung Institute of Technology
Petroleum Engineering (graduated in 1989)
S2 - Gadjah Mada University
Business Administration (graduated in 1998)
S2 – Bandung Institute of Technology
Petroleum Engineering (graduated in 2003)
EXPERIENCE
Development Director PT Pertamina EP (2017- present)
Chairman of IATMI (2019-2022)
Director of PT PEPC ADK (2015-2017)
VP Production of PT PEP CEPU (2013-2015)
VP Project & Planning of PT PEP CEPU (2013)
2
CURRENT CONDITION
Production
Performance in 2018
11% 11%
PEP
Mbopd
PEP
Gas Production
Oil Production
OTHERS OTHERS
89% 89%
ya? hmm
3
EP
PERTAMINA EP COMPANY PROFILE
Didirikan pada
113.629 km2 3,866 155
Wilayah Operasi Sumber Daya Manusia Kabupaten di Indonesia 13 September 2005
ASSET 1
ASSET 5
ASSET 2
ASSET 4
ASSET 3
4
PERTAMINA EP
BUSSINESS PROCESS
credit @ freepic.com
Industri Petrokimia
Sumur 2 Industri Petrokimia
Sumur 2 Terminal
Stasiun Pengumpul Minyak Terminal
Sumur 3
Sumur 3
SP Utama Trunk Line (Kilang DN)
Minyak Trunk Line (Kilang DN)
SP Utama Minyak
Air
Air
Sumur N
Sumur 1 Pusat Pengumpul minyak Produksi
Pusat Pengumpul minyak Produksi
5
PERTAMINA EP
STRATEGIC POLICY
Growth
Pengembangan Strategy
peluang baru di
struktur lama
EOR
Existing Strategy
Waterflood
Financial
Optimasi Pengembangan
produksi Eksplorasi
Excellence
existing
6
CHALLENGES AND OPPORTUNITIES
7
DEVELOPMENT REPORT
DEVELOPMENT DRILLING 2019
SUMUR BOR 2015 - 2019
Infill Drilling Step Out New Development
18,000
16,000
NEW
NEW
DEVELOPMENT DEVELOPMENT
9% 17% INFILL
(19 WELLS) (1,612 MBO)
14,000 54%
STEP OUT
29%
INFILL (5,150 MBO) NEW
(63 WELLS)
62% STEP OUT
(133 WELLS) 29% DEVELOPMENT
12,000 (2,778 MBO)
19 SUMUR
10,000
4,000
INFILL
133 SUMUR
2,000
ASSET 1 ASSET 5
ASSET 1 ASSET 5
11 SUMUR 49 SUMUR
Pencapaian Bor
Eksploitasi Sumur
ASSET 3
ASSET 3
14 SUMUR
ASSET 4
ASSET
4 SUMUR
4
52
SUMUR
ASSET 2
ASSET 2 MITRA
16 SUMUR 1 SUMUR
99 267
119
53 243
94
95
52
9 8
5 8 24 24 6
1 1 Own 2
RKAP 2019 SELESAI ON GOING RKAP 2019 SELESAI ON GOING
Mitra
9
PERTAMINA EP WATERFLOOD PROJECT
Total 45 Struktur
1 Field Rantau 1 12
Field Tanjung
9 Field ADERA 10 Field Jatibarang 11 Field Cepu
3
• Rantau
• Abab • Cemara Kawengan Tanjung
• K. Simpang Barat
• Raja • Randegan
• Dewa 13 Field Sangatta
2 Field P. Susu
1 Sangatta
• Gebang
• P. Tabuhan
Timur 4 14 Field Sanga-Sanga
2 15
N. Kutai Lama
5
3 Field Lirik 14
16
• Sago 15
13
• Lirik 7
12
• North Pulai
9
3
4 Field Jambi
• Bajubang
6
• Kenali Asam 10
• Tempino 11
• Sungai Gelam
8 15 Field Tarakan
8 Field Prabumulih
5 Field Ramba Sembakung
• Beringin D
• Ramba 6 Field Pendopo 7 Field Limau • Talang Jimar 16 Field Papua
• Bentayan • T. Tiga Barat
• Jirak • Niru Klamono
• Mangunjaya • T. Miring Timur
• Sopa • Belimbing
• Kluang • Ogan
• Talang Akar • Limau Barat
• Limau Tengah • G. Kemala Tengah
Pendopo
• Limau Q-51 • G. Kemala Barat
• Limau Q-22 • G. Kemala Timur
• Limau P • Prabumulih Barat
10
PERTAMINA EP EOR PROJECT
1 Field Rantau
Rantau C Legend C Chemical C CO2
1
2 Field Lirik
Sago C
4 Field Limau
Limau Q-51 C
2
5 1
Structure Structure
3
5 Field Tanjung 6
Tanjung C
6 Field Sukowati
Sukowati C
WORKFLOW Phase Lab Test & GGRP Study Field Trial Pilot POD, FEED, FID Procurement Project Implementation (EPC)
CEOR & CO2 Duration 1-4 years 1-2 years 1-2 years 1-2 years 1 years Drilling & WO 2-5 years
1
STRUCTURE Asset 3OOIP Metode 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032-2035
Tanjung* 5 620 SP/ASP
P 100
P
50
I
Sumur Injeksi
P Sumur Produksi 0
Dec-18 Mar-19 Jun-19 Sep-19 Dec-19 Mar-20 Jun-20 Sep-20 Dec-20 Mar-21 Jun-21 Sep-21 Dec-21
12