DESALINATED WATER SUPPLY FOR

SPENCE GROWTHOPTIONS PROJECT

KAPATUR-DESALINATION PLANT 66 kV Transmission Line


OPGW Stringing Chart Report - US1

Doc. Nº: SGO-NPIW-EXE-PSP-EFG-00201


Revision: B Date: 24/04/19
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 2 of 108

CHANGE LOG

SECTION / PARAGRAPH
REV. DATE AFFECTED REASONS FOR CHANGE
____ _______ ______________________ _____________________________

TEDAGUA Doc. No.: SGO-NPIW-EXE-PSP-EFG-00201


DESALINATION PLANT, POWER SUPPLY

B 24/04/2019 For Comments M.G.M.F. R. Krause R. Krause

A 13/03/2019 Internal Review M.G.M.F. R. Krause R. Krause

Rev. Date Description Prepared Checked Approved


DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 3 of 108

Contents
1 INTRODUCTION ....................................................................................................... 4

2 PURPOSE .................................................................................................................... 4

3 REFERENCES............................................................................................................. 4
3.1 GENERAL PROJECT DOCUMENTATION ............................................................. 4
3.2 TRANSMISSION LINE CURRENT ENGINEERING DOCUMENTS .................... 5

4 APPLICABLE CODES, STANDARDS AND DESIGN GUIDELINES ................... 5


4.1 SUPERINTENDENCIA DE ELECTRICIDAD Y COMBUSTIBLES (SEC) ........... 5
4.2 COMISIÓN NACIONAL DE ENERGÍA (CNE) ....................................................... 5
4.3 ENDESA/TRANSELEC DESIGN GUIDELINES AND SPECIFICATIONS ........... 5
4.4 IEEE STANDARDS .................................................................................................... 6
4.5 IEC STANDARDS ...................................................................................................... 6

5 BASIS OF CALCULATIONS..................................................................................... 7
5.1 GENERAL CONDITIONS.......................................................................................... 7
5.2 SUPPORTING STRUCTURES DATA ...................................................................... 8
5.3 PROPOSED OVERHEAD CONDUCTORS AND WIRES DATA ........................... 8
5.4 OVERHEAD CONDUCTOR SAGGING CONDITIONS ......................................... 9
5.5 STRINGING CHARTS CRITERIA AND METHODOLOGY ................................ 11

6 STRINGING CHART INITIAL CONDITION ......................................................... 12

7 STRINGING CHART FINAL CONDITION............................................................ 58

APPENDIX A ........................................................................................................................ 106


DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 4 of 108

1 INTRODUCTION

The Spence Growth Option Project (SGO) includes the construction of three (3) transmission
line sections as part of the power supply system for the project.

As part of the current project stage, the Client has required an alignment modification for the
proposed 66 kV transmission line KAPATUR - DESALINATION PLANT.
The alignment modification refers to the section from V2 point (structure No. 8) up to an
intermediate point between structures No. 19 and 20, and is due to right-of-way
interferences. The engineering update cover to structure No. 28, because of this is the closer
dead-end structure in the modified section.

2 PURPOSE

This report provides conductor stringing charts for the alignment modification required in the
66 kV transmission line KAPATUR - DESALINATION PLANT. The sag and tension values in
the stringing charts are in accordance with mechanical design of the transmission line as
included in the document Nº SGO-NPIW-EXE-PSP-EFP-00212.
The calculations included here are based on specific site and project conditions and have
been performed to meet the design requirements and criteria specified for the transmission
line in order to guarantee compliance with requirements from local regulations and good
engineering design recommendations and practices.

3 REFERENCES

This section details the references used in this document.

3.1 GENERAL PROJECT DOCUMENTATION

3.1.1 SGO-NPIW-EXE-PSP-GEO-00001 Site Conditions.


3.1.2 SGO-NPIW-EXE-PSP-GRD-00001 Design Criteria.
3.1.3 SGO-NPIW-EXE-PSP-GRD-00003 Design life.
3.1.4 SGO-NPIW-EXE-PSP-GRD-00004 Existing Infrastructure
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 5 of 108

3.2 TRANSMISSION LINE CURRENT ENGINEERING DOCUMENTS

3.2.1 SGO-NPIW-EXE-PSP-ERD-00201 Alignment modification - Design Criteria.


3.2.2 SGO-NPIW-EXE-PSP-ELS-00201 Structures Staking Table.

3.2.3 SGO-NPIW-EXE-PSP-EFP-00212 Line electromechanical design Calculation Report.


3.2.4 SGO-NPIW-EXE-PSP-EDL-00201 Alignment modification - Plan.
3.2.5 SGO-NPIW-EXE-PSP-EDL-00202 Alignment modification - Longitudinal Profile
conventional symbols.
3.2.6 SGO-NPIW-EXE-PSP-EDL-00203 Alignment modification - Longitudinal Profile (1 of 4).
3.2.7 SGO-NPIW-EXE-PSP-EDL-00204 Alignment modification - Longitudinal Profile (2 of 4).

3.2.8 SGO-NPIW-EXE-PSP-EDL-00228 Alignment modification - Longitudinal Profile (3 of 4).


3.2.9 SGO-NPIW-EXE-PSP-EDL-00229 Alignment modification - Longitudinal Profile (4 of 4).

4 APPLICABLE CODES, STANDARDS AND DESIGN GUIDELINES

This section details the applicable codes, standards, local regulations and common design
guidelines and specifications for the transmission line project.

4.1 SUPERINTENDENCIA DE ELECTRICIDAD Y COMBUSTIBLES (SEC)

4.1.1 NSEG 5 E.n71, Reglamento de Instalaciones Eléctricas de Corrientes Fuertes.

4.1.2 NSEG 6 E.n71, Cruces y Paralelismos de Líneas Eléctricas.

4.2 COMISIÓN NACIONAL DE ENERGÍA (CNE)

4.2.1 NTSyCS, Norma Técnica de Seguridad y Calidad de Servicio.

4.3 ENDESA/TRANSELEC DESIGN GUIDELINES AND SPECIFICATIONS

4.3.1 Redes de Energía Eléctrica – Segunda Parte: Líneas de Transmisión. Subgerencia de


Producción ENDESA.
4.3.2 ETG-A.2.01, Especificaciones Técnicas Generales - Condiciones Generales de Diseño
Eléctrico de Líneas de Transmisión.
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 6 of 108

4.4 IEEE STANDARDS

4.4.1 738. Standard for Calculating the Current-Temperature Relationship of Bare Overhead
Conductors.

4.5 IEC STANDARDS

4.5.1 60826. Design Criteria of Overhead Transmission Lines.


DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 7 of 108

5 BASIS OF CALCULATIONS

5.1 GENERAL CONDITIONS

5.1.1 Proposed transmission line design parameters


Basic line design parameters are listed in Table 5-1.

TABLE 5-1
LINE DESIGN PARAMETERS
PARAMETER DESCRIPTION
Maximum elevation above sea level [m] 130
Latitude 23.1º S
NSEG 5 geographic zone (Art. 112º) III (below 2000 m)
NSEG 5 line class (Art. 94º) C (≥ 25 kV)
Design air temperatures [ºC]:
Maximum 35
Average 15
Minimum -5
Design maximum wind pressures [kg/m2]: (according to NSEG 5)
Conductor and cables 40
Structures 80
Radial ice on conductors [mm] Not applicable
Insulation pollution level (IEC 60815) Very High (31 mm/kVff)
Keraunic level Low (2)
Nominal phase-to-phase operating voltage
66
[kV]
Nominal transmission frequency [Hz] 50
Maximum expected power transfer [MVA] 30 (p/circuit)

5.1.2 Proposed transmission line physical configuration


5.1.2.1 Overhead circuits: one (1) three-phase 66 kV circuit.
5.1.2.2 Overhead ground wire: one (1) OPGW type, 48 fibers.
5.1.2.3 Underground: three (3) underground intermediate sections on duct bank along crossing
areas with existing overhead transmission lines.
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 8 of 108

5.1.2.4 Underbuild circuits: no underbuild circuits under the line.

5.1.2.5 Communications wires: no communications wires under the line.

5.2 SUPPORTING STRUCTURES DATA

Proposed supporting structures types are:


5.2.1 Tangent structure S1: single self-supported R.C. poles with line post insulators for conductor
support.
5.2.2 Angle and deadend structures A40 and A40.T: double guyed (portal type) R.C. poles with
galvanized steel cross-arms.

See Appendix A for proposed structures outlines and dimensions.

5.3 PROPOSED OVERHEAD CONDUCTORS AND WIRES DATA

5.3.1 Overhead phase conductor


Basic data for conductor are listed in Table 5-2.

TABLE 5-2
PHASE CONDUCTOR DATA
DESCRIPTION VALUE
Cable type AAAC DARIEN
Material Aluminum alloy 6201-T81 (x19)
Outer diameter [mm] 21.79
Cross section area [mm2] 283.5
Weight [kg/m] 0.781
Ultimate Tensile Strength (UTS) [kg] 8527
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 9 of 108

5.3.2 Overhead ground wire


Basic data for ground wire are listed in Table 5-3.

TABLE 5-3
GROUND WIRE DATA
DESCRIPTION VALUE
Cable type OPGW 48B1-55 [67;37.3]
Material ACS (aluminum clad steel) x13
Outer diameter [mm] 12.2
Cross section area [mm2] 54.01
Weight [kg/m] 0.4365
Rated Tensile Strength (RTS) [kg] 6791.3

5.4 OVERHEAD OPGW WIRE SAGGING CONDITIONS


According to OPGW wire mechanical design, the following sagging conditions were defined:

TABLE 5-4
OPGW SAGGING CONDITIONS BY TENSION SECTION

Sag Sagging
Inicio Est Fin Est # Vano reg. Voltaje Cond. por Sagging Sagging
Sec # Temperature Catenary
# Set # Set # (m) (kV) fase Condition Tension (kg)
(ºC) (m)
1 1 2 0 141.4 1 Initial RS 15 1000 436.5
2 2 6 0 119.9 1 Initial RS 15 913.3 398.6
3 6 8 0 127.9 1 Initial RS 15 913.3 398.6
4 8 11 0 144.7 1 Initial RS 15 1227.7 535.9
5 11 21 0 145.3 1 Initial RS 15 1020.4 445.4
6 21 23 0 78.3 1 Initial RS 15 913.3 398.6
7 23 25 0 126.6 1 Initial RS 15 913.3 398.6
8 25 27 0 135.6 1 Initial RS 15 1109 484.1
9 27 35 0 128.2 1 Initial RS 15 1237 540.0
10 35 39 0 119.3 1 Initial RS 15 913.3 398.6
11 39 42 0 127 1 Initial RS 15 978.5 427.1
12 42 53 0 147.4 1 Initial RS 15 978.5 427.1
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 10 of 108

13 53 66 0 150 1 Initial RS 15 1017.7 444.2


14 66 77 0 143 1 Initial RS 15 978.5 427.1
15 77 79 0 86.8 1 Initial RS 15 913.3 398.6
16 79 81 0 150.9 1 Initial RS 15 1476.8 644.6
17 81 83 0 133.1 1 Initial RS 15 978.5 427.1
18 83 91 0 150.9 1 Initial RS 15 1017.7 444.2
19 91 95 0 147.3 1 Initial RS 15 1054.3 460.2
20 95 102 0 149.2 1 Initial RS 15 1132.8 494.5
21 102 108 0 150.2 Initial RS 15 1199.8 523.7
22 108 112 0 144.2 Initial RS 15 1090 475.8
23 112 119 0 145.5 Initial RS 15 978.5 427.1
24 119 128 0 138.5 Initial RS 15 913.3 398.6
25 128 136 0 144.2 Initial RS 15 978.5 427.1
26 136 137 0 91.5 Initial RS 15 913.3 398.6
27 137 143 0 126.1 Initial RS 15 913.3 398.6
28 143 157 0 141.7 Initial RS 15 978.5 427.1
29 157 163 0 146 Initial RS 15 1030.5 449.8
30 163 167 0 120.8 Initial RS 15 978.5 427.1
31 167 170 0 138 Initial RS 15 1477.1 644.8
32 170 172 0 204.6 Initial RS 15 1258.3 549.2
33 172 173 0 96.4 Initial RS 15 1262.2 550.9
34 173 175 0 154.9 Initial RS 15 1499.8 654.6
35 175 182 0 162 Initial RS 15 1474.2 643.5
36 182 186 0 191.2 Initial RS 15 1445.1 630.8
37 186 186-A 0 148.3 Initial RS 15 1264.7 552.1
38 186-A 189 0 208.4 Initial RS 15 1043.7 455.6
39 189 200 0 152.7 Initial RS 15 1109 484.1
40 200 202 0 115 Initial RS 15 978.5 427.1
41 202 206 0 118 Initial RS 15 1109 484.1
42 206 210 0 144 Initial RS 15 978.5 427.1
43 210 216 0 127.5 Initial RS 15 1180.6 515.3
44 216 219 0 134.5 Initial RS 15 978.5 427.1
45 219 225 0 143.7 Initial RS 15 978.5 427.1
46 225 228 0 120.7 Initial RS 15 978.5 427.1
47 228 233 0 122.9 Initial RS 15 1487.2 649.2
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 11 of 108

48 233 234 0 121.1 Initial RS 15 978.5 427.1


49 234 235 0 128.1 Initial RS 15 1512.9 660.4
50 235 236 0 114 Initial RS 15 1043.7 455.6

Sagging conditions are defined at 15 ºC, no wind, initial condition.


Sagging values are applicable to OPGW wire.

5.5 STRINGING CHARTS CRITERIA AND METHODOLOGY


Stringing charts provide sag and tension values based on actual geometry of the spans
(horizontal and vertical projection).
Values provided include the following sagging control methods:
 Midspan sag, in meters (m).
 Wave time (5 returns), in seconds (s).
 Horizontal tension, in kilogram (kg).

Stringing charts are obtained from computer model analysis for the following options:
 INITIAL condition: installlation condition for new conductor (no pretension), before creep,
clipped (on clamps). No insulator offsets nor sag corrections are performed for conductor
on sheaves while there is no hilly terrain condition.
 FINAL condition: aged conductor after creep, clipped (on clamps). This condition is
provided only for future verification purposes.

Stringing charts are provided for a temperature range from 0 up to 50 ºC, at 5 ºC steps.
Temperatures corresponds to conductor temperature, not the air temperature, hence,
adequate measures shall be performed for stringing control purposes.
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 12 of 108

6 STRINGING CHART INITIAL CONDITION

SECTION #1 OPGW AT INITIAL CONDITION


Between structures 1-2 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.45 Middle span sag [m] 2.26 2.34 2.42 2.5 2.58 2.66 2.73 2.81 2.88 2.96 3.03
Span length [m] 141.45 Horiz. Tension [kg] 482.195 465.88 450.714 436.409 423.254 410.96 399.529 388.673 378.678 369.114 360.125
Span vertical proj. [m] 1.19 Wave time 5 [seg] 13.59 13.82 14.05 14.28 14.5 14.72 14.93 15.14 15.33 15.53 15.72

SECTION #2 OPGW AT INITIAL CONDITION


Between structures 2-3 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 119.93 Middle span sag [m] 1.97 2.05 2.13 2.21 2.29 2.37 2.44 2.52 2.6 2.67 2.74
Span length [m] 126.99 Horiz. Tension [kg] 447.26 429.511 413.484 398.894 385.166 372.3 360.583 349.728 339.448 330.03 321.187
Span vertical proj. [m] 4.47 Wave time 5 [seg] 12.67 12.93 13.18 13.42 13.65 13.89 14.11 14.33 14.54 14.75 14.95
Between structures 3-4 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 119.93 Middle span sag [m] 1.97 2.05 2.13 2.21 2.28 2.36 2.44 2.52 2.59 2.67 2.74
Span length [m] 126.91 Horiz. Tension [kg] 447.26 429.511 413.484 398.894 385.166 372.3 360.583 349.728 339.448 330.03 321.187
Span vertical proj. [m] 4.51 Wave time 5 [seg] 12.66 12.92 13.17 13.41 13.64 13.88 14.1 14.32 14.54 14.74 14.94
Between structures 4-5 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 119.93 Middle span sag [m] 1.97 2.05 2.13 2.21 2.29 2.37 2.44 2.52 2.6 2.67 2.74
Span length [m] 127.01 Horiz. Tension [kg] 447.26 429.511 413.484 398.894 385.166 372.3 360.583 349.728 339.448 330.03 321.187
Span vertical proj. [m] 5.28 Wave time 5 [seg] 12.67 12.93 13.18 13.42 13.66 13.89 14.12 14.33 14.55 14.76 14.96
Between structures 5-6 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 13 of 108

Ruling span [m] 119.93 Middle span sag [m] 0.47 0.49 0.51 0.53 0.55 0.56 0.58 0.6 0.62 0.64 0.65
Span length [m] 62.02 Horiz. Tension [kg] 447.26 429.511 413.484 398.894 385.166 372.3 360.583 349.728 339.448 330.03 321.187
Span vertical proj. [m] 2.31 Wave time 5 [seg] 6.19 6.31 6.44 6.55 6.67 6.78 6.89 7 7.1 7.2 7.3

SECTION #3 OPGW AT INITIAL CONDITION


Between structures 6-7 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.94 Middle span sag [m] 2.13 2.21 2.28 2.36 2.44 2.51 2.59 2.66 2.73 2.81 2.88
Span length [m] 131.26 Horiz. Tension [kg] 442.032 426.58 412.276 398.547 386.256 374.538 363.682 353.689 344.27 335.425 327.156
Span vertical proj. [m] 5.59 Wave time 5 [seg] 13.17 13.41 13.64 13.88 14.09 14.31 14.53 14.73 14.93 15.13 15.32
Between structures 7-8 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.94 Middle span sag [m] 1.93 2 2.07 2.14 2.2 2.27 2.34 2.41 2.47 2.54 2.6
Span length [m] 124.76 Horiz. Tension [kg] 442.032 426.58 412.276 398.547 386.256 374.538 363.682 353.689 344.27 335.425 327.156
Span vertical proj. [m] 8.16 Wave time 5 [seg] 12.53 12.75 12.97 13.2 13.4 13.61 13.81 14.01 14.2 14.39 14.57

SECTION #4 OPGW AT INITIAL CONDITION


Between structures 8-9 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.67 Middle span sag [m] 2.57 2.67 2.78 2.89 2.99 3.1 3.21 3.32 3.43 3.54 3.65
Span length [m] 168.37 Horiz. Tension [kg] 602.925 579.428 557.081 535.882 516.981 498.654 481.477 466.023 451.144 437.414 424.545
Span vertical proj. [m] -2.41 Wave time 5 [seg] 14.46 14.75 15.05 15.34 15.62 15.91 16.19 16.45 16.72 16.98 17.24
Between structures 9 - 10 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.67 Middle span sag [m] 1.45 1.51 1.57 1.63 1.69 1.75 1.81 1.87 1.94 2 2.06
Span length [m] 126.52 Horiz. Tension [kg] 602.925 579.428 557.081 535.882 516.981 498.654 481.477 466.023 451.144 437.414 424.545
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 14 of 108

Span vertical proj. [m] 1.13 Wave time 5 [seg] 10.87 11.09 11.31 11.53 11.74 11.95 12.16 12.36 12.56 12.76 12.95
Between structures 10 - 11 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.67 Middle span sag [m] 1.45 1.51 1.57 1.63 1.69 1.75 1.81 1.87 1.93 1.99 2.06
Span length [m] 126.43 Horiz. Tension [kg] 602.925 579.428 557.081 535.882 516.981 498.654 481.477 466.023 451.144 437.414 424.545
Span vertical proj. [m] 1.5 Wave time 5 [seg] 10.86 11.08 11.3 11.52 11.73 11.94 12.15 12.35 12.56 12.75 12.94

SECTION #5 OPGW AT INITIAL CONDITION


Between structures 11 - 12 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.98 3.05 3.13
Span length [m] 145.22 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -0.03 Wave time 5 [seg] 13.82 14.06 14.29 14.51 14.74 14.95 15.16 15.37 15.57 15.77 15.96
Between structures 12 - 13 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.97 3.05 3.12
Span length [m] 145.2 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -0.78 Wave time 5 [seg] 13.82 14.06 14.29 14.51 14.73 14.95 15.16 15.37 15.57 15.77 15.96
Between structures 13 - 14 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.98 3.05 3.13
Span length [m] 145.22 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -1.49 Wave time 5 [seg] 13.82 14.06 14.29 14.51 14.74 14.95 15.16 15.37 15.57 15.77 15.96
Between structures 14 - 15 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.97 3.05 3.12
Span length [m] 145.17 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 15 of 108

Span vertical proj. [m] -0.11 Wave time 5 [seg] 13.82 14.05 14.28 14.51 14.73 14.94 15.16 15.36 15.57 15.77 15.95
Between structures 15 - 16 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.51 2.58 2.66 2.74 2.82 2.9 2.98 3.05 3.13
Span length [m] 145.23 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -2.23 Wave time 5 [seg] 13.82 14.06 14.29 14.51 14.74 14.95 15.16 15.37 15.57 15.77 15.96
Between structures 16 - 17 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.97 3.05 3.12
Span length [m] 145.18 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -1.35 Wave time 5 [seg] 13.82 14.05 14.28 14.51 14.73 14.95 15.16 15.37 15.57 15.77 15.96
Between structures 17 - 18 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.97 3.05 3.12
Span length [m] 145.2 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -0.5 Wave time 5 [seg] 13.82 14.06 14.29 14.51 14.73 14.95 15.16 15.37 15.57 15.77 15.96
Between structures 18 - 19 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.97 3.05 3.12
Span length [m] 145.22 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -0.54 Wave time 5 [seg] 13.82 14.06 14.29 14.51 14.74 14.95 15.16 15.37 15.57 15.77 15.96
Between structures 19 - 20 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.37 2.45 2.54 2.62 2.7 2.78 2.86 2.93 3.01 3.09 3.16
Span length [m] 146.11 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -0.15 Wave time 5 [seg] 13.91 14.14 14.38 14.6 14.83 15.04 15.26 15.46 15.67 15.87 16.06
Between structures 20 - 21 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.97 3.05 3.12
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 16 of 108

Span length [m] 145.18 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] 0.44 Wave time 5 [seg] 13.82 14.05 14.28 14.51 14.73 14.95 15.16 15.37 15.57 15.77 15.96

SECTION #6 OPGW AT INITIAL CONDITION


Between structures 21 - 22 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 78.35 Middle span sag [m] 0.69 0.73 0.78 0.83 0.88 0.94 0.99 1.04 1.1 1.15 1.2
Span length [m] 77.99 Horiz. Tension [kg] 483.112 452.153 424.067 398.278 375.362 354.168 335.273 318.389 302.941 289.217 276.642
Span vertical proj. [m] 0.06 Wave time 5 [seg] 7.48 7.74 7.99 8.24 8.49 8.74 8.98 9.22 9.45 9.67 9.89
Between structures 22 - 23 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 78.35 Middle span sag [m] 0.7 0.75 0.8 0.85 0.9 0.95 1.01 1.06 1.12 1.17 1.22
Span length [m] 78.7 Horiz. Tension [kg] 483.112 452.153 424.067 398.278 375.362 354.168 335.273 318.389 302.941 289.217 276.642
Span vertical proj. [m] 0.38 Wave time 5 [seg] 7.55 7.81 8.06 8.32 8.57 8.82 9.07 9.3 9.54 9.76 9.98

SECTION #7 OPGW AT INITIAL CONDITION


Between structures 23 - 24 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.59 Middle span sag [m] 2.07 2.15 2.23 2.3 2.38 2.45 2.53 2.6 2.68 2.75 2.82
Span length [m] 129.72 Horiz. Tension [kg] 443.192 427.164 412.286 398.845 385.979 374.261 363.406 353.124 343.419 334.575 326.017
Span vertical proj. [m] -0.28 Wave time 5 [seg] 13 13.24 13.48 13.7 13.93 14.14 14.35 14.56 14.77 14.96 15.16
Between structures 24 - 25 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.59 Middle span sag [m] 1.87 1.94 2.01 2.08 2.15 2.21 2.28 2.35 2.41 2.48 2.54
Span length [m] 123.21 Horiz. Tension [kg] 443.192 427.164 412.286 398.845 385.979 374.261 363.406 353.124 343.419 334.575 326.017
Span vertical proj. [m] 0.27 Wave time 5 [seg] 12.34 12.57 12.8 13.01 13.23 13.43 13.63 13.83 14.02 14.21 14.39
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 17 of 108

SECTION #8 OPGW AT INITIAL CONDITION


Between structures 25 - 26 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 135.63 Middle span sag [m] 2.42 2.52 2.62 2.72 2.83 2.93 3.03 3.13 3.23 3.33 3.43
Span length [m] 155.45 Horiz. Tension [kg] 544.334 522.562 502.513 484.188 466.435 450.408 435.53 421.513 408.646 396.64 385.21
Span vertical proj. [m] 1.66 Wave time 5 [seg] 14.05 14.34 14.63 14.9 15.18 15.45 15.71 15.97 16.22 16.47 16.71
Between structures 26 - 27 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 135.63 Middle span sag [m] 0.9 0.94 0.98 1.01 1.05 1.09 1.13 1.16 1.2 1.24 1.27
Span length [m] 94.74 Horiz. Tension [kg] 544.334 522.562 502.513 484.188 466.435 450.408 435.53 421.513 408.646 396.64 385.21
Span vertical proj. [m] 5.37 Wave time 5 [seg] 8.57 8.75 8.92 9.09 9.26 9.42 9.58 9.74 9.89 10.04 10.19

SECTION #9 OPGW AT INITIAL CONDITION


Between structures 27 - 28 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 0.89 0.94 0.98 1.02 1.07 1.11 1.16 1.2 1.25 1.29 1.34
Span length [m] 100.54 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] -0.31 Wave time 5 [seg] 8.53 8.73 8.93 9.13 9.33 9.52 9.72 9.9 10.09 10.27 10.45
Between structures 28 - 29 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 1.73 1.81 1.9 1.98 2.07 2.16 2.25 2.33 2.42 2.51 2.6
Span length [m] 139.97 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] -5.67 Wave time 5 [seg] 11.89 12.16 12.44 12.72 12.99 13.26 13.53 13.79 14.05 14.31 14.56
Between structures 29 - 30 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 1 1.05 1.1 1.15 1.2 1.25 1.3 1.35 1.4 1.45 1.5
Span length [m] 106.5 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 18 of 108

Span vertical proj. [m] 0.18 Wave time 5 [seg] 9.04 9.25 9.46 9.67 9.88 10.09 10.29 10.49 10.69 10.88 11.07
Between structures 30 - 31 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 1.25 1.31 1.37 1.43 1.49 1.55 1.62 1.68 1.74 1.81 1.87
Span length [m] 118.8 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] 2.06 Wave time 5 [seg] 10.08 10.32 10.55 10.79 11.02 11.25 11.48 11.7 11.92 12.14 12.35
Between structures 31 - 32 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 1.64 1.71 1.79 1.87 1.95 2.04 2.12 2.2 2.29 2.37 2.45
Span length [m] 135.99 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] 6.48 Wave time 5 [seg] 11.55 11.82 12.08 12.36 12.62 12.89 13.15 13.4 13.66 13.9 14.15
Between structures 32 - 33 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 1.64 1.71 1.79 1.87 1.95 2.04 2.12 2.2 2.29 2.37 2.45
Span length [m] 135.96 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] 6.89 Wave time 5 [seg] 11.55 11.81 12.08 12.36 12.62 12.89 13.15 13.4 13.65 13.9 14.14
Between structures 33 - 34 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 1.49 1.56 1.63 1.7 1.78 1.85 1.93 2.01 2.08 2.16 2.23
Span length [m] 129.8 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] 0.17 Wave time 5 [seg] 11.02 11.27 11.53 11.79 12.04 12.29 12.54 12.78 13.03 13.26 13.49
Between structures 34 - 35 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 1.73 1.81 1.89 1.98 2.06 2.15 2.24 2.32 2.41 2.5 2.59
Span length [m] 139.72 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] -5.39 Wave time 5 [seg] 11.86 12.14 12.41 12.69 12.96 13.24 13.51 13.77 14.03 14.28 14.53
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 19 of 108

SECTION #10 OPGW AT INITIAL CONDITION


Between structures 35 - 36 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 119.32 Middle span sag [m] 1.67 1.74 1.81 1.87 1.94 2.01 2.07 2.14 2.2 2.27 2.33
Span length [m] 116.98 Horiz. Tension [kg] 447.264 430.09 413.776 398.611 384.883 372.305 360.301 349.445 339.165 329.46 320.616
Span vertical proj. [m] 0.05 Wave time 5 [seg] 11.67 11.9 12.13 12.36 12.58 12.79 13 13.2 13.4 13.6 13.78
Between structures 36 - 37 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 119.32 Middle span sag [m] 1.67 1.74 1.81 1.88 1.94 2.01 2.08 2.14 2.2 2.27 2.33
Span length [m] 117 Horiz. Tension [kg] 447.264 430.09 413.776 398.611 384.883 372.305 360.301 349.445 339.165 329.46 320.616
Span vertical proj. [m] -4.55 Wave time 5 [seg] 11.67 11.9 12.14 12.37 12.58 12.8 13.01 13.21 13.41 13.6 13.79
Between structures 37 - 38 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 119.32 Middle span sag [m] 1.8 1.87 1.94 2.02 2.09 2.16 2.23 2.3 2.37 2.44 2.51
Span length [m] 121.31 Horiz. Tension [kg] 447.264 430.09 413.776 398.611 384.883 372.305 360.301 349.445 339.165 329.46 320.616
Span vertical proj. [m] -0.76 Wave time 5 [seg] 12.1 12.34 12.58 12.82 13.04 13.26 13.48 13.69 13.9 14.1 14.29
Between structures 38 - 39 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 119.32 Middle span sag [m] 1.82 1.89 1.97 2.04 2.11 2.19 2.26 2.33 2.4 2.47 2.54
Span length [m] 122 Horiz. Tension [kg] 447.264 430.09 413.776 398.611 384.883 372.305 360.301 349.445 339.165 329.46 320.616
Span vertical proj. [m] -6.73 Wave time 5 [seg] 12.18 12.42 12.66 12.9 13.13 13.35 13.57 13.78 13.98 14.19 14.38

SECTION #11 OPGW AT INITIAL CONDITION


Between structures 39 - 40 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.07 Middle span sag [m] 2.02 2.1 2.18 2.26 2.35 2.43 2.51 2.58 2.66 2.74 2.81
Span length [m] 133 Horiz. Tension [kg] 478.265 459.941 442.765 427.312 412.434 398.705 386.126 374.409 363.554 353.272 343.853
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 20 of 108

Span vertical proj. [m] 8.38 Wave time 5 [seg] 12.84 13.09 13.35 13.58 13.83 14.06 14.29 14.51 14.73 14.94 15.15
Between structures 40 - 41 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.07 Middle span sag [m] 1.56 1.62 1.69 1.75 1.81 1.87 1.94 2 2.06 2.12 2.17
Span length [m] 117.01 Horiz. Tension [kg] 478.265 459.941 442.765 427.312 412.434 398.705 386.126 374.409 363.554 353.272 343.853
Span vertical proj. [m] -0.16 Wave time 5 [seg] 11.28 11.51 11.73 11.94 12.15 12.36 12.56 12.76 12.94 13.13 13.31
Between structures 41 - 42 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.07 Middle span sag [m] 1.94 2.02 2.09 2.17 2.25 2.33 2.4 2.48 2.55 2.63 2.7
Span length [m] 130.17 Horiz. Tension [kg] 478.265 459.941 442.765 427.312 412.434 398.705 386.126 374.409 363.554 353.272 343.853
Span vertical proj. [m] -9.83 Wave time 5 [seg] 12.57 12.82 13.07 13.3 13.54 13.77 13.99 14.21 14.42 14.63 14.83

SECTION #12 OPGW AT INITIAL CONDITION


Between structures 42 - 43 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.63 2.71 2.79 2.88 2.96 3.04 3.12 3.2 3.28 3.36 3.43
Span length [m] 150 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] 2.71 Wave time 5 [seg] 14.64 14.87 15.09 15.31 15.53 15.74 15.95 16.15 16.35 16.54 16.73
Between structures 43 - 44 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.25 2.33 2.39 2.47 2.54 2.61 2.67 2.74 2.81 2.88 2.94
Span length [m] 138.63 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -12.25 Wave time 5 [seg] 13.55 13.77 13.97 14.18 14.38 14.58 14.77 14.95 15.14 15.31 15.49
Between structures 44 - 45 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.65 2.73 2.81 2.89 2.97 3.04 3.12 3.2 3.27 3.35
Span length [m] 148.11 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 21 of 108

Span vertical proj. [m] -5.74 Wave time 5 [seg] 14.45 14.69 14.9 15.12 15.34 15.55 15.75 15.95 16.15 16.34 16.53
Between structures 45 - 46 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.12 3.2 3.27 3.35
Span length [m] 148.09 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -1.05 Wave time 5 [seg] 14.45 14.68 14.9 15.11 15.33 15.54 15.74 15.94 16.14 16.33 16.52
Between structures 46 - 47 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.12 3.2 3.27 3.35
Span length [m] 148.1 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -0.78 Wave time 5 [seg] 14.45 14.68 14.9 15.12 15.33 15.54 15.74 15.94 16.14 16.33 16.52
Between structures 47 - 48 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.12 3.2 3.27 3.35
Span length [m] 148.09 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -0.81 Wave time 5 [seg] 14.45 14.68 14.9 15.11 15.33 15.54 15.74 15.94 16.14 16.33 16.52
Between structures 48 - 49 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.12 3.2 3.27 3.35
Span length [m] 148.12 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -0.19 Wave time 5 [seg] 14.45 14.68 14.9 15.12 15.33 15.55 15.75 15.95 16.14 16.33 16.52
Between structures 49 - 50 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.12 3.19 3.27 3.35
Span length [m] 148.07 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -0.44 Wave time 5 [seg] 14.45 14.68 14.89 15.11 15.33 15.54 15.74 15.94 16.14 16.33 16.52
Between structures 50 - 51 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.12 3.2 3.27 3.35
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 22 of 108

Span length [m] 148.11 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -0.31 Wave time 5 [seg] 14.45 14.68 14.9 15.12 15.33 15.54 15.75 15.94 16.14 16.33 16.52
Between structures 51 - 52 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.12 3.2 3.27 3.35
Span length [m] 148.1 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -0.65 Wave time 5 [seg] 14.45 14.68 14.9 15.12 15.33 15.54 15.74 15.94 16.14 16.33 16.52
Between structures 52 - 53 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.65 2.73 2.81 2.89 2.97 3.04 3.12 3.2 3.28 3.35
Span length [m] 148.18 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -0.07 Wave time 5 [seg] 14.46 14.69 14.91 15.12 15.34 15.55 15.75 15.95 16.15 16.34 16.53

SECTION #13 OPGW AT INITIAL CONDITION


Between structures 53 - 54 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 150.01 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 0.14 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.25 16.44
Between structures 54 - 55 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 149.99 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 0.36 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.25 16.43
Between structures 55 - 56 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 23 of 108

Span length [m] 150.01 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 0.21 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.25 16.44
Between structures 56 - 57 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 149.99 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.04 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.25 16.44
Between structures 57 - 58 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 150.02 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.21 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.45 15.65 15.86 16.05 16.25 16.44
Between structures 58 - 59 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 149.99 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.05 Wave time 5 [seg] 14.33 14.56 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.25 16.43
Between structures 59 - 60 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 150 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.24 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.25 16.44
Between structures 60 - 61 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.69 2.77 2.85 2.93 3.01 3.08 3.16 3.24 3.32
Span length [m] 150.03 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.18 Wave time 5 [seg] 14.34 14.57 14.8 15.01 15.24 15.45 15.66 15.86 16.05 16.25 16.44
Between structures 61 - 62 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 24 of 108

Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.84 2.92 3 3.08 3.16 3.24 3.31
Span length [m] 149.92 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.19 Wave time 5 [seg] 14.33 14.56 14.78 15 15.22 15.44 15.64 15.85 16.04 16.24 16.43
Between structures 62 - 63 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 149.99 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.35 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.25 16.44
Between structures 63 - 64 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.69 2.77 2.85 2.93 3.01 3.09 3.16 3.24 3.32
Span length [m] 150.05 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.33 Wave time 5 [seg] 14.34 14.57 14.8 15.02 15.24 15.45 15.66 15.86 16.06 16.25 16.44
Between structures 64 - 65 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 150.01 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.57 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.45 15.65 15.86 16.05 16.25 16.44
Between structures 65 - 66 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.84 2.92 3 3.08 3.16 3.24 3.31
Span length [m] 149.95 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 2.03 Wave time 5 [seg] 14.33 14.56 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.24 16.43
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 25 of 108

SECTION #14 OPGW AT INITIAL CONDITION


Between structures 66 - 67 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.45 2.53 2.61 2.69 2.77 2.84 2.92 2.99 3.07 3.14
Span length [m] 142.94 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.4 Wave time 5 [seg] 13.91 14.15 14.37 14.59 14.81 15.02 15.22 15.43 15.62 15.82 16
Between structures 67 - 68 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.54 2.61 2.69 2.77 2.85 2.92 3 3.07 3.14
Span length [m] 143 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 2.22 Wave time 5 [seg] 13.92 14.15 14.38 14.59 14.81 15.02 15.23 15.43 15.63 15.82 16.01
Between structures 68 - 69 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.54 2.61 2.69 2.77 2.85 2.92 3 3.07 3.15
Span length [m] 143.04 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 0.9 Wave time 5 [seg] 13.92 14.15 14.38 14.6 14.82 15.03 15.23 15.44 15.63 15.83 16.01
Between structures 69 - 70 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.53 2.61 2.69 2.77 2.85 2.92 3 3.07 3.14
Span length [m] 142.99 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.46 Wave time 5 [seg] 13.92 14.15 14.37 14.59 14.81 15.02 15.23 15.43 15.63 15.82 16.01
Between structures 70 - 71 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.53 2.61 2.69 2.77 2.84 2.92 3 3.07 3.14
Span length [m] 142.98 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.74 Wave time 5 [seg] 13.92 14.15 14.37 14.59 14.81 15.02 15.23 15.43 15.63 15.82 16.01
Between structures 71 - 72 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 26 of 108

Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.54 2.62 2.69 2.77 2.85 2.92 3 3.07 3.15
Span length [m] 143.05 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.77 Wave time 5 [seg] 13.93 14.16 14.38 14.6 14.82 15.03 15.24 15.44 15.63 15.83 16.02
Between structures 72 - 73 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.54 2.61 2.69 2.77 2.85 2.92 3 3.07 3.15
Span length [m] 143.02 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.83 Wave time 5 [seg] 13.92 14.15 14.38 14.6 14.82 15.03 15.23 15.44 15.63 15.83 16.01
Between structures 73 - 74 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.53 2.61 2.69 2.77 2.84 2.92 2.99 3.07 3.14
Span length [m] 142.97 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.57 Wave time 5 [seg] 13.92 14.15 14.37 14.59 14.81 15.02 15.23 15.43 15.62 15.82 16.01
Between structures 74 - 75 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.54 2.61 2.69 2.77 2.85 2.92 3 3.07 3.14
Span length [m] 143 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 2.2 Wave time 5 [seg] 13.92 14.15 14.38 14.6 14.82 15.02 15.23 15.43 15.63 15.82 16.01
Between structures 75 - 76 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.53 2.61 2.69 2.77 2.84 2.92 3 3.07 3.14
Span length [m] 142.97 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.7 Wave time 5 [seg] 13.92 14.15 14.37 14.59 14.81 15.02 15.23 15.43 15.63 15.82 16.01
Between structures 76 - 77 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.37 2.44 2.52 2.6 2.68 2.76 2.83 2.91 2.98 3.06 3.13
Span length [m] 142.65 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.43 Wave time 5 [seg] 13.89 14.12 14.34 14.56 14.78 14.99 15.19 15.4 15.59 15.78 15.97
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 27 of 108

SECTION #15 OPGW AT INITIAL CONDITION


Between structures 77 - 78 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 86.82 Middle span sag [m] 0.92 0.98 1.04 1.1 1.16 1.22 1.28 1.34 1.4 1.46 1.52
Span length [m] 89.52 Horiz. Tension [kg] 473.882 446.369 421.154 398.236 377.617 358.721 341.836 326.387 312.375 299.512 288.085
Span vertical proj. [m] 1.2 Wave time 5 [seg] 8.67 8.94 9.2 9.46 9.72 9.97 10.21 10.45 10.68 10.91 11.13
Between structures 78 - 79 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 86.82 Middle span sag [m] 0.81 0.86 0.91 0.96 1.02 1.07 1.12 1.18 1.23 1.28 1.33
Span length [m] 83.87 Horiz. Tension [kg] 473.882 446.369 421.154 398.236 377.617 358.721 341.836 326.387 312.375 299.512 288.085
Span vertical proj. [m] 1.3 Wave time 5 [seg] 8.13 8.37 8.62 8.86 9.1 9.34 9.57 9.79 10.01 10.22 10.42

SECTION #16 OPGW AT INITIAL CONDITION


Between structures 79 - 80 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.9 Middle span sag [m] 2.27 2.36 2.47 2.57 2.67 2.78 2.89 3 3.11 3.22 3.33
Span length [m] 174.18 Horiz. Tension [kg] 730.51 700.695 671.454 645.085 619.864 595.792 573.444 552.245 532.769 514.729 497.839
Span vertical proj. [m] 1.71 Wave time 5 [seg] 13.59 13.88 14.18 14.47 14.76 15.05 15.34 15.63 15.92 16.19 16.47
Between structures 80 - 81 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.9 Middle span sag [m] 0.63 0.66 0.68 0.71 0.74 0.77 0.8 0.83 0.86 0.89 0.92
Span length [m] 91.78 Horiz. Tension [kg] 730.51 700.695 671.454 645.085 619.864 595.792 573.444 552.245 532.769 514.729 497.839
Span vertical proj. [m] 1.87 Wave time 5 [seg] 7.16 7.31 7.47 7.62 7.78 7.93 8.08 8.24 8.39 8.53 8.68
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 28 of 108

SECTION #17 OPGW AT INITIAL CONDITION


Between structures 81 - 82 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 133.1 Middle span sag [m] 2.03 2.11 2.18 2.26 2.34 2.41 2.48 2.56 2.63 2.7 2.77
Span length [m] 132.99 Horiz. Tension [kg] 474.776 457.599 441.859 426.981 413.252 400.673 388.667 377.524 367.243 357.535 348.404
Span vertical proj. [m] 0.59 Wave time 5 [seg] 12.87 13.11 13.34 13.58 13.8 14.01 14.23 14.44 14.64 14.84 15.03
Between structures 82 - 83 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 133.1 Middle span sag [m] 2.04 2.12 2.19 2.27 2.34 2.42 2.49 2.57 2.64 2.71 2.78
Span length [m] 133.23 Horiz. Tension [kg] 474.776 457.599 441.859 426.981 413.252 400.673 388.667 377.524 367.243 357.535 348.404
Span vertical proj. [m] 1.64 Wave time 5 [seg] 12.9 13.14 13.37 13.6 13.82 14.04 14.26 14.46 14.67 14.86 15.06

SECTION #18 OPGW AT INITIAL CONDITION


Between structures 83 - 84 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.54 2.62 2.7 2.78 2.86 2.94 3.02 3.1 3.18 3.25 3.33
Span length [m] 150.45 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 1.59 Wave time 5 [seg] 14.38 14.61 14.84 15.06 15.27 15.48 15.69 15.9 16.09 16.29 16.47
Between structures 84 - 85 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.54 2.62 2.7 2.78 2.87 2.95 3.03 3.1 3.18 3.26 3.33
Span length [m] 150.55 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 3.1 Wave time 5 [seg] 14.39 14.62 14.85 15.07 15.28 15.5 15.71 15.91 16.11 16.3 16.49
Between structures 85 - 86 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.54 2.62 2.7 2.78 2.86 2.94 3.02 3.1 3.18 3.26 3.33
Span length [m] 150.52 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 29 of 108

Span vertical proj. [m] 2.66 Wave time 5 [seg] 14.39 14.62 14.84 15.06 15.28 15.49 15.7 15.9 16.1 16.29 16.48
Between structures 86 - 87 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.54 2.62 2.7 2.78 2.86 2.94 3.02 3.1 3.18 3.25 3.33
Span length [m] 150.47 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 2.24 Wave time 5 [seg] 14.38 14.61 14.84 15.06 15.28 15.49 15.7 15.9 16.1 16.29 16.48
Between structures 87 - 88 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.54 2.62 2.7 2.78 2.86 2.94 3.02 3.1 3.18 3.26 3.33
Span length [m] 150.5 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 1.95 Wave time 5 [seg] 14.39 14.62 14.84 15.06 15.28 15.49 15.7 15.9 16.1 16.29 16.48
Between structures 88 - 89 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.54 2.62 2.7 2.78 2.87 2.95 3.03 3.1 3.18 3.26 3.33
Span length [m] 150.54 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 1.59 Wave time 5 [seg] 14.39 14.62 14.85 15.06 15.28 15.49 15.7 15.91 16.1 16.3 16.48
Between structures 89 - 90 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.54 2.62 2.7 2.78 2.86 2.94 3.02 3.1 3.18 3.25 3.33
Span length [m] 150.43 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 1.37 Wave time 5 [seg] 14.38 14.61 14.83 15.05 15.27 15.48 15.69 15.89 16.09 16.28 16.47
Between structures 90 - 91 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.65 2.74 2.82 2.91 2.99 3.07 3.16 3.24 3.32 3.4 3.48
Span length [m] 153.8 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 1.34 Wave time 5 [seg] 14.7 14.94 15.17 15.39 15.61 15.83 16.04 16.25 16.45 16.65 16.84
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 30 of 108

SECTION #19 OPGW AT INITIAL CONDITION


Between structures 91 - 92 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.33 Middle span sag [m] 2.36 2.45 2.53 2.61 2.69 2.77 2.85 2.93 3.01 3.09 3.17
Span length [m] 148.35 Horiz. Tension [kg] 508.034 491.144 475.115 460.235 446.218 433.062 421.056 409.625 398.768 388.773 379.064
Span vertical proj. [m] 2.86 Wave time 5 [seg] 13.88 14.12 14.36 14.59 14.82 15.04 15.25 15.46 15.67 15.87 16.08
Between structures 92 - 93 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.33 Middle span sag [m] 2.32 2.4 2.48 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.11
Span length [m] 147.01 Horiz. Tension [kg] 508.034 491.144 475.115 460.235 446.218 433.062 421.056 409.625 398.768 388.773 379.064
Span vertical proj. [m] 3.02 Wave time 5 [seg] 13.76 13.99 14.23 14.46 14.68 14.9 15.11 15.32 15.53 15.73 15.93
Between structures 93 - 94 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.33 Middle span sag [m] 2.32 2.4 2.48 2.56 2.65 2.73 2.8 2.88 2.96 3.04 3.11
Span length [m] 147.04 Horiz. Tension [kg] 508.034 491.144 475.115 460.235 446.218 433.062 421.056 409.625 398.768 388.773 379.064
Span vertical proj. [m] 2.83 Wave time 5 [seg] 13.76 14 14.23 14.46 14.68 14.91 15.12 15.33 15.53 15.73 15.93
Between structures 94 - 95 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.33 Middle span sag [m] 2.32 2.4 2.48 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.11
Span length [m] 147.01 Horiz. Tension [kg] 508.034 491.144 475.115 460.235 446.218 433.062 421.056 409.625 398.768 388.773 379.064
Span vertical proj. [m] 3.1 Wave time 5 [seg] 13.76 13.99 14.23 14.46 14.68 14.9 15.11 15.32 15.53 15.73 15.93

SECTION #20 OPGW AT INITIAL CONDITION


Between structures 95 - 96 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.23 Middle span sag [m] 2.19 2.27 2.35 2.43 2.51 2.59 2.67 2.75 2.83 2.91 2.99
Span length [m] 148.45 Horiz. Tension [kg] 549.425 529.949 511.623 494.444 478.703 463.825 449.806 436.65 424.644 413.212 402.355
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 31 of 108

Span vertical proj. [m] 1.51 Wave time 5 [seg] 13.36 13.6 13.84 14.08 14.31 14.54 14.76 14.99 15.2 15.41 15.61
Between structures 96 - 97 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.23 Middle span sag [m] 2.19 2.27 2.35 2.44 2.52 2.6 2.68 2.76 2.84 2.91 2.99
Span length [m] 148.52 Horiz. Tension [kg] 549.425 529.949 511.623 494.444 478.703 463.825 449.806 436.65 424.644 413.212 402.355
Span vertical proj. [m] 1.2 Wave time 5 [seg] 13.36 13.61 13.85 14.09 14.32 14.55 14.77 14.99 15.2 15.41 15.62
Between structures 97 - 98 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.23 Middle span sag [m] 2.19 2.27 2.35 2.43 2.51 2.59 2.68 2.76 2.83 2.91 2.99
Span length [m] 148.49 Horiz. Tension [kg] 549.425 529.949 511.623 494.444 478.703 463.825 449.806 436.65 424.644 413.212 402.355
Span vertical proj. [m] 0.97 Wave time 5 [seg] 13.36 13.61 13.85 14.09 14.32 14.54 14.77 14.99 15.2 15.41 15.62
Between structures 98 - 99 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.23 Middle span sag [m] 2.19 2.27 2.35 2.44 2.52 2.6 2.68 2.76 2.84 2.92 2.99
Span length [m] 148.54 Horiz. Tension [kg] 549.425 529.949 511.623 494.444 478.703 463.825 449.806 436.65 424.644 413.212 402.355
Span vertical proj. [m] 1.55 Wave time 5 [seg] 13.37 13.61 13.85 14.09 14.32 14.55 14.77 15 15.21 15.42 15.62
Between structures 99 - 100 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.23 Middle span sag [m] 2.19 2.27 2.35 2.43 2.51 2.6 2.68 2.76 2.84 2.91 2.99
Span length [m] 148.5 Horiz. Tension [kg] 549.425 529.949 511.623 494.444 478.703 463.825 449.806 436.65 424.644 413.212 402.355
Span vertical proj. [m] 2.12 Wave time 5 [seg] 13.36 13.61 13.85 14.09 14.32 14.55 14.77 14.99 15.2 15.41 15.62
Between structures 100 - 101 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.23 Middle span sag [m] 2.19 2.27 2.35 2.43 2.51 2.59 2.67 2.76 2.83 2.91 2.99
Span length [m] 148.45 Horiz. Tension [kg] 549.425 529.949 511.623 494.444 478.703 463.825 449.806 436.65 424.644 413.212 402.355
Span vertical proj. [m] 2.82 Wave time 5 [seg] 13.36 13.6 13.84 14.08 14.31 14.54 14.77 14.99 15.2 15.41 15.61
Between structures 101 - 102 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.23 Middle span sag [m] 2.34 2.43 2.52 2.6 2.69 2.77 2.86 2.95 3.03 3.12 3.2
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 32 of 108

Span length [m] 153.54 Horiz. Tension [kg] 549.425 529.949 511.623 494.444 478.703 463.825 449.806 436.65 424.644 413.212 402.355
Span vertical proj. [m] 3.01 Wave time 5 [seg] 13.82 14.07 14.32 14.57 14.8 15.04 15.27 15.5 15.72 15.93 16.15

SECTION #21 OPGW AT INITIAL CONDITION


Between structures 102 - 103 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.15 Middle span sag [m] 2.07 2.15 2.23 2.31 2.39 2.47 2.56 2.64 2.72 2.8 2.88
Span length [m] 148.93 Horiz. Tension [kg] 584.494 562.721 542.671 523.769 505.729 489.413 473.672 459.08 445.636 433.055 421.048
Span vertical proj. [m] 3.08 Wave time 5 [seg] 12.99 13.24 13.49 13.73 13.97 14.2 14.44 14.66 14.88 15.1 15.31
Between structures 103 - 104 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.15 Middle span sag [m] 2.63 2.74 2.84 2.94 3.05 3.15 3.25 3.36 3.46 3.56 3.66
Span length [m] 167.96 Horiz. Tension [kg] 584.494 562.721 542.671 523.769 505.729 489.413 473.672 459.08 445.636 433.055 421.048
Span vertical proj. [m] 2.86 Wave time 5 [seg] 14.65 14.94 15.21 15.48 15.76 16.02 16.28 16.54 16.79 17.03 17.27
Between structures 104 - 105 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.15 Middle span sag [m] 1.58 1.64 1.7 1.76 1.82 1.88 1.95 2.01 2.07 2.13 2.19
Span length [m] 129.97 Horiz. Tension [kg] 584.494 562.721 542.671 523.769 505.729 489.413 473.672 459.08 445.636 433.055 421.048
Span vertical proj. [m] 1.62 Wave time 5 [seg] 11.34 11.56 11.77 11.98 12.19 12.39 12.6 12.79 12.99 13.17 13.36
Between structures 105 - 106 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.15 Middle span sag [m] 2.07 2.15 2.23 2.31 2.39 2.47 2.56 2.64 2.72 2.8 2.88
Span length [m] 148.94 Horiz. Tension [kg] 584.494 562.721 542.671 523.769 505.729 489.413 473.672 459.08 445.636 433.055 421.048
Span vertical proj. [m] 1.24 Wave time 5 [seg] 12.99 13.24 13.49 13.73 13.97 14.2 14.44 14.66 14.88 15.1 15.31
Between structures 106 - 107 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.15 Middle span sag [m] 2.07 2.15 2.23 2.31 2.4 2.48 2.56 2.64 2.72 2.8 2.88
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 33 of 108

Span length [m] 148.96 Horiz. Tension [kg] 584.494 562.721 542.671 523.769 505.729 489.413 473.672 459.08 445.636 433.055 421.048
Span vertical proj. [m] 2.28 Wave time 5 [seg] 13 13.25 13.49 13.73 13.97 14.2 14.44 14.67 14.89 15.1 15.31
Between structures 107 - 108 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.15 Middle span sag [m] 2.07 2.16 2.23 2.32 2.4 2.48 2.56 2.64 2.72 2.8 2.88
Span length [m] 149.05 Horiz. Tension [kg] 584.494 562.721 542.671 523.769 505.729 489.413 473.672 459.08 445.636 433.055 421.048
Span vertical proj. [m] 3.31 Wave time 5 [seg] 13.01 13.25 13.5 13.74 13.98 14.21 14.45 14.68 14.9 15.11 15.32

SECTION #22 OPGW AT INITIAL CONDITION


Between structures 108 - 109 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.18 Middle span sag [m] 2.14 2.23 2.31 2.39 2.47 2.55 2.62 2.7 2.78 2.86 2.94
Span length [m] 144.21 Horiz. Tension [kg] 529.332 509.856 492.104 475.502 460.335 445.743 432.588 420.007 408.001 397.144 386.862
Span vertical proj. [m] 2.59 Wave time 5 [seg] 13.22 13.47 13.71 13.95 14.18 14.41 14.63 14.84 15.06 15.27 15.47
Between structures 109 - 110 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.18 Middle span sag [m] 2.14 2.23 2.31 2.39 2.47 2.55 2.62 2.7 2.78 2.86 2.93
Span length [m] 144.18 Horiz. Tension [kg] 529.332 509.856 492.104 475.502 460.335 445.743 432.588 420.007 408.001 397.144 386.862
Span vertical proj. [m] 2.74 Wave time 5 [seg] 13.22 13.47 13.71 13.95 14.18 14.41 14.62 14.84 15.06 15.26 15.46
Between structures 110 - 111 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.18 Middle span sag [m] 2.14 2.23 2.31 2.39 2.47 2.55 2.62 2.7 2.78 2.86 2.94
Span length [m] 144.21 Horiz. Tension [kg] 529.332 509.856 492.104 475.502 460.335 445.743 432.588 420.007 408.001 397.144 386.862
Span vertical proj. [m] 3.63 Wave time 5 [seg] 13.22 13.47 13.71 13.95 14.18 14.41 14.63 14.85 15.06 15.27 15.47
Between structures 111 - 112 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.18 Middle span sag [m] 2.15 2.23 2.31 2.39 2.47 2.55 2.63 2.7 2.78 2.86 2.94
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 34 of 108

Span length [m] 144.23 Horiz. Tension [kg] 529.332 509.856 492.104 475.502 460.335 445.743 432.588 420.007 408.001 397.144 386.862
Span vertical proj. [m] 1.96 Wave time 5 [seg] 13.22 13.47 13.71 13.95 14.18 14.41 14.63 14.85 15.06 15.27 15.47

SECTION #23 OPGW AT INITIAL CONDITION


Between structures 112 - 113 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.49 Middle span sag [m] 2.62 2.71 2.8 2.88 2.96 3.05 3.13 3.21 3.29 3.37 3.45
Span length [m] 150.05 Horiz. Tension [kg] 468.363 453.483 439.753 427.172 414.879 403.735 393.165 383.17 373.749 364.904 356.633
Span vertical proj. [m] 3.35 Wave time 5 [seg] 14.63 14.86 15.1 15.32 15.54 15.75 15.97 16.17 16.38 16.57 16.76
Between structures 113 - 114 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.49 Middle span sag [m] 2.45 2.53 2.61 2.69 2.77 2.84 2.92 3 3.07 3.15 3.22
Span length [m] 145 Horiz. Tension [kg] 468.363 453.483 439.753 427.172 414.879 403.735 393.165 383.17 373.749 364.904 356.633
Span vertical proj. [m] 3.32 Wave time 5 [seg] 14.13 14.36 14.59 14.8 15.02 15.22 15.43 15.63 15.82 16.01 16.2
Between structures 114 - 115 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.49 Middle span sag [m] 2.45 2.53 2.61 2.69 2.77 2.84 2.92 3 3.07 3.15 3.22
Span length [m] 145 Horiz. Tension [kg] 468.363 453.483 439.753 427.172 414.879 403.735 393.165 383.17 373.749 364.904 356.633
Span vertical proj. [m] 3.08 Wave time 5 [seg] 14.13 14.36 14.59 14.8 15.02 15.23 15.43 15.63 15.82 16.02 16.2
Between structures 115 - 116 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.49 Middle span sag [m] 2.45 2.53 2.61 2.69 2.77 2.84 2.92 3 3.07 3.15 3.22
Span length [m] 145.01 Horiz. Tension [kg] 468.363 453.483 439.753 427.172 414.879 403.735 393.165 383.17 373.749 364.904 356.633
Span vertical proj. [m] 3.42 Wave time 5 [seg] 14.14 14.37 14.59 14.8 15.02 15.23 15.43 15.63 15.83 16.02 16.2
Between structures 116 - 117 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.49 Middle span sag [m] 2.42 2.5 2.58 2.65 2.73 2.81 2.88 2.96 3.03 3.1 3.18
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 35 of 108

Span length [m] 144.03 Horiz. Tension [kg] 468.363 453.483 439.753 427.172 414.879 403.735 393.165 383.17 373.749 364.904 356.633
Span vertical proj. [m] 2.86 Wave time 5 [seg] 14.04 14.27 14.49 14.7 14.92 15.12 15.32 15.52 15.72 15.91 16.09
Between structures 117 - 118 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.49 Middle span sag [m] 2.48 2.56 2.65 2.72 2.8 2.88 2.96 3.04 3.11 3.19 3.26
Span length [m] 145.97 Horiz. Tension [kg] 468.363 453.483 439.753 427.172 414.879 403.735 393.165 383.17 373.749 364.904 356.633
Span vertical proj. [m] 2.51 Wave time 5 [seg] 14.23 14.46 14.68 14.9 15.12 15.33 15.53 15.73 15.93 16.12 16.31
Between structures 118 - 119 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.49 Middle span sag [m] 2.39 2.47 2.55 2.62 2.7 2.78 2.85 2.93 3 3.07 3.14
Span length [m] 143.3 Horiz. Tension [kg] 468.363 453.483 439.753 427.172 414.879 403.735 393.165 383.17 373.749 364.904 356.633
Span vertical proj. [m] 1.57 Wave time 5 [seg] 13.97 14.19 14.41 14.63 14.84 15.04 15.25 15.44 15.64 15.83 16.01

SECTION #24 OPGW AT INITIAL CONDITION


Between structures 119 - 120 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 2.38 2.46 2.53 2.61 2.68 2.76 2.83 2.9 2.97 3.04 3.11
Span length [m] 137.96 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 2.72 Wave time 5 [seg] 13.93 14.15 14.37 14.58 14.78 14.99 15.19 15.38 15.57 15.75 15.93
Between structures 120 - 121 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 2.38 2.46 2.54 2.61 2.69 2.76 2.83 2.91 2.98 3.05 3.12
Span length [m] 138.06 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 2.98 Wave time 5 [seg] 13.94 14.16 14.38 14.59 14.79 15 15.2 15.39 15.58 15.76 15.94
Between structures 121 - 122 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 2.38 2.46 2.53 2.61 2.68 2.76 2.83 2.9 2.97 3.04 3.11
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 36 of 108

Span length [m] 138 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 3.7 Wave time 5 [seg] 13.93 14.16 14.37 14.59 14.79 14.99 15.19 15.38 15.57 15.75 15.93
Between structures 122 - 123 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 2.38 2.46 2.53 2.61 2.68 2.76 2.83 2.9 2.98 3.05 3.12
Span length [m] 138.03 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 2.61 Wave time 5 [seg] 13.93 14.16 14.37 14.59 14.79 15 15.19 15.39 15.57 15.75 15.94
Between structures 123 - 124 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 2.38 2.46 2.53 2.61 2.68 2.76 2.83 2.9 2.97 3.04 3.11
Span length [m] 137.98 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 2.66 Wave time 5 [seg] 13.93 14.15 14.37 14.58 14.79 14.99 15.19 15.38 15.57 15.75 15.93
Between structures 124 - 125 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 2.95 3.05 3.14 3.24 3.33 3.42 3.51 3.6 3.69 3.78 3.86
Span length [m] 153.72 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 3.39 Wave time 5 [seg] 15.52 15.77 16.01 16.25 16.47 16.7 16.92 17.14 17.35 17.55 17.75
Between structures 125 - 126 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 1.87 1.93 1.99 2.05 2.1 2.16 2.22 2.28 2.33 2.39 2.44
Span length [m] 122.26 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 0.58 Wave time 5 [seg] 12.34 12.54 12.73 12.92 13.1 13.28 13.46 13.63 13.79 13.95 14.11
Between structures 126 - 127 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 2.38 2.46 2.53 2.61 2.68 2.76 2.83 2.9 2.97 3.04 3.11
Span length [m] 138.01 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 0.23 Wave time 5 [seg] 13.93 14.15 14.37 14.58 14.79 14.99 15.19 15.38 15.57 15.75 15.93
Between structures 127 - 128 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 37 of 108

Ruling span [m] 138.54 Middle span sag [m] 2.37 2.45 2.52 2.6 2.67 2.75 2.82 2.89 2.96 3.03 3.1
Span length [m] 137.76 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 3.59 Wave time 5 [seg] 13.91 14.13 14.35 14.56 14.76 14.97 15.17 15.36 15.54 15.73 15.91

SECTION #25 OPGW AT INITIAL CONDITION


Between structures 128 - 129 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.81 2.89 2.97 3.04 3.12 3.19
Span length [m] 144.22 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 1.86 Wave time 5 [seg] 14.05 14.28 14.5 14.72 14.94 15.15 15.36 15.55 15.75 15.94 16.13
Between structures 129 - 130 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.97 3.05 3.12 3.2
Span length [m] 144.28 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 2.57 Wave time 5 [seg] 14.06 14.28 14.51 14.73 14.94 15.15 15.36 15.56 15.76 15.95 16.14
Between structures 130 - 131 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.82 2.89 2.97 3.04 3.12 3.19
Span length [m] 144.25 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 2.71 Wave time 5 [seg] 14.05 14.28 14.51 14.72 14.94 15.15 15.36 15.56 15.75 15.94 16.13
Between structures 131 - 132 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.82 2.89 2.97 3.04 3.12 3.19
Span length [m] 144.25 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 2.62 Wave time 5 [seg] 14.05 14.28 14.51 14.72 14.94 15.15 15.36 15.56 15.75 15.94 16.14
Between structures 132 - 133 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 38 of 108

Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.81 2.89 2.97 3.04 3.12 3.19
Span length [m] 144.22 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 2.87 Wave time 5 [seg] 14.05 14.28 14.5 14.72 14.94 15.15 15.36 15.56 15.75 15.94 16.13
Between structures 133 - 134 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.82 2.89 2.97 3.04 3.12 3.19
Span length [m] 144.24 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 3.07 Wave time 5 [seg] 14.05 14.28 14.51 14.72 14.94 15.15 15.36 15.56 15.75 15.94 16.13
Between structures 134 - 135 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.82 2.89 2.97 3.05 3.12 3.19
Span length [m] 144.27 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 2.58 Wave time 5 [seg] 14.05 14.28 14.51 14.73 14.94 15.15 15.36 15.56 15.76 15.95 16.14
Between structures 135 - 136 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.81 2.89 2.97 3.04 3.12 3.19
Span length [m] 144.18 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 3.33 Wave time 5 [seg] 14.05 14.27 14.5 14.72 14.93 15.14 15.35 15.55 15.75 15.94 16.13

SECTION #26 OPGW AT INITIAL CONDITION


Between structures 136 - 137 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 91.5 Middle span sag [m] 0.97 1.03 1.09 1.15 1.21 1.27 1.33 1.38 1.44 1.5 1.56
Span length [m] 91.54 Horiz. Tension [kg] 469.262 443.472 419.981 398.211 378.74 361.28 344.969 330.382 316.944 304.942 293.515
Span vertical proj. [m] 2.5 Wave time 5 [seg] 8.91 9.17 9.42 9.68 9.92 10.16 10.4 10.62 10.85 11.06 11.27
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 39 of 108

SECTION #27 OPGW AT INITIAL CONDITION


Between structures 137 - 138 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.13 Middle span sag [m] 1.96 2.03 2.1 2.17 2.25 2.32 2.39 2.46 2.53 2.59 2.66
Span length [m] 126.01 Horiz. Tension [kg] 443.195 427.167 412.29 398.849 385.982 374.265 363.122 352.841 343.135 334.291 325.734
Span vertical proj. [m] 2.36 Wave time 5 [seg] 12.63 12.86 13.09 13.31 13.53 13.74 13.95 14.15 14.35 14.54 14.73
Between structures 138 - 139 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.13 Middle span sag [m] 1.96 2.03 2.1 2.17 2.25 2.32 2.39 2.46 2.53 2.59 2.66
Span length [m] 125.99 Horiz. Tension [kg] 443.195 427.167 412.29 398.849 385.982 374.265 363.122 352.841 343.135 334.291 325.734
Span vertical proj. [m] 2.42 Wave time 5 [seg] 12.62 12.86 13.09 13.31 13.53 13.74 13.95 14.15 14.35 14.54 14.73
Between structures 139 - 140 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.13 Middle span sag [m] 1.96 2.03 2.1 2.17 2.25 2.32 2.39 2.46 2.53 2.59 2.66
Span length [m] 126 Horiz. Tension [kg] 443.195 427.167 412.29 398.849 385.982 374.265 363.122 352.841 343.135 334.291 325.734
Span vertical proj. [m] 2.98 Wave time 5 [seg] 12.63 12.86 13.09 13.31 13.53 13.74 13.95 14.15 14.35 14.54 14.73
Between structures 140 - 141 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.13 Middle span sag [m] 1.96 2.03 2.1 2.17 2.25 2.32 2.39 2.46 2.53 2.59 2.66
Span length [m] 125.99 Horiz. Tension [kg] 443.195 427.167 412.29 398.849 385.982 374.265 363.122 352.841 343.135 334.291 325.734
Span vertical proj. [m] 2.66 Wave time 5 [seg] 12.62 12.86 13.09 13.31 13.53 13.74 13.95 14.15 14.35 14.54 14.73
Between structures 141 - 142 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.13 Middle span sag [m] 1.96 2.03 2.1 2.17 2.25 2.32 2.39 2.46 2.53 2.59 2.66
Span length [m] 126.03 Horiz. Tension [kg] 443.195 427.167 412.29 398.849 385.982 374.265 363.122 352.841 343.135 334.291 325.734
Span vertical proj. [m] 2.8 Wave time 5 [seg] 12.63 12.86 13.09 13.31 13.53 13.74 13.95 14.15 14.35 14.54 14.73
Between structures 142 - 143 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 40 of 108

Ruling span [m] 126.13 Middle span sag [m] 1.99 2.06 2.13 2.21 2.28 2.35 2.42 2.49 2.56 2.63 2.7
Span length [m] 126.95 Horiz. Tension [kg] 443.195 427.167 412.29 398.849 385.982 374.265 363.122 352.841 343.135 334.291 325.734
Span vertical proj. [m] 2.94 Wave time 5 [seg] 12.72 12.96 13.19 13.41 13.63 13.84 14.05 14.26 14.46 14.65 14.84

SECTION #28 OPGW AT INITIAL CONDITION


Between structures 143 - 144 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.65 2.72 2.8 2.88 2.95 3.02 3.1
Span length [m] 141.72 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.76 Wave time 5 [seg] 13.79 14.02 14.25 14.47 14.68 14.9 15.11 15.31 15.51 15.7 15.89
Between structures 144 - 145 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.7 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 2.79 Wave time 5 [seg] 13.79 14.02 14.25 14.46 14.68 14.9 15.1 15.31 15.51 15.7 15.88
Between structures 145 - 146 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.7 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.26 Wave time 5 [seg] 13.79 14.02 14.25 14.46 14.68 14.9 15.1 15.31 15.51 15.7 15.89
Between structures 146 - 147 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.68 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.75 Wave time 5 [seg] 13.79 14.02 14.24 14.46 14.68 14.9 15.1 15.31 15.5 15.7 15.88
Between structures 147 - 148 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 41 of 108

Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.65 2.72 2.8 2.88 2.95 3.02 3.1
Span length [m] 141.72 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.6 Wave time 5 [seg] 13.79 14.02 14.25 14.47 14.68 14.9 15.11 15.31 15.51 15.7 15.89
Between structures 148 - 149 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.09
Span length [m] 141.67 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.99 Wave time 5 [seg] 13.79 14.02 14.24 14.46 14.68 14.9 15.1 15.3 15.5 15.69 15.88
Between structures 149 - 150 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.65 2.72 2.8 2.88 2.95 3.02 3.1
Span length [m] 141.73 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.7 Wave time 5 [seg] 13.79 14.02 14.25 14.47 14.68 14.9 15.11 15.31 15.51 15.7 15.89
Between structures 150 - 151 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.7 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.96 Wave time 5 [seg] 13.79 14.02 14.25 14.46 14.68 14.9 15.1 15.31 15.51 15.7 15.89
Between structures 151 - 152 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.69 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.37 Wave time 5 [seg] 13.79 14.02 14.24 14.46 14.68 14.9 15.1 15.31 15.5 15.7 15.88
Between structures 152 - 153 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.72 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 2.93 Wave time 5 [seg] 13.79 14.02 14.25 14.46 14.68 14.9 15.11 15.31 15.51 15.7 15.89
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 42 of 108

Between structures 153 - 154 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50


Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.09
Span length [m] 141.69 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 1.32 Wave time 5 [seg] 13.78 14.02 14.24 14.46 14.68 14.9 15.1 15.3 15.5 15.69 15.88
Between structures 154 - 155 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.7 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 2.47 Wave time 5 [seg] 13.79 14.02 14.25 14.46 14.68 14.9 15.1 15.31 15.5 15.7 15.88
Between structures 155 - 156 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.69 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.24 Wave time 5 [seg] 13.79 14.02 14.24 14.46 14.68 14.9 15.1 15.31 15.5 15.7 15.88
Between structures 156 - 157 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.34 2.42 2.49 2.57 2.65 2.73 2.8 2.88 2.96 3.03 3.1
Span length [m] 141.85 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 2.95 Wave time 5 [seg] 13.8 14.03 14.26 14.48 14.7 14.91 15.12 15.32 15.52 15.71 15.9

SECTION #29 OPGW AT INITIAL CONDITION


Between structures 157 - 158 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 146.03 Middle span sag [m] 2.13 2.2 2.27 2.35 2.42 2.49 2.56 2.63 2.7 2.77 2.84
Span length [m] 139.02 Horiz. Tension [kg] 495.965 479.65 464.197 449.892 436.449 423.867 411.861 401.004 390.578 380.727 371.594
Span vertical proj. [m] 3.95 Wave time 5 [seg] 13.17 13.39 13.61 13.83 14.04 14.25 14.45 14.65 14.84 15.03 15.22
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 43 of 108

Between structures 158 - 159 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50


Ruling span [m] 146.03 Middle span sag [m] 2.25 2.33 2.4 2.48 2.56 2.63 2.71 2.78 2.86 2.93 3
Span length [m] 142.98 Horiz. Tension [kg] 495.965 479.65 464.197 449.892 436.449 423.867 411.861 401.004 390.578 380.727 371.594
Span vertical proj. [m] 3.28 Wave time 5 [seg] 13.54 13.77 14 14.22 14.44 14.65 14.86 15.06 15.26 15.46 15.65
Between structures 159 - 160 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 146.03 Middle span sag [m] 1.06 1.09 1.13 1.17 1.2 1.24 1.28 1.31 1.34 1.38 1.41
Span length [m] 97.94 Horiz. Tension [kg] 495.965 479.65 464.197 449.892 436.449 423.867 411.861 401.004 390.578 380.727 371.594
Span vertical proj. [m] 7.94 Wave time 5 [seg] 9.29 9.45 9.6 9.75 9.9 10.05 10.2 10.33 10.47 10.6 10.73
Between structures 160 - 161 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 146.03 Middle span sag [m] 3.15 3.25 3.36 3.47 3.58 3.68 3.79 3.89 4 4.1 4.2
Span length [m] 169.06 Horiz. Tension [kg] 495.965 479.65 464.197 449.892 436.449 423.867 411.861 401.004 390.578 380.727 371.594
Span vertical proj. [m] -1.19 Wave time 5 [seg] 16.01 16.28 16.55 16.81 17.07 17.32 17.57 17.81 18.05 18.28 18.5
Between structures 161 - 162 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 146.03 Middle span sag [m] 2.48 2.56 2.65 2.73 2.82 2.9 2.98 3.06 3.15 3.23 3.31
Span length [m] 150 Horiz. Tension [kg] 495.965 479.65 464.197 449.892 436.449 423.867 411.861 401.004 390.578 380.727 371.594
Span vertical proj. [m] 5.14 Wave time 5 [seg] 14.21 14.45 14.69 14.92 15.15 15.37 15.6 15.81 16.02 16.22 16.42
Between structures 162 - 163 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 146.03 Middle span sag [m] 2.48 2.56 2.65 2.73 2.81 2.9 2.98 3.06 3.14 3.23 3.3
Span length [m] 149.93 Horiz. Tension [kg] 495.965 479.65 464.197 449.892 436.449 423.867 411.861 401.004 390.578 380.727 371.594
Span vertical proj. [m] 5.42 Wave time 5 [seg] 14.21 14.44 14.68 14.92 15.14 15.37 15.59 15.8 16.01 16.21 16.41
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 44 of 108

SECTION #30 OPGW AT INITIAL CONDITION


Between structures 163 - 164 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 120.79 Middle span sag [m] 1.6 1.67 1.74 1.81 1.88 1.95 2.02 2.09 2.15 2.22 2.29
Span length [m] 119.07 Horiz. Tension [kg] 482.328 462.28 443.956 427.356 411.329 397.027 383.299 371.007 359.577 348.722 338.729
Span vertical proj. [m] 0.13 Wave time 5 [seg] 11.44 11.68 11.92 12.15 12.38 12.61 12.83 13.04 13.25 13.45 13.65
Between structures 164 - 165 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 120.79 Middle span sag [m] 1.13 1.18 1.23 1.27 1.32 1.37 1.42 1.47 1.52 1.56 1.61
Span length [m] 99.9 Horiz. Tension [kg] 482.328 462.28 443.956 427.356 411.329 397.027 383.299 371.007 359.577 348.722 338.729
Span vertical proj. [m] 2.34 Wave time 5 [seg] 9.6 9.8 10 10.19 10.39 10.58 10.76 10.94 11.11 11.29 11.45
Between structures 165 - 166 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 120.79 Middle span sag [m] 1.83 1.91 1.99 2.07 2.15 2.23 2.31 2.39 2.46 2.54 2.61
Span length [m] 127.1 Horiz. Tension [kg] 482.328 462.28 443.956 427.356 411.329 397.027 383.299 371.007 359.577 348.722 338.729
Span vertical proj. [m] 10.99 Wave time 5 [seg] 12.23 12.49 12.75 12.99 13.24 13.48 13.72 13.95 14.17 14.38 14.6
Between structures 166 - 167 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 120.79 Middle span sag [m] 2.01 2.1 2.18 2.27 2.36 2.44 2.53 2.61 2.7 2.78 2.86
Span length [m] 132.31 Horiz. Tension [kg] 482.328 462.28 443.956 427.356 411.329 397.027 383.299 371.007 359.577 348.722 338.729
Span vertical proj. [m] 22.41 Wave time 5 [seg] 12.8 13.07 13.34 13.6 13.86 14.11 14.36 14.59 14.82 15.05 15.27

SECTION #31 OPGW AT INITIAL CONDITION


Between structures 167 - 168 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 137.96 Middle span sag [m] 1.94 2.03 2.12 2.22 2.32 2.42 2.53 2.63 2.74 2.85 2.95
Span length [m] 161.94 Horiz. Tension [kg] 738.043 705.357 674.393 645.154 617.637 591.268 567.198 544.276 523.077 503.602 485.277
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 45 of 108

Span vertical proj. [m] 7.24 Wave time 5 [seg] 12.58 12.87 13.16 13.45 13.75 14.05 14.35 14.65 14.94 15.23 15.51
Between structures 168 - 169 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 137.96 Middle span sag [m] 0.72 0.75 0.79 0.82 0.86 0.9 0.94 0.98 1.02 1.06 1.1
Span length [m] 98.6 Horiz. Tension [kg] 738.043 705.357 674.393 645.154 617.637 591.268 567.198 544.276 523.077 503.602 485.277
Span vertical proj. [m] 5.8 Wave time 5 [seg] 7.66 7.84 8.01 8.19 8.37 8.56 8.74 8.92 9.1 9.27 9.45
Between structures 169 - 169A Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 137.96 Middle span sag [m] 1.35 1.41 1.48 1.54 1.61 1.68 1.76 1.83 1.9 1.98 2.05
Span length [m] 134.99 Horiz. Tension [kg] 738.043 705.357 674.393 645.154 617.637 591.268 567.198 544.276 523.077 503.602 485.277
Span vertical proj. [m] 6.62 Wave time 5 [seg] 10.49 10.73 10.97 11.22 11.46 11.72 11.96 12.21 12.46 12.7 12.93
Between structures 169A - 170 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 137.96 Middle span sag [m] 1.35 1.41 1.47 1.54 1.61 1.68 1.75 1.83 1.9 1.98 2.05
Span length [m] 134.91 Horiz. Tension [kg] 738.043 705.357 674.393 645.154 617.637 591.268 567.198 544.276 523.077 503.602 485.277
Span vertical proj. [m] 6.92 Wave time 5 [seg] 10.48 10.72 10.96 11.21 11.46 11.71 11.96 12.21 12.45 12.69 12.93

SECTION #32 OPGW AT INITIAL CONDITION


Between structures 170 - 171 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 204.55 Middle span sag [m] 0.54 0.55 0.57 0.58 0.6 0.61 0.62 0.64 0.65 0.66 0.68
Span length [m] 76.54 Horiz. Tension [kg] 592.156 577.273 562.963 549.517 536.644 524.346 512.91 501.761 491.475 481.475 472.051
Span vertical proj. [m] 3.7 Wave time 5 [seg] 6.64 6.72 6.81 6.89 6.97 7.05 7.13 7.21 7.29 7.36 7.43
Between structures 171 - 172 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 204.55 Middle span sag [m] 4.97 5.1 5.23 5.36 5.49 5.61 5.74 5.87 5.99 6.12 6.24
Span length [m] 232.05 Horiz. Tension [kg] 592.156 577.273 562.963 549.517 536.644 524.346 512.91 501.761 491.475 481.475 472.051
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 46 of 108

Span vertical proj. [m] 11.72 Wave time 5 [seg] 20.13 20.39 20.65 20.9 21.15 21.39 21.63 21.87 22.1 22.33 22.55

SECTION #33 OPGW AT INITIAL CONDITION


Between structures 172 - 173 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 96.44 Middle span sag [m] 0.77 0.82 0.87 0.92 0.98 1.03 1.09 1.15 1.21 1.27 1.33
Span length [m] 96.44 Horiz. Tension [kg] 655.45 618.171 583.191 550.508 520.122 492.035 466.245 441.602 419.834 399.788 381.466
Span vertical proj. [m] 0.77 Wave time 5 [seg] 7.94 8.18 8.42 8.67 8.92 9.17 9.42 9.68 9.93 10.17 10.42

SECTION #34 OPGW AT INITIAL CONDITION


Between structures 173 - 174 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 154.93 Middle span sag [m] 1.73 1.8 1.87 1.95 2.03 2.11 2.19 2.27 2.35 2.43 2.52
Span length [m] 152.93 Horiz. Tension [kg] 739.687 709.872 681.204 654.835 629.04 605.542 583.194 562.569 542.518 524.478 507.3
Span vertical proj. [m] 4.79 Wave time 5 [seg] 11.86 12.11 12.36 12.61 12.86 13.11 13.36 13.6 13.85 14.09 14.33
Between structures 174 - 175 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 154.93 Middle span sag [m] 1.82 1.89 1.97 2.05 2.14 2.22 2.31 2.39 2.48 2.56 2.65
Span length [m] 156.97 Horiz. Tension [kg] 739.687 709.872 681.204 654.835 629.04 605.542 583.194 562.569 542.518 524.478 507.3
Span vertical proj. [m] 3.69 Wave time 5 [seg] 12.17 12.43 12.69 12.94 13.2 13.46 13.71 13.96 14.22 14.46 14.7

SECTION #35 OPGW AT INITIAL CONDITION


Between structures 175 - 176 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 162 Middle span sag [m] 2.24 2.34 2.43 2.52 2.62 2.71 2.81 2.91 3.01 3.11 3.21
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 47 of 108

Span length [m] 172.33 Horiz. Tension [kg] 722.98 694.887 668.517 643.871 620.373 598.023 577.398 557.92 539.593 522.414 506.384
Span vertical proj. [m] -9.4 Wave time 5 [seg] 13.53 13.8 14.07 14.34 14.6 14.87 15.14 15.4 15.66 15.92 16.17
Between structures 176 - 177 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 162 Middle span sag [m] 2.24 2.33 2.42 2.52 2.61 2.71 2.81 2.91 3 3.1 3.2
Span length [m] 172.35 Horiz. Tension [kg] 722.98 694.887 668.517 643.871 620.373 598.023 577.398 557.92 539.593 522.414 506.384
Span vertical proj. [m] -0.24 Wave time 5 [seg] 13.52 13.79 14.06 14.33 14.6 14.87 15.13 15.39 15.65 15.91 16.16
Between structures 177 - 178 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 162 Middle span sag [m] 1.94 2.01 2.09 2.17 2.26 2.34 2.42 2.51 2.59 2.68 2.76
Span length [m] 159.94 Horiz. Tension [kg] 722.98 694.887 668.517 643.871 620.373 598.023 577.398 557.92 539.593 522.414 506.384
Span vertical proj. [m] -10.44 Wave time 5 [seg] 12.56 12.81 13.06 13.31 13.56 13.81 14.05 14.3 14.54 14.78 15.01
Between structures 178 - 179 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 162 Middle span sag [m] 0.75 0.78 0.82 0.85 0.88 0.91 0.94 0.98 1.01 1.04 1.08
Span length [m] 99.96 Horiz. Tension [kg] 722.98 694.887 668.517 643.871 620.373 598.023 577.398 557.92 539.593 522.414 506.384
Span vertical proj. [m] 1.94 Wave time 5 [seg] 7.84 8 8.15 8.31 8.46 8.62 8.77 8.93 9.08 9.22 9.37
Between structures 179 - 180 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 162 Middle span sag [m] 1.48 1.54 1.6 1.66 1.72 1.79 1.85 1.92 1.98 2.05 2.11
Span length [m] 139.93 Horiz. Tension [kg] 722.98 694.887 668.517 643.871 620.373 598.023 577.398 557.92 539.593 522.414 506.384
Span vertical proj. [m] 1.41 Wave time 5 [seg] 10.98 11.2 11.41 11.63 11.85 12.07 12.28 12.5 12.71 12.91 13.12
Between structures 180 - 181 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 162 Middle span sag [m] 2.36 2.46 2.56 2.66 2.76 2.86 2.96 3.06 3.17 3.27 3.38
Span length [m] 176.95 Horiz. Tension [kg] 722.98 694.887 668.517 643.871 620.373 598.023 577.398 557.92 539.593 522.414 506.384
Span vertical proj. [m] -5.93 Wave time 5 [seg] 13.88 14.16 14.44 14.71 14.99 15.27 15.54 15.81 16.07 16.34 16.59
Between structures 181 - 182 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 48 of 108

Ruling span [m] 162 Middle span sag [m] 2.26 2.35 2.45 2.54 2.64 2.73 2.83 2.93 3.03 3.13 3.23
Span length [m] 172.92 Horiz. Tension [kg] 722.98 694.887 668.517 643.871 620.373 598.023 577.398 557.92 539.593 522.414 506.384
Span vertical proj. [m] 10.55 Wave time 5 [seg] 13.58 13.85 14.12 14.39 14.66 14.93 15.19 15.46 15.72 15.97 16.22

SECTION #36 OPGW AT INITIAL CONDITION


Between structures 182 - 183 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 191.21 Middle span sag [m] 4.12 4.25 4.39 4.53 4.67 4.81 4.95 5.08 5.22 5.36 5.5
Span length [m] 228.77 Horiz. Tension [kg] 694.059 671.708 650.506 631.027 612.122 594.367 577.76 562.015 547.133 533.112 519.953
Span vertical proj. [m] 1.69 Wave time 5 [seg] 18.32 18.62 18.92 19.21 19.51 19.8 20.08 20.36 20.63 20.9 21.17
Between structures 183 - 184 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 191.21 Middle span sag [m] 2.41 2.49 2.57 2.65 2.73 2.81 2.89 2.97 3.05 3.13 3.21
Span length [m] 174.91 Horiz. Tension [kg] 694.059 671.708 650.506 631.027 612.122 594.367 577.76 562.015 547.133 533.112 519.953
Span vertical proj. [m] -0.24 Wave time 5 [seg] 14 14.23 14.47 14.69 14.91 15.13 15.35 15.56 15.77 15.98 16.18
Between structures 184 - 185 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 191.21 Middle span sag [m] 2.02 2.08 2.15 2.22 2.29 2.36 2.42 2.49 2.56 2.63 2.69
Span length [m] 159.96 Horiz. Tension [kg] 694.059 671.708 650.506 631.027 612.122 594.367 577.76 562.015 547.133 533.112 519.953
Span vertical proj. [m] 12.13 Wave time 5 [seg] 12.82 13.04 13.25 13.45 13.66 13.86 14.06 14.25 14.44 14.63 14.82
Between structures 185 - 186 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 191.21 Middle span sag [m] 2.55 2.64 2.72 2.81 2.89 2.98 3.06 3.15 3.24 3.32 3.41
Span length [m] 179.92 Horiz. Tension [kg] 694.059 671.708 650.506 631.027 612.122 594.367 577.76 562.015 547.133 533.112 519.953
Span vertical proj. [m] 11.75 Wave time 5 [seg] 14.42 14.66 14.9 15.12 15.36 15.58 15.81 16.03 16.24 16.46 16.66
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 49 of 108

SECTION #37 OPGW AT INITIAL CONDITION


Between structures 186 - 186-A Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 148.29 Middle span sag [m] 1.94 2.02 2.1 2.18 2.26 2.34 2.42 2.5 2.59 2.67 2.75
Span length [m] 148.37 Horiz. Tension [kg] 620.726 596.081 573.733 552.533 532.483 513.582 496.405 480.089 464.922 450.904 437.461
Span vertical proj. [m] 4.91 Wave time 5 [seg] 12.56 12.82 13.07 13.32 13.57 13.81 14.05 14.29 14.52 14.74 14.97

SECTION #38 OPGW AT INITIAL CONDITION


186-A -
Between structures Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
NE187
Ruling span [m] 208.44 Middle span sag [m] 0.21 0.21 0.21 0.22 0.22 0.23 0.23 0.23 0.24 0.24 0.24
Span length [m] 42.64 Horiz. Tension [kg] 481.905 472.624 463.917 455.642 447.511 439.954 432.541 425.56 418.865 412.459 406.196
Span vertical proj.
0.02 Wave time 5 [seg] 4.1 4.14 4.17 4.21 4.25 4.29 4.32 4.36 4.39 4.43 4.46
[m]
Between structures NE187 - 189 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 208.44 Middle span sag [m] 5.81 5.93 6.04 6.15 6.26 6.37 6.48 6.58 6.69 6.79 6.9
Span length [m] 226.47 Horiz. Tension [kg] 481.905 472.624 463.917 455.642 447.511 439.954 432.541 425.56 418.865 412.459 406.196
Span vertical proj.
-2.32 Wave time 5 [seg] 21.77 21.98 22.19 22.39 22.59 22.78 22.98 23.17 23.35 23.53 23.71
[m]

SECTION #39 OPGW AT INITIAL CONDITION


Between structures 189 - 190 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 152.7 Middle span sag [m] 2.95 3.05 3.16 3.26 3.36 3.46 3.57 3.67 3.77 3.87 3.96
Span length [m] 169.93 Horiz. Tension [kg] 535.025 516.698 499.808 484.066 469.187 455.456 442.3 430.293 418.86 408.003 398.007
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 50 of 108

Span vertical proj. [m] -6.08 Wave time 5 [seg] 15.5 15.77 16.04 16.3 16.55 16.8 17.05 17.29 17.52 17.75 17.98
Between structures 190 - 191 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 152.7 Middle span sag [m] 2.15 2.22 2.3 2.37 2.45 2.52 2.6 2.67 2.74 2.81 2.88
Span length [m] 144.95 Horiz. Tension [kg] 535.025 516.698 499.808 484.066 469.187 455.456 442.3 430.293 418.86 408.003 398.007
Span vertical proj. [m] -6.59 Wave time 5 [seg] 13.22 13.46 13.68 13.9 14.12 14.33 14.55 14.75 14.95 15.15 15.33
Between structures 191 - 192 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 152.7 Middle span sag [m] 2.14 2.22 2.29 2.37 2.44 2.52 2.59 2.67 2.74 2.81 2.88
Span length [m] 144.96 Horiz. Tension [kg] 535.025 516.698 499.808 484.066 469.187 455.456 442.3 430.293 418.86 408.003 398.007
Span vertical proj. [m] -1.75 Wave time 5 [seg] 13.22 13.45 13.68 13.9 14.12 14.33 14.54 14.74 14.94 15.14 15.33
Between structures 192 - 200 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 152.7 Middle span sag [m] 2.2 2.27 2.35 2.43 2.5 2.58 2.66 2.73 2.81 2.88 2.95
Span length [m] 146.71 Horiz. Tension [kg] 535.025 516.698 499.808 484.066 469.187 455.456 442.3 430.293 418.86 408.003 398.007
Span vertical proj. [m] 0.52 Wave time 5 [seg] 13.38 13.61 13.84 14.06 14.29 14.5 14.71 14.92 15.12 15.32 15.51

SECTION #40 OPGW AT INITIAL CONDITION


Between structures 200 - 201 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 114.96 Middle span sag [m] 1.49 1.55 1.62 1.69 1.76 1.83 1.9 1.97 2.03 2.1 2.17
Span length [m] 115.05 Horiz. Tension [kg] 486.387 465.191 445.143 427.106 410.219 394.768 380.752 367.599 355.309 344.167 333.599
Span vertical proj. [m] -4.3 Wave time 5 [seg] 11.01 11.25 11.51 11.75 11.99 12.22 12.44 12.66 12.88 13.09 13.29
Between structures 201 - 202 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 114.96 Middle span sag [m] 1.48 1.55 1.62 1.69 1.76 1.83 1.9 1.96 2.03 2.1 2.16
Span length [m] 114.99 Horiz. Tension [kg] 486.387 465.191 445.143 427.106 410.219 394.768 380.752 367.599 355.309 344.167 333.599
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 51 of 108

Span vertical proj. [m] -3.08 Wave time 5 [seg] 11 11.25 11.5 11.74 11.98 12.21 12.43 12.65 12.87 13.08 13.28

SECTION #41 OPGW AT INITIAL CONDITION


Between structures 202 - 203 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 117.95 Middle span sag [m] 1.3 1.36 1.43 1.49 1.56 1.63 1.69 1.76 1.83 1.89 1.96
Span length [m] 115.03 Horiz. Tension [kg] 555.93 530.137 506.068 484.298 463.675 444.202 427.027 410.714 395.837 381.821 369.243
Span vertical proj. [m] 2.94 Wave time 5 [seg] 10.29 10.54 10.79 11.03 11.27 11.51 11.74 11.97 12.2 12.42 12.63
Between structures 203 - 204 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 117.95 Middle span sag [m] 1.3 1.36 1.43 1.49 1.56 1.63 1.69 1.76 1.82 1.89 1.96
Span length [m] 114.98 Horiz. Tension [kg] 555.93 530.137 506.068 484.298 463.675 444.202 427.027 410.714 395.837 381.821 369.243
Span vertical proj. [m] 4.76 Wave time 5 [seg] 10.29 10.54 10.78 11.02 11.27 11.51 11.74 11.97 12.2 12.42 12.63
Between structures 204 - 205 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 117.95 Middle span sag [m] 1.25 1.31 1.37 1.43 1.49 1.56 1.62 1.69 1.75 1.82 1.88
Span length [m] 112.67 Horiz. Tension [kg] 555.93 530.137 506.068 484.298 463.675 444.202 427.027 410.714 395.837 381.821 369.243
Span vertical proj. [m] 3.27 Wave time 5 [seg] 10.08 10.32 10.57 10.8 11.04 11.28 11.5 11.73 11.95 12.16 12.37
Between structures 205 - 206 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 117.95 Middle span sag [m] 1.6 1.68 1.76 1.84 1.92 2.01 2.09 2.17 2.25 2.33 2.41
Span length [m] 127.69 Horiz. Tension [kg] 555.93 530.137 506.068 484.298 463.675 444.202 427.027 410.714 395.837 381.821 369.243
Span vertical proj. [m] 6.41 Wave time 5 [seg] 11.43 11.7 11.98 12.25 12.52 12.79 13.04 13.3 13.55 13.79 14.03
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 52 of 108

SECTION #42 OPGW AT INITIAL CONDITION


Between structures 206 - 207 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.99 Middle span sag [m] 1.9 1.96 2.02 2.08 2.15 2.21 2.27 2.32 2.38 2.44 2.5
Span length [m] 127.63 Horiz. Tension [kg] 468.949 454.07 440.053 426.897 414.603 403.172 392.602 382.608 373.044 364.055 355.784
Span vertical proj. [m] 2.93 Wave time 5 [seg] 12.43 12.64 12.84 13.03 13.22 13.41 13.59 13.77 13.94 14.11 14.28
Between structures 207 - 208 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.99 Middle span sag [m] 2.62 2.71 2.79 2.88 2.97 3.05 3.13 3.21 3.3 3.38 3.46
Span length [m] 149.99 Horiz. Tension [kg] 468.949 454.07 440.053 426.897 414.603 403.172 392.602 382.608 373.044 364.055 355.784
Span vertical proj. [m] 6.6 Wave time 5 [seg] 14.62 14.86 15.09 15.32 15.55 15.77 15.98 16.18 16.39 16.59 16.78
Between structures 208 - 209 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.99 Middle span sag [m] 2.46 2.54 2.62 2.7 2.78 2.86 2.94 3.01 3.09 3.17 3.24
Span length [m] 145.27 Horiz. Tension [kg] 468.949 454.07 440.053 426.897 414.603 403.172 392.602 382.608 373.044 364.055 355.784
Span vertical proj. [m] 5.98 Wave time 5 [seg] 14.16 14.39 14.61 14.84 15.06 15.27 15.47 15.67 15.87 16.07 16.25
Between structures 209 - 210 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.99 Middle span sag [m] 2.62 2.71 2.8 2.88 2.97 3.05 3.14 3.22 3.3 3.38 3.46
Span length [m] 150.07 Horiz. Tension [kg] 468.949 454.07 440.053 426.897 414.603 403.172 392.602 382.608 373.044 364.055 355.784
Span vertical proj. [m] 7.39 Wave time 5 [seg] 14.63 14.86 15.1 15.33 15.56 15.78 15.99 16.19 16.4 16.6 16.79

SECTION #43 OPGW AT INITIAL CONDITION


Between structures 210 - 211 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.48 Middle span sag [m] 1.5 1.56 1.64 1.71 1.78 1.85 1.93 2 2.07 2.15 2.22
Span length [m] 126.96 Horiz. Tension [kg] 588.646 562.853 538.209 515.863 494.666 475.192 456.866 440.265 424.812 410.222 396.781
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 53 of 108

Span vertical proj. [m] 6.6 Wave time 5 [seg] 11.04 11.29 11.55 11.8 12.05 12.29 12.54 12.77 13 13.23 13.45
Between structures 211 - 212 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.48 Middle span sag [m] 1.5 1.57 1.64 1.71 1.78 1.85 1.93 2 2.07 2.15 2.22
Span length [m] 126.99 Horiz. Tension [kg] 588.646 562.853 538.209 515.863 494.666 475.192 456.866 440.265 424.812 410.222 396.781
Span vertical proj. [m] 5.84 Wave time 5 [seg] 11.05 11.3 11.55 11.8 12.05 12.29 12.54 12.77 13 13.23 13.46
Between structures 212 - 213 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.48 Middle span sag [m] 1.5 1.57 1.64 1.71 1.78 1.86 1.93 2 2.08 2.15 2.22
Span length [m] 127 Horiz. Tension [kg] 588.646 562.853 538.209 515.863 494.666 475.192 456.866 440.265 424.812 410.222 396.781
Span vertical proj. [m] 7.29 Wave time 5 [seg] 11.05 11.3 11.56 11.8 12.05 12.3 12.54 12.78 13.01 13.24 13.46
Between structures 213 - 214 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.48 Middle span sag [m] 1.5 1.57 1.64 1.71 1.78 1.86 1.93 2 2.08 2.15 2.22
Span length [m] 126.99 Horiz. Tension [kg] 588.646 562.853 538.209 515.863 494.666 475.192 456.866 440.265 424.812 410.222 396.781
Span vertical proj. [m] 7.95 Wave time 5 [seg] 11.05 11.3 11.56 11.8 12.05 12.3 12.54 12.78 13.01 13.24 13.46
Between structures 214 - 215 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.48 Middle span sag [m] 1.4 1.47 1.54 1.6 1.67 1.74 1.81 1.88 1.95 2.02 2.08
Span length [m] 122.85 Horiz. Tension [kg] 588.646 562.853 538.209 515.863 494.666 475.192 456.866 440.265 424.812 410.222 396.781
Span vertical proj. [m] 10.84 Wave time 5 [seg] 10.7 10.94 11.19 11.43 11.67 11.91 12.15 12.37 12.6 12.82 13.03
Between structures 215 - 216 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.48 Middle span sag [m] 1.68 1.75 1.84 1.91 2 2.08 2.16 2.24 2.33 2.41 2.49
Span length [m] 134.51 Horiz. Tension [kg] 588.646 562.853 538.209 515.863 494.666 475.192 456.866 440.265 424.812 410.222 396.781
Span vertical proj. [m] 3.5 Wave time 5 [seg] 11.69 11.96 12.23 12.49 12.76 13.02 13.28 13.52 13.77 14.01 14.25
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 54 of 108

SECTION #44 OPGW AT INITIAL CONDITION


Between structures 216 - 217 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 134.53 Middle span sag [m] 2.46 2.55 2.64 2.73 2.82 2.91 3 3.08 3.17 3.26 3.34
Span length [m] 146.01 Horiz. Tension [kg] 474.192 457.014 441.562 426.97 413.529 400.949 389.23 378.374 368.093 358.386 349.398
Span vertical proj. [m] 10.73 Wave time 5 [seg] 14.16 14.43 14.68 14.93 15.17 15.4 15.63 15.86 16.08 16.29 16.5
Between structures 217 - 218 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 134.53 Middle span sag [m] 2.48 2.57 2.66 2.75 2.84 2.93 3.02 3.11 3.19 3.28 3.37
Span length [m] 146.55 Horiz. Tension [kg] 474.192 457.014 441.562 426.97 413.529 400.949 389.23 378.374 368.093 358.386 349.398
Span vertical proj. [m] 11.11 Wave time 5 [seg] 14.22 14.48 14.73 14.98 15.22 15.46 15.69 15.92 16.14 16.35 16.56
Between structures 218 - 219 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 134.53 Middle span sag [m] 0.8 0.83 0.86 0.88 0.91 0.94 0.97 1 1.03 1.05 1.08
Span length [m] 83.13 Horiz. Tension [kg] 474.192 457.014 441.562 426.97 413.529 400.949 389.23 378.374 368.093 358.386 349.398
Span vertical proj. [m] 4.13 Wave time 5 [seg] 8.06 8.21 8.35 8.49 8.63 8.76 8.89 9.02 9.14 9.27 9.39

SECTION #45 OPGW AT INITIAL CONDITION


Between structures 219 - 220 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.73 Middle span sag [m] 1.99 2.06 2.13 2.19 2.26 2.32 2.38 2.45 2.51 2.57 2.63
Span length [m] 130.77 Horiz. Tension [kg] 469.239 454.071 440.055 426.899 414.606 403.174 392.604 382.322 372.902 364.057 355.498
Span vertical proj. [m] 9.56 Wave time 5 [seg] 12.75 12.96 13.17 13.37 13.57 13.76 13.94 14.13 14.3 14.48 14.65
Between structures 220 - 221 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.73 Middle span sag [m] 1.99 2.06 2.12 2.19 2.25 2.32 2.38 2.44 2.5 2.56 2.63
Span length [m] 130.73 Horiz. Tension [kg] 469.239 454.071 440.055 426.899 414.606 403.174 392.604 382.322 372.902 364.057 355.498
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 55 of 108

Span vertical proj. [m] 5.16 Wave time 5 [seg] 12.73 12.95 13.15 13.35 13.55 13.74 13.92 14.11 14.29 14.46 14.63
Between structures 221 - 222 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.73 Middle span sag [m] 1.99 2.06 2.12 2.19 2.26 2.32 2.38 2.45 2.51 2.57 2.63
Span length [m] 130.78 Horiz. Tension [kg] 469.239 454.071 440.055 426.899 414.606 403.174 392.604 382.322 372.902 364.057 355.498
Span vertical proj. [m] 7.48 Wave time 5 [seg] 12.74 12.96 13.16 13.36 13.56 13.75 13.93 14.12 14.3 14.47 14.64
Between structures 222 - 223 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.73 Middle span sag [m] 2.9 3 3.1 3.19 3.29 3.38 3.47 3.56 3.65 3.74 3.83
Span length [m] 157.72 Horiz. Tension [kg] 469.239 454.071 440.055 426.899 414.606 403.174 392.604 382.322 372.902 364.057 355.498
Span vertical proj. [m] 12.29 Wave time 5 [seg] 15.38 15.64 15.88 16.13 16.37 16.6 16.82 17.04 17.26 17.47 17.68
Between structures 223 - 224 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.73 Middle span sag [m] 2.9 2.99 3.09 3.18 3.28 3.37 3.46 3.56 3.65 3.73 3.82
Span length [m] 157.76 Horiz. Tension [kg] 469.239 454.071 440.055 426.899 414.606 403.174 392.604 382.322 372.902 364.057 355.498
Span vertical proj. [m] 3.92 Wave time 5 [seg] 15.36 15.62 15.87 16.11 16.35 16.58 16.8 17.02 17.24 17.45 17.66
Between structures 224 - 225 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.73 Middle span sag [m] 2.52 2.61 2.69 2.77 2.85 2.93 3.01 3.09 3.17 3.25 3.33
Span length [m] 146.94 Horiz. Tension [kg] 469.239 454.071 440.055 426.899 414.606 403.174 392.604 382.322 372.902 364.057 355.498
Span vertical proj. [m] 12.7 Wave time 5 [seg] 14.33 14.57 14.8 15.03 15.25 15.47 15.67 15.88 16.08 16.28 16.47

SECTION #46 OPGW AT INITIAL CONDITION


Between structures 225 - 226 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 120.74 Middle span sag [m] 2.48 2.59 2.69 2.8 2.91 3.01 3.12 3.22 3.33 3.43 3.53
Span length [m] 147.94 Horiz. Tension [kg] 482.329 462.281 443.956 427.068 411.329 397.027 383.299 371.007 359.291 348.723 338.73
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 56 of 108

Span vertical proj. [m] 7.09 Wave time 5 [seg] 14.22 14.52 14.82 15.11 15.4 15.67 15.95 16.21 16.47 16.72 16.97
Between structures 226 - 227 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 120.74 Middle span sag [m] 1.02 1.06 1.11 1.15 1.19 1.24 1.28 1.32 1.37 1.41 1.45
Span length [m] 94.76 Horiz. Tension [kg] 482.329 462.281 443.956 427.068 411.329 397.027 383.299 371.007 359.291 348.723 338.73
Span vertical proj. [m] 7.02 Wave time 5 [seg] 9.11 9.31 9.5 9.68 9.87 10.04 10.22 10.39 10.56 10.72 10.87
Between structures 227 - 228 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 120.74 Middle span sag [m] 1.02 1.06 1.11 1.15 1.2 1.24 1.28 1.33 1.37 1.41 1.45
Span length [m] 94.81 Horiz. Tension [kg] 482.329 462.281 443.956 427.068 411.329 397.027 383.299 371.007 359.291 348.723 338.73
Span vertical proj. [m] 8.17 Wave time 5 [seg] 9.12 9.32 9.51 9.69 9.88 10.05 10.23 10.4 10.57 10.73 10.89

SECTION #47 OPGW AT INITIAL CONDITION


Between structures 228 - 229 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 122.89 Middle span sag [m] 1.3 1.37 1.44 1.51 1.59 1.66 1.74 1.83 1.91 1.99 2.08
Span length [m] 133.92 Horiz. Tension [kg] 751.899 715.768 681.36 648.675 617.713 589.048 562.107 536.889 513.393 491.622 471.574
Span vertical proj. [m] 8.26 Wave time 5 [seg] 10.31 10.57 10.83 11.1 11.38 11.65 11.93 12.2 12.48 12.75 13.02
Between structures 229 - 230 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 122.89 Middle span sag [m] 1.5 1.58 1.66 1.74 1.83 1.92 2.01 2.1 2.2 2.3 2.39
Span length [m] 143.65 Horiz. Tension [kg] 751.899 715.768 681.36 648.675 617.713 589.048 562.107 536.889 513.393 491.622 471.574
Span vertical proj. [m] 8.49 Wave time 5 [seg] 11.06 11.33 11.62 11.91 12.2 12.49 12.79 13.09 13.38 13.68 13.97
Between structures 230 - 231 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 122.89 Middle span sag [m] 0.61 0.65 0.68 0.71 0.75 0.78 0.82 0.86 0.9 0.94 0.98
Span length [m] 91.94 Horiz. Tension [kg] 751.899 715.768 681.36 648.675 617.713 589.048 562.107 536.889 513.393 491.622 471.574
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 57 of 108

Span vertical proj. [m] 4.18 Wave time 5 [seg] 7.08 7.25 7.43 7.62 7.81 7.99 8.18 8.37 8.56 8.75 8.93
Between structures 231 - 232 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 122.89 Middle span sag [m] 0.73 0.77 0.81 0.85 0.89 0.93 0.98 1.02 1.07 1.12 1.17
Span length [m] 100.27 Horiz. Tension [kg] 751.899 715.768 681.36 648.675 617.713 589.048 562.107 536.889 513.393 491.622 471.574
Span vertical proj. [m] 7.3 Wave time 5 [seg] 7.72 7.91 8.11 8.31 8.52 8.73 8.93 9.14 9.35 9.55 9.75
Between structures 232 - 233 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 122.89 Middle span sag [m] 1.08 1.14 1.2 1.26 1.32 1.38 1.45 1.52 1.59 1.66 1.73
Span length [m] 122.08 Horiz. Tension [kg] 751.899 715.768 681.36 648.675 617.713 589.048 562.107 536.889 513.393 491.622 471.574
Span vertical proj. [m] 7.16 Wave time 5 [seg] 9.4 9.63 9.87 10.12 10.37 10.62 10.87 11.12 11.37 11.62 11.87

SECTION #48 OPGW AT INITIAL CONDITION


Between structures 233 - 234 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 121.13 Middle span sag [m] 1.67 1.75 1.82 1.89 1.96 2.03 2.1 2.17 2.25 2.31 2.38
Span length [m] 121.46 Horiz. Tension [kg] 482.327 462.278 443.954 427.354 411.327 397.024 383.583 371.292 359.575 349.007 339.014
Span vertical proj. [m] 8.95 Wave time 5 [seg] 11.68 11.93 12.17 12.41 12.65 12.87 13.1 13.31 13.53 13.73 13.93

SECTION #49 OPGW AT INITIAL CONDITION


Between structures 234 - 235 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.11 Middle span sag [m] 1.19 1.25 1.31 1.37 1.44 1.51 1.58 1.65 1.72 1.8 1.87
Span length [m] 128.66 Horiz. Tension [kg] 762.223 726.092 692.257 660.146 629.758 601.093 574.726 549.508 526.012 504.24 484.192
Span vertical proj. [m] 11.97 Wave time 5 [seg] 9.85 10.09 10.34 10.58 10.84 11.09 11.34 11.6 11.86 12.11 12.36
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 58 of 108

SECTION #50 OPGW AT INITIAL CONDITION


Between structures 235 - 236 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 113.97 Middle span sag [m] 1.36 1.43 1.5 1.57 1.64 1.71 1.77 1.84 1.91 1.98 2.05
Span length [m] 114.26 Horiz. Tension [kg] 523.758 499.116 476.771 455.574 436.676 418.927 402.614 387.45 373.722 360.856 349.141
Span vertical proj. [m] 8.21 Wave time 5 [seg] 10.54 10.8 11.05 11.31 11.55 11.79 12.03 12.26 12.48 12.7 12.92

7 STRINGING CHART FINAL CONDITION

SECTION #1 OPGW AT FINAL CONDITION


Between structures 1-2 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.45 Middle span sag [m] 2.26 2.34 2.42 2.5 2.58 2.66 2.73 2.81 2.88 2.96 3.03
Span length [m] 141.45 Horiz. Tension [kg] 482.195 465.88 450.714 436.409 423.254 410.96 399.529 388.673 378.678 369.114 360.125
Span vertical proj. [m] 1.19 Wave time 5 [seg] 13.59 13.82 14.05 14.28 14.5 14.72 14.93 15.14 15.33 15.53 15.72

SECTION #2 OPGW AT FINAL CONDITION


Between structures 2-3 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 119.93 Middle span sag [m] 1.97 2.05 2.13 2.21 2.29 2.37 2.44 2.52 2.6 2.67 2.74
Span length [m] 126.99 Horiz. Tension [kg] 447.26 429.511 413.484 398.894 385.166 372.3 360.583 349.728 339.448 330.03 321.187
Span vertical proj. [m] 4.47 Wave time 5 [seg] 12.67 12.93 13.18 13.42 13.65 13.89 14.11 14.33 14.54 14.75 14.95
Between structures 3-4 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 59 of 108

Ruling span [m] 119.93 Middle span sag [m] 1.97 2.05 2.13 2.21 2.28 2.36 2.44 2.52 2.59 2.67 2.74
Span length [m] 126.91 Horiz. Tension [kg] 447.26 429.511 413.484 398.894 385.166 372.3 360.583 349.728 339.448 330.03 321.187
Span vertical proj. [m] 4.51 Wave time 5 [seg] 12.66 12.92 13.17 13.41 13.64 13.88 14.1 14.32 14.54 14.74 14.94
Between structures 4-5 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 119.93 Middle span sag [m] 1.97 2.05 2.13 2.21 2.29 2.37 2.44 2.52 2.6 2.67 2.74
Span length [m] 127.01 Horiz. Tension [kg] 447.26 429.511 413.484 398.894 385.166 372.3 360.583 349.728 339.448 330.03 321.187
Span vertical proj. [m] 5.28 Wave time 5 [seg] 12.67 12.93 13.18 13.42 13.66 13.89 14.12 14.33 14.55 14.76 14.96
Between structures 5-6 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 119.93 Middle span sag [m] 0.47 0.49 0.51 0.53 0.55 0.56 0.58 0.6 0.62 0.64 0.65
Span length [m] 62.02 Horiz. Tension [kg] 447.26 429.511 413.484 398.894 385.166 372.3 360.583 349.728 339.448 330.03 321.187
Span vertical proj. [m] 2.31 Wave time 5 [seg] 6.19 6.31 6.44 6.55 6.67 6.78 6.89 7 7.1 7.2 7.3

SECTION #3 OPGW AT FINAL CONDITION


Between structures 6-7 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.94 Middle span sag [m] 2.13 2.21 2.28 2.36 2.44 2.51 2.59 2.66 2.73 2.81 2.88
Span length [m] 131.26 Horiz. Tension [kg] 442.032 426.58 412.276 398.547 386.256 374.538 363.682 353.689 344.27 335.425 327.156
Span vertical proj. [m] 5.59 Wave time 5 [seg] 13.17 13.41 13.64 13.88 14.09 14.31 14.53 14.73 14.93 15.13 15.32
Between structures 7-8 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.94 Middle span sag [m] 1.93 2 2.07 2.14 2.2 2.27 2.34 2.41 2.47 2.54 2.6
Span length [m] 124.76 Horiz. Tension [kg] 442.032 426.58 412.276 398.547 386.256 374.538 363.682 353.689 344.27 335.425 327.156
Span vertical proj. [m] 8.16 Wave time 5 [seg] 12.53 12.75 12.97 13.2 13.4 13.61 13.81 14.01 14.2 14.39 14.57
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 60 of 108

SECTION #4 OPGW AT FINAL CONDITION


Between structures 8-9 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.67 Middle span sag [m] 2.57 2.67 2.78 2.89 2.99 3.1 3.21 3.32 3.43 3.54 3.65
Span length [m] 168.37 Horiz. Tension [kg] 602.925 579.428 557.081 535.882 516.981 498.654 481.477 466.023 451.144 437.414 424.545
Span vertical proj. [m] -2.41 Wave time 5 [seg] 14.46 14.75 15.05 15.34 15.62 15.91 16.19 16.45 16.72 16.98 17.24
Between structures 9 - 10 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.67 Middle span sag [m] 1.45 1.51 1.57 1.63 1.69 1.75 1.81 1.87 1.94 2 2.06
Span length [m] 126.52 Horiz. Tension [kg] 602.925 579.428 557.081 535.882 516.981 498.654 481.477 466.023 451.144 437.414 424.545
Span vertical proj. [m] 1.13 Wave time 5 [seg] 10.87 11.09 11.31 11.53 11.74 11.95 12.16 12.36 12.56 12.76 12.95
Between structures 10 - 11 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.67 Middle span sag [m] 1.45 1.51 1.57 1.63 1.69 1.75 1.81 1.87 1.93 1.99 2.06
Span length [m] 126.43 Horiz. Tension [kg] 602.925 579.428 557.081 535.882 516.981 498.654 481.477 466.023 451.144 437.414 424.545
Span vertical proj. [m] 1.5 Wave time 5 [seg] 10.86 11.08 11.3 11.52 11.73 11.94 12.15 12.35 12.56 12.75 12.94

SECTION #5 OPGW AT FINAL CONDITION


Between structures 11 - 12 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.98 3.05 3.13
Span length [m] 145.22 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -0.03 Wave time 5 [seg] 13.82 14.06 14.29 14.51 14.74 14.95 15.16 15.37 15.57 15.77 15.96
Between structures 12 - 13 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.97 3.05 3.12
Span length [m] 145.2 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 61 of 108

Span vertical proj. [m] -0.78 Wave time 5 [seg] 13.82 14.06 14.29 14.51 14.73 14.95 15.16 15.37 15.57 15.77 15.96
Between structures 13 - 14 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.98 3.05 3.13
Span length [m] 145.22 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -1.49 Wave time 5 [seg] 13.82 14.06 14.29 14.51 14.74 14.95 15.16 15.37 15.57 15.77 15.96
Between structures 14 - 15 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.97 3.05 3.12
Span length [m] 145.17 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -0.11 Wave time 5 [seg] 13.82 14.05 14.28 14.51 14.73 14.94 15.16 15.36 15.57 15.77 15.95
Between structures 15 - 16 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.51 2.58 2.66 2.74 2.82 2.9 2.98 3.05 3.13
Span length [m] 145.23 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -2.23 Wave time 5 [seg] 13.82 14.06 14.29 14.51 14.74 14.95 15.16 15.37 15.57 15.77 15.96
Between structures 16 - 17 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.97 3.05 3.12
Span length [m] 145.18 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -1.35 Wave time 5 [seg] 13.82 14.05 14.28 14.51 14.73 14.95 15.16 15.37 15.57 15.77 15.96
Between structures 17 - 18 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.97 3.05 3.12
Span length [m] 145.2 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -0.5 Wave time 5 [seg] 13.82 14.06 14.29 14.51 14.73 14.95 15.16 15.37 15.57 15.77 15.96
Between structures 18 - 19 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.97 3.05 3.12
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 62 of 108

Span length [m] 145.22 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -0.54 Wave time 5 [seg] 13.82 14.06 14.29 14.51 14.74 14.95 15.16 15.37 15.57 15.77 15.96
Between structures 19 - 20 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.37 2.45 2.54 2.62 2.7 2.78 2.86 2.93 3.01 3.09 3.16
Span length [m] 146.11 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] -0.15 Wave time 5 [seg] 13.91 14.14 14.38 14.6 14.83 15.04 15.26 15.46 15.67 15.87 16.06
Between structures 20 - 21 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.29 Middle span sag [m] 2.34 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.97 3.05 3.12
Span length [m] 145.18 Horiz. Tension [kg] 491.083 474.767 459.6 445.583 432.14 419.847 408.127 397.271 386.989 377.28 368.435
Span vertical proj. [m] 0.44 Wave time 5 [seg] 13.82 14.05 14.28 14.51 14.73 14.95 15.16 15.37 15.57 15.77 15.96

SECTION #6 OPGW AT FINAL CONDITION


Between structures 21 - 22 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 78.35 Middle span sag [m] 0.69 0.73 0.78 0.83 0.88 0.94 0.99 1.04 1.1 1.15 1.2
Span length [m] 77.99 Horiz. Tension [kg] 483.112 452.153 424.067 398.278 375.362 354.168 335.273 318.389 302.941 289.217 276.642
Span vertical proj. [m] 0.06 Wave time 5 [seg] 7.48 7.74 7.99 8.24 8.49 8.74 8.98 9.22 9.45 9.67 9.89
Between structures 22 - 23 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 78.35 Middle span sag [m] 0.7 0.75 0.8 0.85 0.9 0.95 1.01 1.06 1.12 1.17 1.22
Span length [m] 78.7 Horiz. Tension [kg] 483.112 452.153 424.067 398.278 375.362 354.168 335.273 318.389 302.941 289.217 276.642
Span vertical proj. [m] 0.38 Wave time 5 [seg] 7.55 7.81 8.06 8.32 8.57 8.82 9.07 9.3 9.54 9.76 9.98
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 63 of 108

SECTION #7 OPGW AT FINAL CONDITION


Between structures 23 - 24 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.59 Middle span sag [m] 2.07 2.15 2.23 2.3 2.38 2.45 2.53 2.6 2.68 2.75 2.82
Span length [m] 129.72 Horiz. Tension [kg] 443.192 427.164 412.286 398.845 385.979 374.261 363.406 353.124 343.419 334.575 326.017
Span vertical proj. [m] -0.28 Wave time 5 [seg] 13 13.24 13.48 13.7 13.93 14.14 14.35 14.56 14.77 14.96 15.16
Between structures 24 - 25 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.59 Middle span sag [m] 1.87 1.94 2.01 2.08 2.15 2.21 2.28 2.35 2.41 2.48 2.54
Span length [m] 123.21 Horiz. Tension [kg] 443.192 427.164 412.286 398.845 385.979 374.261 363.406 353.124 343.419 334.575 326.017
Span vertical proj. [m] 0.27 Wave time 5 [seg] 12.34 12.57 12.8 13.01 13.23 13.43 13.63 13.83 14.02 14.21 14.39
SECTION #8 OPGW AT FINAL CONDITION
Between structures 25 - 26 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 135.63 Middle span sag [m] 2.42 2.52 2.62 2.72 2.83 2.93 3.03 3.13 3.23 3.33 3.43
Span length [m] 155.45 Horiz. Tension [kg] 544.334 522.562 502.513 484.188 466.435 450.408 435.53 421.513 408.646 396.64 385.21
Span vertical proj. [m] 1.66 Wave time 5 [seg] 14.05 14.34 14.63 14.9 15.18 15.45 15.71 15.97 16.22 16.47 16.71
Between structures 26 - 27 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 135.63 Middle span sag [m] 0.9 0.94 0.98 1.01 1.05 1.09 1.13 1.16 1.2 1.24 1.27
Span length [m] 94.74 Horiz. Tension [kg] 544.334 522.562 502.513 484.188 466.435 450.408 435.53 421.513 408.646 396.64 385.21
Span vertical proj. [m] 5.37 Wave time 5 [seg] 8.57 8.75 8.92 9.09 9.26 9.42 9.58 9.74 9.89 10.04 10.19
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 64 of 108

SECTION #9 OPGW AT FINAL CONDITION


Between structures 27 - 28 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 0.89 0.94 0.98 1.02 1.07 1.11 1.16 1.2 1.25 1.29 1.34
Span length [m] 100.54 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] -0.31 Wave time 5 [seg] 8.53 8.73 8.93 9.13 9.33 9.52 9.72 9.9 10.09 10.27 10.45
Between structures 28 - 29 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 1.73 1.81 1.9 1.98 2.07 2.16 2.25 2.33 2.42 2.51 2.6
Span length [m] 139.97 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] -5.67 Wave time 5 [seg] 11.89 12.16 12.44 12.72 12.99 13.26 13.53 13.79 14.05 14.31 14.56
Between structures 29 - 30 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 1 1.05 1.1 1.15 1.2 1.25 1.3 1.35 1.4 1.45 1.5
Span length [m] 106.5 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] 0.18 Wave time 5 [seg] 9.04 9.25 9.46 9.67 9.88 10.09 10.29 10.49 10.69 10.88 11.07
Between structures 30 - 31 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 1.25 1.31 1.37 1.43 1.49 1.55 1.62 1.68 1.74 1.81 1.87
Span length [m] 118.8 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] 2.06 Wave time 5 [seg] 10.08 10.32 10.55 10.79 11.02 11.25 11.48 11.7 11.92 12.14 12.35
Between structures 31 - 32 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 1.64 1.71 1.79 1.87 1.95 2.04 2.12 2.2 2.29 2.37 2.45
Span length [m] 135.99 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] 6.48 Wave time 5 [seg] 11.55 11.82 12.08 12.36 12.62 12.89 13.15 13.4 13.66 13.9 14.15
Between structures 32 - 33 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 65 of 108

Ruling span [m] 128.24 Middle span sag [m] 1.64 1.71 1.79 1.87 1.95 2.04 2.12 2.2 2.29 2.37 2.45
Span length [m] 135.96 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] 6.89 Wave time 5 [seg] 11.55 11.81 12.08 12.36 12.62 12.89 13.15 13.4 13.65 13.9 14.14
Between structures 33 - 34 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 1.49 1.56 1.63 1.7 1.78 1.85 1.93 2.01 2.08 2.16 2.23
Span length [m] 129.8 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] 0.17 Wave time 5 [seg] 11.02 11.27 11.53 11.79 12.04 12.29 12.54 12.78 13.03 13.26 13.49
Between structures 34 - 35 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.24 Middle span sag [m] 1.73 1.81 1.89 1.98 2.06 2.15 2.24 2.32 2.41 2.5 2.59
Span length [m] 139.72 Horiz. Tension [kg] 617.383 589.867 564.074 539.43 517.084 495.887 476.412 458.662 441.773 426.321 411.73
Span vertical proj. [m] -5.39 Wave time 5 [seg] 11.86 12.14 12.41 12.69 12.96 13.24 13.51 13.77 14.03 14.28 14.53

SECTION #10 OPGW AT FINAL CONDITION


Between structures 35 - 36 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 119.32 Middle span sag [m] 1.67 1.74 1.81 1.87 1.94 2.01 2.07 2.14 2.2 2.27 2.33
Span length [m] 116.98 Horiz. Tension [kg] 447.264 430.09 413.776 398.611 384.883 372.305 360.301 349.445 339.165 329.46 320.616
Span vertical proj. [m] 0.05 Wave time 5 [seg] 11.67 11.9 12.13 12.36 12.58 12.79 13 13.2 13.4 13.6 13.78
Between structures 36 - 37 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 119.32 Middle span sag [m] 1.67 1.74 1.81 1.88 1.94 2.01 2.08 2.14 2.2 2.27 2.33
Span length [m] 117 Horiz. Tension [kg] 447.264 430.09 413.776 398.611 384.883 372.305 360.301 349.445 339.165 329.46 320.616
Span vertical proj. [m] -4.55 Wave time 5 [seg] 11.67 11.9 12.14 12.37 12.58 12.8 13.01 13.21 13.41 13.6 13.79
Between structures 37 - 38 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 66 of 108

Ruling span [m] 119.32 Middle span sag [m] 1.8 1.87 1.94 2.02 2.09 2.16 2.23 2.3 2.37 2.44 2.51
Span length [m] 121.31 Horiz. Tension [kg] 447.264 430.09 413.776 398.611 384.883 372.305 360.301 349.445 339.165 329.46 320.616
Span vertical proj. [m] -0.76 Wave time 5 [seg] 12.1 12.34 12.58 12.82 13.04 13.26 13.48 13.69 13.9 14.1 14.29
Between structures 38 - 39 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 119.32 Middle span sag [m] 1.82 1.89 1.97 2.04 2.11 2.19 2.26 2.33 2.4 2.47 2.54
Span length [m] 122 Horiz. Tension [kg] 447.264 430.09 413.776 398.611 384.883 372.305 360.301 349.445 339.165 329.46 320.616
Span vertical proj. [m] -6.73 Wave time 5 [seg] 12.18 12.42 12.66 12.9 13.13 13.35 13.57 13.78 13.98 14.19 14.38

SECTION #11 OPGW AT FINAL CONDITION


Between structures 39 - 40 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.07 Middle span sag [m] 2.02 2.1 2.18 2.26 2.35 2.43 2.51 2.58 2.66 2.74 2.81
Span length [m] 133 Horiz. Tension [kg] 478.265 459.941 442.765 427.312 412.434 398.705 386.126 374.409 363.554 353.272 343.853
Span vertical proj. [m] 8.38 Wave time 5 [seg] 12.84 13.09 13.35 13.58 13.83 14.06 14.29 14.51 14.73 14.94 15.15
Between structures 40 - 41 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.07 Middle span sag [m] 1.56 1.62 1.69 1.75 1.81 1.87 1.94 2 2.06 2.12 2.17
Span length [m] 117.01 Horiz. Tension [kg] 478.265 459.941 442.765 427.312 412.434 398.705 386.126 374.409 363.554 353.272 343.853
Span vertical proj. [m] -0.16 Wave time 5 [seg] 11.28 11.51 11.73 11.94 12.15 12.36 12.56 12.76 12.94 13.13 13.31
Between structures 41 - 42 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.07 Middle span sag [m] 1.94 2.02 2.09 2.17 2.25 2.33 2.4 2.48 2.55 2.63 2.7
Span length [m] 130.17 Horiz. Tension [kg] 478.265 459.941 442.765 427.312 412.434 398.705 386.126 374.409 363.554 353.272 343.853
Span vertical proj. [m] -9.83 Wave time 5 [seg] 12.57 12.82 13.07 13.3 13.54 13.77 13.99 14.21 14.42 14.63 14.83
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 67 of 108

SECTION #12 OPGW AT FINAL CONDITION


Between structures 42 - 43 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.63 2.71 2.79 2.88 2.96 3.04 3.12 3.2 3.28 3.36 3.43
Span length [m] 150 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] 2.71 Wave time 5 [seg] 14.64 14.87 15.09 15.31 15.53 15.74 15.95 16.15 16.35 16.54 16.73
Between structures 43 - 44 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.25 2.33 2.39 2.47 2.54 2.61 2.67 2.74 2.81 2.88 2.94
Span length [m] 138.63 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -12.25 Wave time 5 [seg] 13.55 13.77 13.97 14.18 14.38 14.58 14.77 14.95 15.14 15.31 15.49
Between structures 44 - 45 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.65 2.73 2.81 2.89 2.97 3.04 3.12 3.2 3.27 3.35
Span length [m] 148.11 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -5.74 Wave time 5 [seg] 14.45 14.69 14.9 15.12 15.34 15.55 15.75 15.95 16.15 16.34 16.53
Between structures 45 - 46 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.12 3.2 3.27 3.35
Span length [m] 148.09 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -1.05 Wave time 5 [seg] 14.45 14.68 14.9 15.11 15.33 15.54 15.74 15.94 16.14 16.33 16.52
Between structures 46 - 47 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.12 3.2 3.27 3.35
Span length [m] 148.1 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -0.78 Wave time 5 [seg] 14.45 14.68 14.9 15.12 15.33 15.54 15.74 15.94 16.14 16.33 16.52
Between structures 47 - 48 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 68 of 108

Ruling span [m] 147.44 Middle span sag [m] 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.12 3.2 3.27 3.35
Span length [m] 148.09 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -0.81 Wave time 5 [seg] 14.45 14.68 14.9 15.11 15.33 15.54 15.74 15.94 16.14 16.33 16.52
Between structures 48 - 49 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.12 3.2 3.27 3.35
Span length [m] 148.12 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -0.19 Wave time 5 [seg] 14.45 14.68 14.9 15.12 15.33 15.55 15.75 15.95 16.14 16.33 16.52
Between structures 49 - 50 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.12 3.19 3.27 3.35
Span length [m] 148.07 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -0.44 Wave time 5 [seg] 14.45 14.68 14.89 15.11 15.33 15.54 15.74 15.94 16.14 16.33 16.52
Between structures 50 - 51 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.12 3.2 3.27 3.35
Span length [m] 148.11 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -0.31 Wave time 5 [seg] 14.45 14.68 14.9 15.12 15.33 15.54 15.75 15.94 16.14 16.33 16.52
Between structures 51 - 52 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.12 3.2 3.27 3.35
Span length [m] 148.1 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -0.65 Wave time 5 [seg] 14.45 14.68 14.9 15.12 15.33 15.54 15.74 15.94 16.14 16.33 16.52
Between structures 52 - 53 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.44 Middle span sag [m] 2.56 2.65 2.73 2.81 2.89 2.97 3.04 3.12 3.2 3.28 3.35
Span length [m] 148.18 Horiz. Tension [kg] 467.485 452.893 439.738 427.157 415.15 404.005 393.723 384.015 374.739 366.037 357.766
Span vertical proj. [m] -0.07 Wave time 5 [seg] 14.46 14.69 14.91 15.12 15.34 15.55 15.75 15.95 16.15 16.34 16.53
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 69 of 108

SECTION #13 OPGW AT FINAL CONDITION


Between structures 53 - 54 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 150.01 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 0.14 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.25 16.44
Between structures 54 - 55 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 149.99 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 0.36 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.25 16.43
Between structures 55 - 56 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 150.01 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 0.21 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.25 16.44
Between structures 56 - 57 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 149.99 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.04 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.25 16.44
Between structures 57 - 58 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 150.02 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.21 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.45 15.65 15.86 16.05 16.25 16.44
Between structures 58 - 59 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 70 of 108

Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 149.99 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.05 Wave time 5 [seg] 14.33 14.56 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.25 16.43
Between structures 59 - 60 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 150 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.24 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.25 16.44
Between structures 60 - 61 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.69 2.77 2.85 2.93 3.01 3.08 3.16 3.24 3.32
Span length [m] 150.03 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.18 Wave time 5 [seg] 14.34 14.57 14.8 15.01 15.24 15.45 15.66 15.86 16.05 16.25 16.44
Between structures 61 - 62 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.84 2.92 3 3.08 3.16 3.24 3.31
Span length [m] 149.92 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.19 Wave time 5 [seg] 14.33 14.56 14.78 15 15.22 15.44 15.64 15.85 16.04 16.24 16.43
Between structures 62 - 63 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 149.99 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.35 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.25 16.44
Between structures 63 - 64 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.69 2.77 2.85 2.93 3.01 3.09 3.16 3.24 3.32
Span length [m] 150.05 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.33 Wave time 5 [seg] 14.34 14.57 14.8 15.02 15.24 15.45 15.66 15.86 16.06 16.25 16.44
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 71 of 108

Between structures 64 - 65 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50


Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.85 2.93 3.01 3.08 3.16 3.24 3.31
Span length [m] 150.01 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 1.57 Wave time 5 [seg] 14.33 14.57 14.79 15.01 15.23 15.45 15.65 15.86 16.05 16.25 16.44
Between structures 65 - 66 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.99 Middle span sag [m] 2.52 2.6 2.68 2.76 2.84 2.92 3 3.08 3.16 3.24 3.31
Span length [m] 149.95 Horiz. Tension [kg] 487.31 471.856 457.55 444.396 431.527 419.807 408.663 398.38 388.672 379.252 370.693
Span vertical proj. [m] 2.03 Wave time 5 [seg] 14.33 14.56 14.79 15.01 15.23 15.44 15.65 15.85 16.05 16.24 16.43

SECTION #14 OPGW AT FINAL CONDITION


Between structures 66 - 67 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.45 2.53 2.61 2.69 2.77 2.84 2.92 2.99 3.07 3.14
Span length [m] 142.94 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.4 Wave time 5 [seg] 13.91 14.15 14.37 14.59 14.81 15.02 15.22 15.43 15.62 15.82 16
Between structures 67 - 68 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.54 2.61 2.69 2.77 2.85 2.92 3 3.07 3.14
Span length [m] 143 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 2.22 Wave time 5 [seg] 13.92 14.15 14.38 14.59 14.81 15.02 15.23 15.43 15.63 15.82 16.01
Between structures 68 - 69 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.54 2.61 2.69 2.77 2.85 2.92 3 3.07 3.15
Span length [m] 143.04 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 0.9 Wave time 5 [seg] 13.92 14.15 14.38 14.6 14.82 15.03 15.23 15.44 15.63 15.83 16.01
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 72 of 108

Between structures 69 - 70 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50


Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.53 2.61 2.69 2.77 2.85 2.92 3 3.07 3.14
Span length [m] 142.99 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.46 Wave time 5 [seg] 13.92 14.15 14.37 14.59 14.81 15.02 15.23 15.43 15.63 15.82 16.01
Between structures 70 - 71 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.53 2.61 2.69 2.77 2.84 2.92 3 3.07 3.14
Span length [m] 142.98 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.74 Wave time 5 [seg] 13.92 14.15 14.37 14.59 14.81 15.02 15.23 15.43 15.63 15.82 16.01
Between structures 71 - 72 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.54 2.62 2.69 2.77 2.85 2.92 3 3.07 3.15
Span length [m] 143.05 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.77 Wave time 5 [seg] 13.93 14.16 14.38 14.6 14.82 15.03 15.24 15.44 15.63 15.83 16.02
Between structures 72 - 73 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.54 2.61 2.69 2.77 2.85 2.92 3 3.07 3.15
Span length [m] 143.02 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.83 Wave time 5 [seg] 13.92 14.15 14.38 14.6 14.82 15.03 15.23 15.44 15.63 15.83 16.01
Between structures 73 - 74 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.53 2.61 2.69 2.77 2.84 2.92 2.99 3.07 3.14
Span length [m] 142.97 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.57 Wave time 5 [seg] 13.92 14.15 14.37 14.59 14.81 15.02 15.23 15.43 15.62 15.82 16.01
Between structures 74 - 75 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.54 2.61 2.69 2.77 2.85 2.92 3 3.07 3.14
Span length [m] 143 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 73 of 108

Span vertical proj. [m] 2.2 Wave time 5 [seg] 13.92 14.15 14.38 14.6 14.82 15.02 15.23 15.43 15.63 15.82 16.01
Between structures 75 - 76 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.38 2.46 2.53 2.61 2.69 2.77 2.84 2.92 3 3.07 3.14
Span length [m] 142.97 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.7 Wave time 5 [seg] 13.92 14.15 14.37 14.59 14.81 15.02 15.23 15.43 15.63 15.82 16.01
Between structures 76 - 77 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 142.95 Middle span sag [m] 2.37 2.44 2.52 2.6 2.68 2.76 2.83 2.91 2.98 3.06 3.13
Span length [m] 142.65 Horiz. Tension [kg] 469.531 454.365 440.349 427.193 414.612 403.18 392.324 382.042 372.622 363.489 355.074
Span vertical proj. [m] 1.43 Wave time 5 [seg] 13.89 14.12 14.34 14.56 14.78 14.99 15.19 15.4 15.59 15.78 15.97
SECTION #15 OPGW AT FINAL CONDITION
Between structures 77 - 78 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 86.82 Middle span sag [m] 0.92 0.98 1.04 1.1 1.16 1.22 1.28 1.34 1.4 1.46 1.52
Span length [m] 89.52 Horiz. Tension [kg] 473.882 446.369 421.154 398.236 377.617 358.721 341.836 326.387 312.375 299.512 288.085
Span vertical proj. [m] 1.2 Wave time 5 [seg] 8.67 8.94 9.2 9.46 9.72 9.97 10.21 10.45 10.68 10.91 11.13
Between structures 78 - 79 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 86.82 Middle span sag [m] 0.81 0.86 0.91 0.96 1.02 1.07 1.12 1.18 1.23 1.28 1.33
Span length [m] 83.87 Horiz. Tension [kg] 473.882 446.369 421.154 398.236 377.617 358.721 341.836 326.387 312.375 299.512 288.085
Span vertical proj. [m] 1.3 Wave time 5 [seg] 8.13 8.37 8.62 8.86 9.1 9.34 9.57 9.79 10.01 10.22 10.42
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 74 of 108

SECTION #16 OPGW AT FINAL CONDITION


Between structures 79 - 80 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.9 Middle span sag [m] 2.27 2.36 2.47 2.57 2.67 2.78 2.89 3 3.11 3.22 3.33
Span length [m] 174.18 Horiz. Tension [kg] 730.51 700.695 671.454 645.085 619.864 595.792 573.444 552.245 532.769 514.729 497.839
Span vertical proj. [m] 1.71 Wave time 5 [seg] 13.59 13.88 14.18 14.47 14.76 15.05 15.34 15.63 15.92 16.19 16.47
Between structures 80 - 81 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.9 Middle span sag [m] 0.63 0.66 0.68 0.71 0.74 0.77 0.8 0.83 0.86 0.89 0.92
Span length [m] 91.78 Horiz. Tension [kg] 730.51 700.695 671.454 645.085 619.864 595.792 573.444 552.245 532.769 514.729 497.839
Span vertical proj. [m] 1.87 Wave time 5 [seg] 7.16 7.31 7.47 7.62 7.78 7.93 8.08 8.24 8.39 8.53 8.68

SECTION #17 OPGW AT FINAL CONDITION


Between structures 81 - 82 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 133.1 Middle span sag [m] 2.03 2.11 2.18 2.26 2.34 2.41 2.48 2.56 2.63 2.7 2.77
Span length [m] 132.99 Horiz. Tension [kg] 474.776 457.599 441.859 426.981 413.252 400.673 388.667 377.524 367.243 357.535 348.404
Span vertical proj. [m] 0.59 Wave time 5 [seg] 12.87 13.11 13.34 13.58 13.8 14.01 14.23 14.44 14.64 14.84 15.03
Between structures 82 - 83 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 133.1 Middle span sag [m] 2.04 2.12 2.19 2.27 2.34 2.42 2.49 2.57 2.64 2.71 2.78
Span length [m] 133.23 Horiz. Tension [kg] 474.776 457.599 441.859 426.981 413.252 400.673 388.667 377.524 367.243 357.535 348.404
Span vertical proj. [m] 1.64 Wave time 5 [seg] 12.9 13.14 13.37 13.6 13.82 14.04 14.26 14.46 14.67 14.86 15.06
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 75 of 108

SECTION #18 OPGW AT FINAL CONDITION


Between structures 83 - 84 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.54 2.62 2.7 2.78 2.86 2.94 3.02 3.1 3.18 3.25 3.33
Span length [m] 150.45 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 1.59 Wave time 5 [seg] 14.38 14.61 14.84 15.06 15.27 15.48 15.69 15.9 16.09 16.29 16.47
Between structures 84 - 85 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.54 2.62 2.7 2.78 2.87 2.95 3.03 3.1 3.18 3.26 3.33
Span length [m] 150.55 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 3.1 Wave time 5 [seg] 14.39 14.62 14.85 15.07 15.28 15.5 15.71 15.91 16.11 16.3 16.49
Between structures 85 - 86 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.54 2.62 2.7 2.78 2.86 2.94 3.02 3.1 3.18 3.26 3.33
Span length [m] 150.52 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 2.66 Wave time 5 [seg] 14.39 14.62 14.84 15.06 15.28 15.49 15.7 15.9 16.1 16.29 16.48
Between structures 86 - 87 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.54 2.62 2.7 2.78 2.86 2.94 3.02 3.1 3.18 3.25 3.33
Span length [m] 150.47 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 2.24 Wave time 5 [seg] 14.38 14.61 14.84 15.06 15.28 15.49 15.7 15.9 16.1 16.29 16.48
Between structures 87 - 88 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.54 2.62 2.7 2.78 2.86 2.94 3.02 3.1 3.18 3.26 3.33
Span length [m] 150.5 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 1.95 Wave time 5 [seg] 14.39 14.62 14.84 15.06 15.28 15.49 15.7 15.9 16.1 16.29 16.48
Between structures 88 - 89 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 76 of 108

Ruling span [m] 150.91 Middle span sag [m] 2.54 2.62 2.7 2.78 2.87 2.95 3.03 3.1 3.18 3.26 3.33
Span length [m] 150.54 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 1.59 Wave time 5 [seg] 14.39 14.62 14.85 15.06 15.28 15.49 15.7 15.91 16.1 16.3 16.48
Between structures 89 - 90 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.54 2.62 2.7 2.78 2.86 2.94 3.02 3.1 3.18 3.25 3.33
Span length [m] 150.43 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 1.37 Wave time 5 [seg] 14.38 14.61 14.83 15.05 15.27 15.48 15.69 15.89 16.09 16.28 16.47
Between structures 90 - 91 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.91 Middle span sag [m] 2.65 2.74 2.82 2.91 2.99 3.07 3.16 3.24 3.32 3.4 3.48
Span length [m] 153.8 Horiz. Tension [kg] 487.016 471.849 457.543 444.388 431.806 420.088 408.942 398.66 388.952 379.819 371.26
Span vertical proj. [m] 1.34 Wave time 5 [seg] 14.7 14.94 15.17 15.39 15.61 15.83 16.04 16.25 16.45 16.65 16.84

SECTION #19 OPGW AT FINAL CONDITION


Between structures 91 - 92 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.33 Middle span sag [m] 2.36 2.45 2.53 2.61 2.69 2.77 2.85 2.93 3.01 3.09 3.17
Span length [m] 148.35 Horiz. Tension [kg] 508.034 491.144 475.115 460.235 446.218 433.062 421.056 409.625 398.768 388.773 379.064
Span vertical proj. [m] 2.86 Wave time 5 [seg] 13.88 14.12 14.36 14.59 14.82 15.04 15.25 15.46 15.67 15.87 16.08
Between structures 92 - 93 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.33 Middle span sag [m] 2.32 2.4 2.48 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.11
Span length [m] 147.01 Horiz. Tension [kg] 508.034 491.144 475.115 460.235 446.218 433.062 421.056 409.625 398.768 388.773 379.064
Span vertical proj. [m] 3.02 Wave time 5 [seg] 13.76 13.99 14.23 14.46 14.68 14.9 15.11 15.32 15.53 15.73 15.93
Between structures 93 - 94 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 77 of 108

Ruling span [m] 147.33 Middle span sag [m] 2.32 2.4 2.48 2.56 2.65 2.73 2.8 2.88 2.96 3.04 3.11
Span length [m] 147.04 Horiz. Tension [kg] 508.034 491.144 475.115 460.235 446.218 433.062 421.056 409.625 398.768 388.773 379.064
Span vertical proj. [m] 2.83 Wave time 5 [seg] 13.76 14 14.23 14.46 14.68 14.91 15.12 15.33 15.53 15.73 15.93
Between structures 94 - 95 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 147.33 Middle span sag [m] 2.32 2.4 2.48 2.56 2.64 2.72 2.8 2.88 2.96 3.04 3.11
Span length [m] 147.01 Horiz. Tension [kg] 508.034 491.144 475.115 460.235 446.218 433.062 421.056 409.625 398.768 388.773 379.064
Span vertical proj. [m] 3.1 Wave time 5 [seg] 13.76 13.99 14.23 14.46 14.68 14.9 15.11 15.32 15.53 15.73 15.93

SECTION #20 OPGW AT FINAL CONDITION


Between structures 95 - 96 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.23 Middle span sag [m] 2.19 2.27 2.35 2.43 2.51 2.59 2.67 2.75 2.83 2.91 2.99
Span length [m] 148.45 Horiz. Tension [kg] 549.425 529.949 511.623 494.444 478.703 463.825 449.806 436.65 424.644 413.212 402.355
Span vertical proj. [m] 1.51 Wave time 5 [seg] 13.36 13.6 13.84 14.08 14.31 14.54 14.76 14.99 15.2 15.41 15.61
Between structures 96 - 97 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.23 Middle span sag [m] 2.19 2.27 2.35 2.44 2.52 2.6 2.68 2.76 2.84 2.91 2.99
Span length [m] 148.52 Horiz. Tension [kg] 549.425 529.949 511.623 494.444 478.703 463.825 449.806 436.65 424.644 413.212 402.355
Span vertical proj. [m] 1.2 Wave time 5 [seg] 13.36 13.61 13.85 14.09 14.32 14.55 14.77 14.99 15.2 15.41 15.62
Between structures 97 - 98 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.23 Middle span sag [m] 2.19 2.27 2.35 2.43 2.51 2.59 2.68 2.76 2.83 2.91 2.99
Span length [m] 148.49 Horiz. Tension [kg] 549.425 529.949 511.623 494.444 478.703 463.825 449.806 436.65 424.644 413.212 402.355
Span vertical proj. [m] 0.97 Wave time 5 [seg] 13.36 13.61 13.85 14.09 14.32 14.54 14.77 14.99 15.2 15.41 15.62
Between structures 98 - 99 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 78 of 108

Ruling span [m] 149.23 Middle span sag [m] 2.19 2.27 2.35 2.44 2.52 2.6 2.68 2.76 2.84 2.92 2.99
Span length [m] 148.54 Horiz. Tension [kg] 549.425 529.949 511.623 494.444 478.703 463.825 449.806 436.65 424.644 413.212 402.355
Span vertical proj. [m] 1.55 Wave time 5 [seg] 13.37 13.61 13.85 14.09 14.32 14.55 14.77 15 15.21 15.42 15.62
Between structures 99 - 100 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.23 Middle span sag [m] 2.19 2.27 2.35 2.43 2.51 2.6 2.68 2.76 2.84 2.91 2.99
Span length [m] 148.5 Horiz. Tension [kg] 549.425 529.949 511.623 494.444 478.703 463.825 449.806 436.65 424.644 413.212 402.355
Span vertical proj. [m] 2.12 Wave time 5 [seg] 13.36 13.61 13.85 14.09 14.32 14.55 14.77 14.99 15.2 15.41 15.62
Between structures 100 - 101 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.23 Middle span sag [m] 2.19 2.27 2.35 2.43 2.51 2.59 2.67 2.76 2.83 2.91 2.99
Span length [m] 148.45 Horiz. Tension [kg] 549.425 529.949 511.623 494.444 478.703 463.825 449.806 436.65 424.644 413.212 402.355
Span vertical proj. [m] 2.82 Wave time 5 [seg] 13.36 13.6 13.84 14.08 14.31 14.54 14.77 14.99 15.2 15.41 15.61
Between structures 101 - 102 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 149.23 Middle span sag [m] 2.34 2.43 2.52 2.6 2.69 2.77 2.86 2.95 3.03 3.12 3.2
Span length [m] 153.54 Horiz. Tension [kg] 549.425 529.949 511.623 494.444 478.703 463.825 449.806 436.65 424.644 413.212 402.355
Span vertical proj. [m] 3.01 Wave time 5 [seg] 13.82 14.07 14.32 14.57 14.8 15.04 15.27 15.5 15.72 15.93 16.15

SECTION #21 OPGW AT FINAL CONDITION


Between structures 102 - 103 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.15 Middle span sag [m] 2.07 2.15 2.23 2.31 2.39 2.47 2.56 2.64 2.72 2.8 2.88
Span length [m] 148.93 Horiz. Tension [kg] 584.494 562.721 542.671 523.769 505.729 489.413 473.672 459.08 445.636 433.055 421.048
Span vertical proj. [m] 3.08 Wave time 5 [seg] 12.99 13.24 13.49 13.73 13.97 14.2 14.44 14.66 14.88 15.1 15.31
Between structures 103 - 104 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 79 of 108

Ruling span [m] 150.15 Middle span sag [m] 2.63 2.74 2.84 2.94 3.05 3.15 3.25 3.36 3.46 3.56 3.66
Span length [m] 167.96 Horiz. Tension [kg] 584.494 562.721 542.671 523.769 505.729 489.413 473.672 459.08 445.636 433.055 421.048
Span vertical proj. [m] 2.86 Wave time 5 [seg] 14.65 14.94 15.21 15.48 15.76 16.02 16.28 16.54 16.79 17.03 17.27
Between structures 104 - 105 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.15 Middle span sag [m] 1.58 1.64 1.7 1.76 1.82 1.88 1.95 2.01 2.07 2.13 2.19
Span length [m] 129.97 Horiz. Tension [kg] 584.494 562.721 542.671 523.769 505.729 489.413 473.672 459.08 445.636 433.055 421.048
Span vertical proj. [m] 1.62 Wave time 5 [seg] 11.34 11.56 11.77 11.98 12.19 12.39 12.6 12.79 12.99 13.17 13.36
Between structures 105 - 106 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.15 Middle span sag [m] 2.07 2.15 2.23 2.31 2.39 2.47 2.56 2.64 2.72 2.8 2.88
Span length [m] 148.94 Horiz. Tension [kg] 584.494 562.721 542.671 523.769 505.729 489.413 473.672 459.08 445.636 433.055 421.048
Span vertical proj. [m] 1.24 Wave time 5 [seg] 12.99 13.24 13.49 13.73 13.97 14.2 14.44 14.66 14.88 15.1 15.31
Between structures 106 - 107 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.15 Middle span sag [m] 2.07 2.15 2.23 2.31 2.4 2.48 2.56 2.64 2.72 2.8 2.88
Span length [m] 148.96 Horiz. Tension [kg] 584.494 562.721 542.671 523.769 505.729 489.413 473.672 459.08 445.636 433.055 421.048
Span vertical proj. [m] 2.28 Wave time 5 [seg] 13 13.25 13.49 13.73 13.97 14.2 14.44 14.67 14.89 15.1 15.31
Between structures 107 - 108 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 150.15 Middle span sag [m] 2.07 2.16 2.23 2.32 2.4 2.48 2.56 2.64 2.72 2.8 2.88
Span length [m] 149.05 Horiz. Tension [kg] 584.494 562.721 542.671 523.769 505.729 489.413 473.672 459.08 445.636 433.055 421.048
Span vertical proj. [m] 3.31 Wave time 5 [seg] 13.01 13.25 13.5 13.74 13.98 14.21 14.45 14.68 14.9 15.11 15.32
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 80 of 108

SECTION #22 OPGW AT FINAL CONDITION


Between structures 108 - 109 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.18 Middle span sag [m] 2.14 2.23 2.31 2.39 2.47 2.55 2.62 2.7 2.78 2.86 2.94
Span length [m] 144.21 Horiz. Tension [kg] 529.332 509.856 492.104 475.502 460.335 445.743 432.588 420.007 408.001 397.144 386.862
Span vertical proj. [m] 2.59 Wave time 5 [seg] 13.22 13.47 13.71 13.95 14.18 14.41 14.63 14.84 15.06 15.27 15.47
Between structures 109 - 110 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.18 Middle span sag [m] 2.14 2.23 2.31 2.39 2.47 2.55 2.62 2.7 2.78 2.86 2.93
Span length [m] 144.18 Horiz. Tension [kg] 529.332 509.856 492.104 475.502 460.335 445.743 432.588 420.007 408.001 397.144 386.862
Span vertical proj. [m] 2.74 Wave time 5 [seg] 13.22 13.47 13.71 13.95 14.18 14.41 14.62 14.84 15.06 15.26 15.46
Between structures 110 - 111 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.18 Middle span sag [m] 2.14 2.23 2.31 2.39 2.47 2.55 2.62 2.7 2.78 2.86 2.94
Span length [m] 144.21 Horiz. Tension [kg] 529.332 509.856 492.104 475.502 460.335 445.743 432.588 420.007 408.001 397.144 386.862
Span vertical proj. [m] 3.63 Wave time 5 [seg] 13.22 13.47 13.71 13.95 14.18 14.41 14.63 14.85 15.06 15.27 15.47
Between structures 111 - 112 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.18 Middle span sag [m] 2.15 2.23 2.31 2.39 2.47 2.55 2.63 2.7 2.78 2.86 2.94
Span length [m] 144.23 Horiz. Tension [kg] 529.332 509.856 492.104 475.502 460.335 445.743 432.588 420.007 408.001 397.144 386.862
Span vertical proj. [m] 1.96 Wave time 5 [seg] 13.22 13.47 13.71 13.95 14.18 14.41 14.63 14.85 15.06 15.27 15.47
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 81 of 108

SECTION #23 OPGW AT FINAL CONDITION


Between structures 112 - 113 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.49 Middle span sag [m] 2.62 2.71 2.8 2.88 2.96 3.05 3.13 3.21 3.29 3.37 3.45
Span length [m] 150.05 Horiz. Tension [kg] 468.363 453.483 439.753 427.172 414.879 403.735 393.165 383.17 373.749 364.904 356.633
Span vertical proj. [m] 3.35 Wave time 5 [seg] 14.63 14.86 15.1 15.32 15.54 15.75 15.97 16.17 16.38 16.57 16.76
Between structures 113 - 114 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.49 Middle span sag [m] 2.45 2.53 2.61 2.69 2.77 2.84 2.92 3 3.07 3.15 3.22
Span length [m] 145 Horiz. Tension [kg] 468.363 453.483 439.753 427.172 414.879 403.735 393.165 383.17 373.749 364.904 356.633
Span vertical proj. [m] 3.32 Wave time 5 [seg] 14.13 14.36 14.59 14.8 15.02 15.22 15.43 15.63 15.82 16.01 16.2
Between structures 114 - 115 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.49 Middle span sag [m] 2.45 2.53 2.61 2.69 2.77 2.84 2.92 3 3.07 3.15 3.22
Span length [m] 145 Horiz. Tension [kg] 468.363 453.483 439.753 427.172 414.879 403.735 393.165 383.17 373.749 364.904 356.633
Span vertical proj. [m] 3.08 Wave time 5 [seg] 14.13 14.36 14.59 14.8 15.02 15.23 15.43 15.63 15.82 16.02 16.2
Between structures 115 - 116 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.49 Middle span sag [m] 2.45 2.53 2.61 2.69 2.77 2.84 2.92 3 3.07 3.15 3.22
Span length [m] 145.01 Horiz. Tension [kg] 468.363 453.483 439.753 427.172 414.879 403.735 393.165 383.17 373.749 364.904 356.633
Span vertical proj. [m] 3.42 Wave time 5 [seg] 14.14 14.37 14.59 14.8 15.02 15.23 15.43 15.63 15.83 16.02 16.2
Between structures 116 - 117 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.49 Middle span sag [m] 2.42 2.5 2.58 2.65 2.73 2.81 2.88 2.96 3.03 3.1 3.18
Span length [m] 144.03 Horiz. Tension [kg] 468.363 453.483 439.753 427.172 414.879 403.735 393.165 383.17 373.749 364.904 356.633
Span vertical proj. [m] 2.86 Wave time 5 [seg] 14.04 14.27 14.49 14.7 14.92 15.12 15.32 15.52 15.72 15.91 16.09
Between structures 117 - 118 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 82 of 108

Ruling span [m] 145.49 Middle span sag [m] 2.48 2.56 2.65 2.72 2.8 2.88 2.96 3.04 3.11 3.19 3.26
Span length [m] 145.97 Horiz. Tension [kg] 468.363 453.483 439.753 427.172 414.879 403.735 393.165 383.17 373.749 364.904 356.633
Span vertical proj. [m] 2.51 Wave time 5 [seg] 14.23 14.46 14.68 14.9 15.12 15.33 15.53 15.73 15.93 16.12 16.31
Between structures 118 - 119 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 145.49 Middle span sag [m] 2.39 2.47 2.55 2.62 2.7 2.78 2.85 2.93 3 3.07 3.14
Span length [m] 143.3 Horiz. Tension [kg] 468.363 453.483 439.753 427.172 414.879 403.735 393.165 383.17 373.749 364.904 356.633
Span vertical proj. [m] 1.57 Wave time 5 [seg] 13.97 14.19 14.41 14.63 14.84 15.04 15.25 15.44 15.64 15.83 16.01

SECTION #24 OPGW AT FINAL CONDITION


Between structures 119 - 120 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 2.38 2.46 2.53 2.61 2.68 2.76 2.83 2.9 2.97 3.04 3.11
Span length [m] 137.96 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 2.72 Wave time 5 [seg] 13.93 14.15 14.37 14.58 14.78 14.99 15.19 15.38 15.57 15.75 15.93
Between structures 120 - 121 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 2.38 2.46 2.54 2.61 2.69 2.76 2.83 2.91 2.98 3.05 3.12
Span length [m] 138.06 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 2.98 Wave time 5 [seg] 13.94 14.16 14.38 14.59 14.79 15 15.2 15.39 15.58 15.76 15.94
Between structures 121 - 122 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 2.38 2.46 2.53 2.61 2.68 2.76 2.83 2.9 2.97 3.04 3.11
Span length [m] 138 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 3.7 Wave time 5 [seg] 13.93 14.16 14.37 14.59 14.79 14.99 15.19 15.38 15.57 15.75 15.93
Between structures 122 - 123 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 83 of 108

Ruling span [m] 138.54 Middle span sag [m] 2.38 2.46 2.53 2.61 2.68 2.76 2.83 2.9 2.98 3.05 3.12
Span length [m] 138.03 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 2.61 Wave time 5 [seg] 13.93 14.16 14.37 14.59 14.79 15 15.19 15.39 15.57 15.75 15.94
Between structures 123 - 124 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 2.38 2.46 2.53 2.61 2.68 2.76 2.83 2.9 2.97 3.04 3.11
Span length [m] 137.98 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 2.66 Wave time 5 [seg] 13.93 14.15 14.37 14.58 14.79 14.99 15.19 15.38 15.57 15.75 15.93
Between structures 124 - 125 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 2.95 3.05 3.14 3.24 3.33 3.42 3.51 3.6 3.69 3.78 3.86
Span length [m] 153.72 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 3.39 Wave time 5 [seg] 15.52 15.77 16.01 16.25 16.47 16.7 16.92 17.14 17.35 17.55 17.75
Between structures 125 - 126 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 1.87 1.93 1.99 2.05 2.1 2.16 2.22 2.28 2.33 2.39 2.44
Span length [m] 122.26 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 0.58 Wave time 5 [seg] 12.34 12.54 12.73 12.92 13.1 13.28 13.46 13.63 13.79 13.95 14.11
Between structures 126 - 127 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 2.38 2.46 2.53 2.61 2.68 2.76 2.83 2.9 2.97 3.04 3.11
Span length [m] 138.01 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 0.23 Wave time 5 [seg] 13.93 14.15 14.37 14.58 14.79 14.99 15.19 15.38 15.57 15.75 15.93
Between structures 127 - 128 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 138.54 Middle span sag [m] 2.37 2.45 2.52 2.6 2.67 2.75 2.82 2.89 2.96 3.03 3.1
Span length [m] 137.76 Horiz. Tension [kg] 436.779 423.049 410.469 398.463 387.607 377.038 367.33 358.198 349.64 341.657 333.962
Span vertical proj. [m] 3.59 Wave time 5 [seg] 13.91 14.13 14.35 14.56 14.76 14.97 15.17 15.36 15.54 15.73 15.91
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 84 of 108

SECTION #25 OPGW AT FINAL CONDITION


Between structures 128 - 129 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.81 2.89 2.97 3.04 3.12 3.19
Span length [m] 144.22 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 1.86 Wave time 5 [seg] 14.05 14.28 14.5 14.72 14.94 15.15 15.36 15.55 15.75 15.94 16.13
Between structures 129 - 130 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.82 2.9 2.97 3.05 3.12 3.2
Span length [m] 144.28 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 2.57 Wave time 5 [seg] 14.06 14.28 14.51 14.73 14.94 15.15 15.36 15.56 15.76 15.95 16.14
Between structures 130 - 131 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.82 2.89 2.97 3.04 3.12 3.19
Span length [m] 144.25 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 2.71 Wave time 5 [seg] 14.05 14.28 14.51 14.72 14.94 15.15 15.36 15.56 15.75 15.94 16.13
Between structures 131 - 132 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.82 2.89 2.97 3.04 3.12 3.19
Span length [m] 144.25 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 2.62 Wave time 5 [seg] 14.05 14.28 14.51 14.72 14.94 15.15 15.36 15.56 15.75 15.94 16.14
Between structures 132 - 133 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.81 2.89 2.97 3.04 3.12 3.19
Span length [m] 144.22 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 2.87 Wave time 5 [seg] 14.05 14.28 14.5 14.72 14.94 15.15 15.36 15.56 15.75 15.94 16.13
Between structures 133 - 134 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 85 of 108

Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.82 2.89 2.97 3.04 3.12 3.19
Span length [m] 144.24 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 3.07 Wave time 5 [seg] 14.05 14.28 14.51 14.72 14.94 15.15 15.36 15.56 15.75 15.94 16.13
Between structures 134 - 135 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.82 2.89 2.97 3.05 3.12 3.19
Span length [m] 144.27 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 2.58 Wave time 5 [seg] 14.05 14.28 14.51 14.73 14.94 15.15 15.36 15.56 15.76 15.95 16.14
Between structures 135 - 136 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 144.21 Middle span sag [m] 2.42 2.5 2.58 2.66 2.74 2.81 2.89 2.97 3.04 3.12 3.19
Span length [m] 144.18 Horiz. Tension [kg] 468.947 454.068 440.051 427.182 414.889 403.458 392.6 382.606 373.186 364.34 355.782
Span vertical proj. [m] 3.33 Wave time 5 [seg] 14.05 14.27 14.5 14.72 14.93 15.14 15.35 15.55 15.75 15.94 16.13

SECTION #26 OPGW AT FINAL CONDITION


Between structures 136 - 137 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 91.5 Middle span sag [m] 0.97 1.03 1.09 1.15 1.21 1.27 1.33 1.38 1.44 1.5 1.56
Span length [m] 91.54 Horiz. Tension [kg] 469.262 443.472 419.981 398.211 378.74 361.28 344.969 330.382 316.944 304.942 293.515
Span vertical proj. [m] 2.5 Wave time 5 [seg] 8.91 9.17 9.42 9.68 9.92 10.16 10.4 10.62 10.85 11.06 11.27

SECTION #27 OPGW AT FINAL CONDITION


Between structures 137 - 138 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.13 Middle span sag [m] 1.96 2.03 2.1 2.17 2.25 2.32 2.39 2.46 2.53 2.59 2.66
Span length [m] 126.01 Horiz. Tension [kg] 443.195 427.167 412.29 398.849 385.982 374.265 363.122 352.841 343.135 334.291 325.734
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 86 of 108

Span vertical proj. [m] 2.36 Wave time 5 [seg] 12.63 12.86 13.09 13.31 13.53 13.74 13.95 14.15 14.35 14.54 14.73
Between structures 138 - 139 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.13 Middle span sag [m] 1.96 2.03 2.1 2.17 2.25 2.32 2.39 2.46 2.53 2.59 2.66
Span length [m] 125.99 Horiz. Tension [kg] 443.195 427.167 412.29 398.849 385.982 374.265 363.122 352.841 343.135 334.291 325.734
Span vertical proj. [m] 2.42 Wave time 5 [seg] 12.62 12.86 13.09 13.31 13.53 13.74 13.95 14.15 14.35 14.54 14.73
Between structures 139 - 140 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.13 Middle span sag [m] 1.96 2.03 2.1 2.17 2.25 2.32 2.39 2.46 2.53 2.59 2.66
Span length [m] 126 Horiz. Tension [kg] 443.195 427.167 412.29 398.849 385.982 374.265 363.122 352.841 343.135 334.291 325.734
Span vertical proj. [m] 2.98 Wave time 5 [seg] 12.63 12.86 13.09 13.31 13.53 13.74 13.95 14.15 14.35 14.54 14.73
Between structures 140 - 141 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.13 Middle span sag [m] 1.96 2.03 2.1 2.17 2.25 2.32 2.39 2.46 2.53 2.59 2.66
Span length [m] 125.99 Horiz. Tension [kg] 443.195 427.167 412.29 398.849 385.982 374.265 363.122 352.841 343.135 334.291 325.734
Span vertical proj. [m] 2.66 Wave time 5 [seg] 12.62 12.86 13.09 13.31 13.53 13.74 13.95 14.15 14.35 14.54 14.73
Between structures 141 - 142 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.13 Middle span sag [m] 1.96 2.03 2.1 2.17 2.25 2.32 2.39 2.46 2.53 2.59 2.66
Span length [m] 126.03 Horiz. Tension [kg] 443.195 427.167 412.29 398.849 385.982 374.265 363.122 352.841 343.135 334.291 325.734
Span vertical proj. [m] 2.8 Wave time 5 [seg] 12.63 12.86 13.09 13.31 13.53 13.74 13.95 14.15 14.35 14.54 14.73
Between structures 142 - 143 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 126.13 Middle span sag [m] 1.99 2.06 2.13 2.21 2.28 2.35 2.42 2.49 2.56 2.63 2.7
Span length [m] 126.95 Horiz. Tension [kg] 443.195 427.167 412.29 398.849 385.982 374.265 363.122 352.841 343.135 334.291 325.734
Span vertical proj. [m] 2.94 Wave time 5 [seg] 12.72 12.96 13.19 13.41 13.63 13.84 14.05 14.26 14.46 14.65 14.84
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 87 of 108

SECTION #28 OPGW AT FINAL CONDITION


Between structures 143 - 144 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.65 2.72 2.8 2.88 2.95 3.02 3.1
Span length [m] 141.72 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.76 Wave time 5 [seg] 13.79 14.02 14.25 14.47 14.68 14.9 15.11 15.31 15.51 15.7 15.89
Between structures 144 - 145 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.7 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 2.79 Wave time 5 [seg] 13.79 14.02 14.25 14.46 14.68 14.9 15.1 15.31 15.51 15.7 15.88
Between structures 145 - 146 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.7 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.26 Wave time 5 [seg] 13.79 14.02 14.25 14.46 14.68 14.9 15.1 15.31 15.51 15.7 15.89
Between structures 146 - 147 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.68 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.75 Wave time 5 [seg] 13.79 14.02 14.24 14.46 14.68 14.9 15.1 15.31 15.5 15.7 15.88
Between structures 147 - 148 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.65 2.72 2.8 2.88 2.95 3.02 3.1
Span length [m] 141.72 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.6 Wave time 5 [seg] 13.79 14.02 14.25 14.47 14.68 14.9 15.11 15.31 15.51 15.7 15.89
Between structures 148 - 149 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 88 of 108

Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.09
Span length [m] 141.67 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.99 Wave time 5 [seg] 13.79 14.02 14.24 14.46 14.68 14.9 15.1 15.3 15.5 15.69 15.88
Between structures 149 - 150 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.65 2.72 2.8 2.88 2.95 3.02 3.1
Span length [m] 141.73 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.7 Wave time 5 [seg] 13.79 14.02 14.25 14.47 14.68 14.9 15.11 15.31 15.51 15.7 15.89
Between structures 150 - 151 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.7 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.96 Wave time 5 [seg] 13.79 14.02 14.25 14.46 14.68 14.9 15.1 15.31 15.51 15.7 15.89
Between structures 151 - 152 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.69 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.37 Wave time 5 [seg] 13.79 14.02 14.24 14.46 14.68 14.9 15.1 15.31 15.5 15.7 15.88
Between structures 152 - 153 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.72 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 2.93 Wave time 5 [seg] 13.79 14.02 14.25 14.46 14.68 14.9 15.11 15.31 15.51 15.7 15.89
Between structures 153 - 154 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.09
Span length [m] 141.69 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 1.32 Wave time 5 [seg] 13.78 14.02 14.24 14.46 14.68 14.9 15.1 15.3 15.5 15.69 15.88
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 89 of 108

Between structures 154 - 155 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50


Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.7 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 2.47 Wave time 5 [seg] 13.79 14.02 14.25 14.46 14.68 14.9 15.1 15.31 15.5 15.7 15.88
Between structures 155 - 156 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.33 2.41 2.49 2.57 2.64 2.72 2.8 2.87 2.95 3.02 3.1
Span length [m] 141.69 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 3.24 Wave time 5 [seg] 13.79 14.02 14.24 14.46 14.68 14.9 15.1 15.31 15.5 15.7 15.88
Between structures 156 - 157 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 141.67 Middle span sag [m] 2.34 2.42 2.49 2.57 2.65 2.73 2.8 2.88 2.96 3.03 3.1
Span length [m] 141.85 Horiz. Tension [kg] 470.116 454.663 440.358 427.203 414.623 402.616 391.759 381.478 371.771 362.782 354.223
Span vertical proj. [m] 2.95 Wave time 5 [seg] 13.8 14.03 14.26 14.48 14.7 14.91 15.12 15.32 15.52 15.71 15.9

SECTION #29 OPGW AT FINAL CONDITION


Between structures 157 - 158 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 146.03 Middle span sag [m] 2.13 2.2 2.27 2.35 2.42 2.49 2.56 2.63 2.7 2.77 2.84
Span length [m] 139.02 Horiz. Tension [kg] 495.965 479.65 464.197 449.892 436.449 423.867 411.861 401.004 390.578 380.727 371.594
Span vertical proj. [m] 3.95 Wave time 5 [seg] 13.17 13.39 13.61 13.83 14.04 14.25 14.45 14.65 14.84 15.03 15.22
Between structures 158 - 159 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 146.03 Middle span sag [m] 2.25 2.33 2.4 2.48 2.56 2.63 2.71 2.78 2.86 2.93 3
Span length [m] 142.98 Horiz. Tension [kg] 495.965 479.65 464.197 449.892 436.449 423.867 411.861 401.004 390.578 380.727 371.594
Span vertical proj. [m] 3.28 Wave time 5 [seg] 13.54 13.77 14 14.22 14.44 14.65 14.86 15.06 15.26 15.46 15.65
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 90 of 108

Between structures 159 - 160 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50


Ruling span [m] 146.03 Middle span sag [m] 1.06 1.09 1.13 1.17 1.2 1.24 1.28 1.31 1.34 1.38 1.41
Span length [m] 97.94 Horiz. Tension [kg] 495.965 479.65 464.197 449.892 436.449 423.867 411.861 401.004 390.578 380.727 371.594
Span vertical proj. [m] 7.94 Wave time 5 [seg] 9.29 9.45 9.6 9.75 9.9 10.05 10.2 10.33 10.47 10.6 10.73
Between structures 160 - 161 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 146.03 Middle span sag [m] 3.15 3.25 3.36 3.47 3.58 3.68 3.79 3.89 4 4.1 4.2
Span length [m] 169.06 Horiz. Tension [kg] 495.965 479.65 464.197 449.892 436.449 423.867 411.861 401.004 390.578 380.727 371.594
Span vertical proj. [m] -1.19 Wave time 5 [seg] 16.01 16.28 16.55 16.81 17.07 17.32 17.57 17.81 18.05 18.28 18.5
Between structures 161 - 162 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 146.03 Middle span sag [m] 2.48 2.56 2.65 2.73 2.82 2.9 2.98 3.06 3.15 3.23 3.31
Span length [m] 150 Horiz. Tension [kg] 495.965 479.65 464.197 449.892 436.449 423.867 411.861 401.004 390.578 380.727 371.594
Span vertical proj. [m] 5.14 Wave time 5 [seg] 14.21 14.45 14.69 14.92 15.15 15.37 15.6 15.81 16.02 16.22 16.42
Between structures 162 - 163 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 146.03 Middle span sag [m] 2.48 2.56 2.65 2.73 2.81 2.9 2.98 3.06 3.14 3.23 3.3
Span length [m] 149.93 Horiz. Tension [kg] 495.965 479.65 464.197 449.892 436.449 423.867 411.861 401.004 390.578 380.727 371.594
Span vertical proj. [m] 5.42 Wave time 5 [seg] 14.21 14.44 14.68 14.92 15.14 15.37 15.59 15.8 16.01 16.21 16.41

SECTION #30 OPGW AT FINAL CONDITION


Between structures 163 - 164 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 120.79 Middle span sag [m] 1.6 1.67 1.74 1.81 1.88 1.95 2.02 2.09 2.15 2.22 2.29
Span length [m] 119.07 Horiz. Tension [kg] 482.328 462.28 443.956 427.356 411.329 397.027 383.299 371.007 359.577 348.722 338.729
Span vertical proj. [m] 0.13 Wave time 5 [seg] 11.44 11.68 11.92 12.15 12.38 12.61 12.83 13.04 13.25 13.45 13.65
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 91 of 108

Between structures 164 - 165 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50


Ruling span [m] 120.79 Middle span sag [m] 1.13 1.18 1.23 1.27 1.32 1.37 1.42 1.47 1.52 1.56 1.61
Span length [m] 99.9 Horiz. Tension [kg] 482.328 462.28 443.956 427.356 411.329 397.027 383.299 371.007 359.577 348.722 338.729
Span vertical proj. [m] 2.34 Wave time 5 [seg] 9.6 9.8 10 10.19 10.39 10.58 10.76 10.94 11.11 11.29 11.45
Between structures 165 - 166 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 120.79 Middle span sag [m] 1.83 1.91 1.99 2.07 2.15 2.23 2.31 2.39 2.46 2.54 2.61
Span length [m] 127.1 Horiz. Tension [kg] 482.328 462.28 443.956 427.356 411.329 397.027 383.299 371.007 359.577 348.722 338.729
Span vertical proj. [m] 10.99 Wave time 5 [seg] 12.23 12.49 12.75 12.99 13.24 13.48 13.72 13.95 14.17 14.38 14.6
Between structures 166 - 167 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 120.79 Middle span sag [m] 2.01 2.1 2.18 2.27 2.36 2.44 2.53 2.61 2.7 2.78 2.86
Span length [m] 132.31 Horiz. Tension [kg] 482.328 462.28 443.956 427.356 411.329 397.027 383.299 371.007 359.577 348.722 338.729
Span vertical proj. [m] 22.41 Wave time 5 [seg] 12.8 13.07 13.34 13.6 13.86 14.11 14.36 14.59 14.82 15.05 15.27

SECTION #31 OPGW AT FINAL CONDITION


Between structures 167 - 168 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 137.96 Middle span sag [m] 1.94 2.03 2.12 2.22 2.32 2.42 2.53 2.63 2.74 2.85 2.95
Span length [m] 161.94 Horiz. Tension [kg] 738.043 705.357 674.393 645.154 617.637 591.268 567.198 544.276 523.077 503.602 485.277
Span vertical proj. [m] 7.24 Wave time 5 [seg] 12.58 12.87 13.16 13.45 13.75 14.05 14.35 14.65 14.94 15.23 15.51
Between structures 168 - 169 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 137.96 Middle span sag [m] 0.72 0.75 0.79 0.82 0.86 0.9 0.94 0.98 1.02 1.06 1.1
Span length [m] 98.6 Horiz. Tension [kg] 738.043 705.357 674.393 645.154 617.637 591.268 567.198 544.276 523.077 503.602 485.277
Span vertical proj. [m] 5.8 Wave time 5 [seg] 7.66 7.84 8.01 8.19 8.37 8.56 8.74 8.92 9.1 9.27 9.45
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 92 of 108

Between structures 169 - 169A Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50


Ruling span [m] 137.96 Middle span sag [m] 1.35 1.41 1.48 1.54 1.61 1.68 1.76 1.83 1.9 1.98 2.05
Span length [m] 134.99 Horiz. Tension [kg] 738.043 705.357 674.393 645.154 617.637 591.268 567.198 544.276 523.077 503.602 485.277
Span vertical proj. [m] 6.62 Wave time 5 [seg] 10.49 10.73 10.97 11.22 11.46 11.72 11.96 12.21 12.46 12.7 12.93
Between structures 169A - 170 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 137.96 Middle span sag [m] 1.35 1.41 1.47 1.54 1.61 1.68 1.75 1.83 1.9 1.98 2.05
Span length [m] 134.91 Horiz. Tension [kg] 738.043 705.357 674.393 645.154 617.637 591.268 567.198 544.276 523.077 503.602 485.277
Span vertical proj. [m] 6.92 Wave time 5 [seg] 10.48 10.72 10.96 11.21 11.46 11.71 11.96 12.21 12.45 12.69 12.93

SECTION #32 OPGW AT FINAL CONDITION


Between structures 170 - 171 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 204.55 Middle span sag [m] 0.54 0.55 0.57 0.58 0.6 0.61 0.62 0.64 0.65 0.66 0.68
Span length [m] 76.54 Horiz. Tension [kg] 592.156 577.273 562.963 549.517 536.644 524.346 512.91 501.761 491.475 481.475 472.051
Span vertical proj. [m] 3.7 Wave time 5 [seg] 6.64 6.72 6.81 6.89 6.97 7.05 7.13 7.21 7.29 7.36 7.43
Between structures 171 - 172 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 204.55 Middle span sag [m] 4.97 5.1 5.23 5.36 5.49 5.61 5.74 5.87 5.99 6.12 6.24
Span length [m] 232.05 Horiz. Tension [kg] 592.156 577.273 562.963 549.517 536.644 524.346 512.91 501.761 491.475 481.475 472.051
Span vertical proj. [m] 11.72 Wave time 5 [seg] 20.13 20.39 20.65 20.9 21.15 21.39 21.63 21.87 22.1 22.33 22.55

SECTION #33 OPGW AT FINAL CONDITION


Between structures 172 - 173 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 96.44 Middle span sag [m] 0.77 0.82 0.87 0.92 0.98 1.03 1.09 1.15 1.21 1.27 1.33
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 93 of 108

Span length [m] 96.44 Horiz. Tension [kg] 655.45 618.171 583.191 550.508 520.122 492.035 466.245 441.602 419.834 399.788 381.466
Span vertical proj. [m] 0.77 Wave time 5 [seg] 7.94 8.18 8.42 8.67 8.92 9.17 9.42 9.68 9.93 10.17 10.42

SECTION #34 OPGW AT FINAL CONDITION


Between structures 173 - 174 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 154.93 Middle span sag [m] 1.73 1.8 1.87 1.95 2.03 2.11 2.19 2.27 2.35 2.43 2.52
Span length [m] 152.93 Horiz. Tension [kg] 739.687 709.872 681.204 654.835 629.04 605.542 583.194 562.569 542.518 524.478 507.3
Span vertical proj. [m] 4.79 Wave time 5 [seg] 11.86 12.11 12.36 12.61 12.86 13.11 13.36 13.6 13.85 14.09 14.33
Between structures 174 - 175 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 154.93 Middle span sag [m] 1.82 1.89 1.97 2.05 2.14 2.22 2.31 2.39 2.48 2.56 2.65
Span length [m] 156.97 Horiz. Tension [kg] 739.687 709.872 681.204 654.835 629.04 605.542 583.194 562.569 542.518 524.478 507.3
Span vertical proj. [m] 3.69 Wave time 5 [seg] 12.17 12.43 12.69 12.94 13.2 13.46 13.71 13.96 14.22 14.46 14.7

SECTION #35 OPGW AT FINAL CONDITION


Between structures 175 - 176 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 162 Middle span sag [m] 2.24 2.34 2.43 2.52 2.62 2.71 2.81 2.91 3.01 3.11 3.21
Span length [m] 172.33 Horiz. Tension [kg] 722.98 694.887 668.517 643.871 620.373 598.023 577.398 557.92 539.593 522.414 506.384
Span vertical proj. [m] -9.4 Wave time 5 [seg] 13.53 13.8 14.07 14.34 14.6 14.87 15.14 15.4 15.66 15.92 16.17
Between structures 176 - 177 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 162 Middle span sag [m] 2.24 2.33 2.42 2.52 2.61 2.71 2.81 2.91 3 3.1 3.2
Span length [m] 172.35 Horiz. Tension [kg] 722.98 694.887 668.517 643.871 620.373 598.023 577.398 557.92 539.593 522.414 506.384
Span vertical proj. [m] -0.24 Wave time 5 [seg] 13.52 13.79 14.06 14.33 14.6 14.87 15.13 15.39 15.65 15.91 16.16
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 94 of 108

Between structures 177 - 178 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50


Ruling span [m] 162 Middle span sag [m] 1.94 2.01 2.09 2.17 2.26 2.34 2.42 2.51 2.59 2.68 2.76
Span length [m] 159.94 Horiz. Tension [kg] 722.98 694.887 668.517 643.871 620.373 598.023 577.398 557.92 539.593 522.414 506.384
Span vertical proj. [m] -10.44 Wave time 5 [seg] 12.56 12.81 13.06 13.31 13.56 13.81 14.05 14.3 14.54 14.78 15.01
Between structures 178 - 179 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 162 Middle span sag [m] 0.75 0.78 0.82 0.85 0.88 0.91 0.94 0.98 1.01 1.04 1.08
Span length [m] 99.96 Horiz. Tension [kg] 722.98 694.887 668.517 643.871 620.373 598.023 577.398 557.92 539.593 522.414 506.384
Span vertical proj. [m] 1.94 Wave time 5 [seg] 7.84 8 8.15 8.31 8.46 8.62 8.77 8.93 9.08 9.22 9.37
Between structures 179 - 180 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 162 Middle span sag [m] 1.48 1.54 1.6 1.66 1.72 1.79 1.85 1.92 1.98 2.05 2.11
Span length [m] 139.93 Horiz. Tension [kg] 722.98 694.887 668.517 643.871 620.373 598.023 577.398 557.92 539.593 522.414 506.384
Span vertical proj. [m] 1.41 Wave time 5 [seg] 10.98 11.2 11.41 11.63 11.85 12.07 12.28 12.5 12.71 12.91 13.12
Between structures 180 - 181 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 162 Middle span sag [m] 2.36 2.46 2.56 2.66 2.76 2.86 2.96 3.06 3.17 3.27 3.38
Span length [m] 176.95 Horiz. Tension [kg] 722.98 694.887 668.517 643.871 620.373 598.023 577.398 557.92 539.593 522.414 506.384
Span vertical proj. [m] -5.93 Wave time 5 [seg] 13.88 14.16 14.44 14.71 14.99 15.27 15.54 15.81 16.07 16.34 16.59
Between structures 181 - 182 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 162 Middle span sag [m] 2.26 2.35 2.45 2.54 2.64 2.73 2.83 2.93 3.03 3.13 3.23
Span length [m] 172.92 Horiz. Tension [kg] 722.98 694.887 668.517 643.871 620.373 598.023 577.398 557.92 539.593 522.414 506.384
Span vertical proj. [m] 10.55 Wave time 5 [seg] 13.58 13.85 14.12 14.39 14.66 14.93 15.19 15.46 15.72 15.97 16.22
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 95 of 108

SECTION #36 OPGW AT FINAL CONDITION


Between structures 182 - 183 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 191.21 Middle span sag [m] 4.12 4.25 4.39 4.53 4.67 4.81 4.95 5.08 5.22 5.36 5.5
Span length [m] 228.77 Horiz. Tension [kg] 694.059 671.708 650.506 631.027 612.122 594.367 577.76 562.015 547.133 533.112 519.953
Span vertical proj. [m] 1.69 Wave time 5 [seg] 18.32 18.62 18.92 19.21 19.51 19.8 20.08 20.36 20.63 20.9 21.17
Between structures 183 - 184 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 191.21 Middle span sag [m] 2.41 2.49 2.57 2.65 2.73 2.81 2.89 2.97 3.05 3.13 3.21
Span length [m] 174.91 Horiz. Tension [kg] 694.059 671.708 650.506 631.027 612.122 594.367 577.76 562.015 547.133 533.112 519.953
Span vertical proj. [m] -0.24 Wave time 5 [seg] 14 14.23 14.47 14.69 14.91 15.13 15.35 15.56 15.77 15.98 16.18
Between structures 184 - 185 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 191.21 Middle span sag [m] 2.02 2.08 2.15 2.22 2.29 2.36 2.42 2.49 2.56 2.63 2.69
Span length [m] 159.96 Horiz. Tension [kg] 694.059 671.708 650.506 631.027 612.122 594.367 577.76 562.015 547.133 533.112 519.953
Span vertical proj. [m] 12.13 Wave time 5 [seg] 12.82 13.04 13.25 13.45 13.66 13.86 14.06 14.25 14.44 14.63 14.82
Between structures 185 - 186 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 191.21 Middle span sag [m] 2.55 2.64 2.72 2.81 2.89 2.98 3.06 3.15 3.24 3.32 3.41
Span length [m] 179.92 Horiz. Tension [kg] 694.059 671.708 650.506 631.027 612.122 594.367 577.76 562.015 547.133 533.112 519.953
Span vertical proj. [m] 11.75 Wave time 5 [seg] 14.42 14.66 14.9 15.12 15.36 15.58 15.81 16.03 16.24 16.46 16.66

SECTION #37 OPGW AT FINAL CONDITION


Between structures 186 - 186-A Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 148.29 Middle span sag [m] 1.94 2.02 2.1 2.18 2.26 2.34 2.42 2.5 2.59 2.67 2.75
Span length [m] 148.37 Horiz. Tension [kg] 620.726 596.081 573.733 552.533 532.483 513.582 496.405 480.089 464.922 450.904 437.461
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 96 of 108

Span vertical proj. [m] 4.91 Wave time 5 [seg] 12.56 12.82 13.07 13.32 13.57 13.81 14.05 14.29 14.52 14.74 14.97

SECTION #38 OPGW AT FINAL CONDITION


186-A -
Between structures Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
NE187
Ruling span [m] 208.44 Middle span sag [m] 0.21 0.21 0.21 0.22 0.22 0.23 0.23 0.23 0.24 0.24 0.24
Span length [m] 42.64 Horiz. Tension [kg] 481.905 472.624 463.917 455.642 447.511 439.954 432.541 425.56 418.865 412.459 406.196
Span vertical proj.
0.02 Wave time 5 [seg] 4.1 4.14 4.17 4.21 4.25 4.29 4.32 4.36 4.39 4.43 4.46
[m]
Between structures NE187 - 189 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 208.44 Middle span sag [m] 5.81 5.93 6.04 6.15 6.26 6.37 6.48 6.58 6.69 6.79 6.9
Span length [m] 226.47 Horiz. Tension [kg] 481.905 472.624 463.917 455.642 447.511 439.954 432.541 425.56 418.865 412.459 406.196
Span vertical proj.
-2.32 Wave time 5 [seg] 21.77 21.98 22.19 22.39 22.59 22.78 22.98 23.17 23.35 23.53 23.71
[m]

SECTION #39 OPGW AT FINAL CONDITION


Between structures 189 - 190 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 152.7 Middle span sag [m] 2.95 3.05 3.16 3.26 3.36 3.46 3.57 3.67 3.77 3.87 3.96
Span length [m] 169.93 Horiz. Tension [kg] 535.025 516.698 499.808 484.066 469.187 455.456 442.3 430.293 418.86 408.003 398.007
Span vertical proj. [m] -6.08 Wave time 5 [seg] 15.5 15.77 16.04 16.3 16.55 16.8 17.05 17.29 17.52 17.75 17.98
Between structures 190 - 191 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 152.7 Middle span sag [m] 2.15 2.22 2.3 2.37 2.45 2.52 2.6 2.67 2.74 2.81 2.88
Span length [m] 144.95 Horiz. Tension [kg] 535.025 516.698 499.808 484.066 469.187 455.456 442.3 430.293 418.86 408.003 398.007
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 97 of 108

Span vertical proj. [m] -6.59 Wave time 5 [seg] 13.22 13.46 13.68 13.9 14.12 14.33 14.55 14.75 14.95 15.15 15.33
Between structures 191 - 192 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 152.7 Middle span sag [m] 2.14 2.22 2.29 2.37 2.44 2.52 2.59 2.67 2.74 2.81 2.88
Span length [m] 144.96 Horiz. Tension [kg] 535.025 516.698 499.808 484.066 469.187 455.456 442.3 430.293 418.86 408.003 398.007
Span vertical proj. [m] -1.75 Wave time 5 [seg] 13.22 13.45 13.68 13.9 14.12 14.33 14.54 14.74 14.94 15.14 15.33
Between structures 192 - 200 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 152.7 Middle span sag [m] 2.2 2.27 2.35 2.43 2.5 2.58 2.66 2.73 2.81 2.88 2.95
Span length [m] 146.71 Horiz. Tension [kg] 535.025 516.698 499.808 484.066 469.187 455.456 442.3 430.293 418.86 408.003 398.007
Span vertical proj. [m] 0.52 Wave time 5 [seg] 13.38 13.61 13.84 14.06 14.29 14.5 14.71 14.92 15.12 15.32 15.51

SECTION #40 OPGW AT FINAL CONDITION


Between structures 200 - 201 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 114.96 Middle span sag [m] 1.49 1.55 1.62 1.69 1.76 1.83 1.9 1.97 2.03 2.1 2.17
Span length [m] 115.05 Horiz. Tension [kg] 486.387 465.191 445.143 427.106 410.219 394.768 380.752 367.599 355.309 344.167 333.599
Span vertical proj. [m] -4.3 Wave time 5 [seg] 11.01 11.25 11.51 11.75 11.99 12.22 12.44 12.66 12.88 13.09 13.29
Between structures 201 - 202 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 114.96 Middle span sag [m] 1.48 1.55 1.62 1.69 1.76 1.83 1.9 1.96 2.03 2.1 2.16
Span length [m] 114.99 Horiz. Tension [kg] 486.387 465.191 445.143 427.106 410.219 394.768 380.752 367.599 355.309 344.167 333.599
Span vertical proj. [m] -3.08 Wave time 5 [seg] 11 11.25 11.5 11.74 11.98 12.21 12.43 12.65 12.87 13.08 13.28
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 98 of 108

SECTION #41 OPGW AT FINAL CONDITION


Between structures 202 - 203 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 117.95 Middle span sag [m] 1.3 1.36 1.43 1.49 1.56 1.63 1.69 1.76 1.83 1.89 1.96
Span length [m] 115.03 Horiz. Tension [kg] 555.93 530.137 506.068 484.298 463.675 444.202 427.027 410.714 395.837 381.821 369.243
Span vertical proj. [m] 2.94 Wave time 5 [seg] 10.29 10.54 10.79 11.03 11.27 11.51 11.74 11.97 12.2 12.42 12.63
Between structures 203 - 204 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 117.95 Middle span sag [m] 1.3 1.36 1.43 1.49 1.56 1.63 1.69 1.76 1.82 1.89 1.96
Span length [m] 114.98 Horiz. Tension [kg] 555.93 530.137 506.068 484.298 463.675 444.202 427.027 410.714 395.837 381.821 369.243
Span vertical proj. [m] 4.76 Wave time 5 [seg] 10.29 10.54 10.78 11.02 11.27 11.51 11.74 11.97 12.2 12.42 12.63
Between structures 204 - 205 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 117.95 Middle span sag [m] 1.25 1.31 1.37 1.43 1.49 1.56 1.62 1.69 1.75 1.82 1.88
Span length [m] 112.67 Horiz. Tension [kg] 555.93 530.137 506.068 484.298 463.675 444.202 427.027 410.714 395.837 381.821 369.243
Span vertical proj. [m] 3.27 Wave time 5 [seg] 10.08 10.32 10.57 10.8 11.04 11.28 11.5 11.73 11.95 12.16 12.37
Between structures 205 - 206 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 117.95 Middle span sag [m] 1.6 1.68 1.76 1.84 1.92 2.01 2.09 2.17 2.25 2.33 2.41
Span length [m] 127.69 Horiz. Tension [kg] 555.93 530.137 506.068 484.298 463.675 444.202 427.027 410.714 395.837 381.821 369.243
Span vertical proj. [m] 6.41 Wave time 5 [seg] 11.43 11.7 11.98 12.25 12.52 12.79 13.04 13.3 13.55 13.79 14.03
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 99 of 108

SECTION #42 OPGW AT FINAL CONDITION


Between structures 206 - 207 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.99 Middle span sag [m] 1.9 1.96 2.02 2.08 2.15 2.21 2.27 2.32 2.38 2.44 2.5
Span length [m] 127.63 Horiz. Tension [kg] 468.949 454.07 440.053 426.897 414.603 403.172 392.602 382.608 373.044 364.055 355.784
Span vertical proj. [m] 2.93 Wave time 5 [seg] 12.43 12.64 12.84 13.03 13.22 13.41 13.59 13.77 13.94 14.11 14.28
Between structures 207 - 208 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.99 Middle span sag [m] 2.62 2.71 2.79 2.88 2.97 3.05 3.13 3.21 3.3 3.38 3.46
Span length [m] 149.99 Horiz. Tension [kg] 468.949 454.07 440.053 426.897 414.603 403.172 392.602 382.608 373.044 364.055 355.784
Span vertical proj. [m] 6.6 Wave time 5 [seg] 14.62 14.86 15.09 15.32 15.55 15.77 15.98 16.18 16.39 16.59 16.78
Between structures 208 - 209 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.99 Middle span sag [m] 2.46 2.54 2.62 2.7 2.78 2.86 2.94 3.01 3.09 3.17 3.24
Span length [m] 145.27 Horiz. Tension [kg] 468.949 454.07 440.053 426.897 414.603 403.172 392.602 382.608 373.044 364.055 355.784
Span vertical proj. [m] 5.98 Wave time 5 [seg] 14.16 14.39 14.61 14.84 15.06 15.27 15.47 15.67 15.87 16.07 16.25
Between structures 209 - 210 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.99 Middle span sag [m] 2.62 2.71 2.8 2.88 2.97 3.05 3.14 3.22 3.3 3.38 3.46
Span length [m] 150.07 Horiz. Tension [kg] 468.949 454.07 440.053 426.897 414.603 403.172 392.602 382.608 373.044 364.055 355.784
Span vertical proj. [m] 7.39 Wave time 5 [seg] 14.63 14.86 15.1 15.33 15.56 15.78 15.99 16.19 16.4 16.6 16.79

SECTION #43 OPGW AT FINAL CONDITION


Between structures 210 - 211 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.48 Middle span sag [m] 1.5 1.56 1.64 1.71 1.78 1.85 1.93 2 2.07 2.15 2.22
Span length [m] 126.96 Horiz. Tension [kg] 588.646 562.853 538.209 515.863 494.666 475.192 456.866 440.265 424.812 410.222 396.781
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 100 of 108

Span vertical proj. [m] 6.6 Wave time 5 [seg] 11.04 11.29 11.55 11.8 12.05 12.29 12.54 12.77 13 13.23 13.45
Between structures 211 - 212 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.48 Middle span sag [m] 1.5 1.57 1.64 1.71 1.78 1.85 1.93 2 2.07 2.15 2.22
Span length [m] 126.99 Horiz. Tension [kg] 588.646 562.853 538.209 515.863 494.666 475.192 456.866 440.265 424.812 410.222 396.781
Span vertical proj. [m] 5.84 Wave time 5 [seg] 11.05 11.3 11.55 11.8 12.05 12.29 12.54 12.77 13 13.23 13.46
Between structures 212 - 213 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.48 Middle span sag [m] 1.5 1.57 1.64 1.71 1.78 1.86 1.93 2 2.08 2.15 2.22
Span length [m] 127 Horiz. Tension [kg] 588.646 562.853 538.209 515.863 494.666 475.192 456.866 440.265 424.812 410.222 396.781
Span vertical proj. [m] 7.29 Wave time 5 [seg] 11.05 11.3 11.56 11.8 12.05 12.3 12.54 12.78 13.01 13.24 13.46
Between structures 213 - 214 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.48 Middle span sag [m] 1.5 1.57 1.64 1.71 1.78 1.86 1.93 2 2.08 2.15 2.22
Span length [m] 126.99 Horiz. Tension [kg] 588.646 562.853 538.209 515.863 494.666 475.192 456.866 440.265 424.812 410.222 396.781
Span vertical proj. [m] 7.95 Wave time 5 [seg] 11.05 11.3 11.56 11.8 12.05 12.3 12.54 12.78 13.01 13.24 13.46
Between structures 214 - 215 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.48 Middle span sag [m] 1.4 1.47 1.54 1.6 1.67 1.74 1.81 1.88 1.95 2.02 2.08
Span length [m] 122.85 Horiz. Tension [kg] 588.646 562.853 538.209 515.863 494.666 475.192 456.866 440.265 424.812 410.222 396.781
Span vertical proj. [m] 10.84 Wave time 5 [seg] 10.7 10.94 11.19 11.43 11.67 11.91 12.15 12.37 12.6 12.82 13.03
Between structures 215 - 216 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 127.48 Middle span sag [m] 1.68 1.75 1.84 1.91 2 2.08 2.16 2.24 2.33 2.41 2.49
Span length [m] 134.51 Horiz. Tension [kg] 588.646 562.853 538.209 515.863 494.666 475.192 456.866 440.265 424.812 410.222 396.781
Span vertical proj. [m] 3.5 Wave time 5 [seg] 11.69 11.96 12.23 12.49 12.76 13.02 13.28 13.52 13.77 14.01 14.25
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 101 of 108

SECTION #44 OPGW AT FINAL CONDITION


Between structures 216 - 217 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 134.53 Middle span sag [m] 2.46 2.55 2.64 2.73 2.82 2.91 3 3.08 3.17 3.26 3.34
Span length [m] 146.01 Horiz. Tension [kg] 474.192 457.014 441.562 426.97 413.529 400.949 389.23 378.374 368.093 358.386 349.398
Span vertical proj. [m] 10.73 Wave time 5 [seg] 14.16 14.43 14.68 14.93 15.17 15.4 15.63 15.86 16.08 16.29 16.5
Between structures 217 - 218 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 134.53 Middle span sag [m] 2.48 2.57 2.66 2.75 2.84 2.93 3.02 3.11 3.19 3.28 3.37
Span length [m] 146.55 Horiz. Tension [kg] 474.192 457.014 441.562 426.97 413.529 400.949 389.23 378.374 368.093 358.386 349.398
Span vertical proj. [m] 11.11 Wave time 5 [seg] 14.22 14.48 14.73 14.98 15.22 15.46 15.69 15.92 16.14 16.35 16.56
Between structures 218 - 219 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 134.53 Middle span sag [m] 0.8 0.83 0.86 0.88 0.91 0.94 0.97 1 1.03 1.05 1.08
Span length [m] 83.13 Horiz. Tension [kg] 474.192 457.014 441.562 426.97 413.529 400.949 389.23 378.374 368.093 358.386 349.398
Span vertical proj. [m] 4.13 Wave time 5 [seg] 8.06 8.21 8.35 8.49 8.63 8.76 8.89 9.02 9.14 9.27 9.39

SECTION #45 OPGW AT FINAL CONDITION


Between structures 219 - 220 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.73 Middle span sag [m] 1.99 2.06 2.13 2.19 2.26 2.32 2.38 2.45 2.51 2.57 2.63
Span length [m] 130.77 Horiz. Tension [kg] 469.239 454.071 440.055 426.899 414.606 403.174 392.604 382.322 372.902 364.057 355.498
Span vertical proj. [m] 9.56 Wave time 5 [seg] 12.75 12.96 13.17 13.37 13.57 13.76 13.94 14.13 14.3 14.48 14.65
Between structures 220 - 221 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.73 Middle span sag [m] 1.99 2.06 2.12 2.19 2.25 2.32 2.38 2.44 2.5 2.56 2.63
Span length [m] 130.73 Horiz. Tension [kg] 469.239 454.071 440.055 426.899 414.606 403.174 392.604 382.322 372.902 364.057 355.498
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 102 of 108

Span vertical proj. [m] 5.16 Wave time 5 [seg] 12.73 12.95 13.15 13.35 13.55 13.74 13.92 14.11 14.29 14.46 14.63
Between structures 221 - 222 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.73 Middle span sag [m] 1.99 2.06 2.12 2.19 2.26 2.32 2.38 2.45 2.51 2.57 2.63
Span length [m] 130.78 Horiz. Tension [kg] 469.239 454.071 440.055 426.899 414.606 403.174 392.604 382.322 372.902 364.057 355.498
Span vertical proj. [m] 7.48 Wave time 5 [seg] 12.74 12.96 13.16 13.36 13.56 13.75 13.93 14.12 14.3 14.47 14.64
Between structures 222 - 223 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.73 Middle span sag [m] 2.9 3 3.1 3.19 3.29 3.38 3.47 3.56 3.65 3.74 3.83
Span length [m] 157.72 Horiz. Tension [kg] 469.239 454.071 440.055 426.899 414.606 403.174 392.604 382.322 372.902 364.057 355.498
Span vertical proj. [m] 12.29 Wave time 5 [seg] 15.38 15.64 15.88 16.13 16.37 16.6 16.82 17.04 17.26 17.47 17.68
Between structures 223 - 224 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.73 Middle span sag [m] 2.9 2.99 3.09 3.18 3.28 3.37 3.46 3.56 3.65 3.73 3.82
Span length [m] 157.76 Horiz. Tension [kg] 469.239 454.071 440.055 426.899 414.606 403.174 392.604 382.322 372.902 364.057 355.498
Span vertical proj. [m] 3.92 Wave time 5 [seg] 15.36 15.62 15.87 16.11 16.35 16.58 16.8 17.02 17.24 17.45 17.66
Between structures 224 - 225 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 143.73 Middle span sag [m] 2.52 2.61 2.69 2.77 2.85 2.93 3.01 3.09 3.17 3.25 3.33
Span length [m] 146.94 Horiz. Tension [kg] 469.239 454.071 440.055 426.899 414.606 403.174 392.604 382.322 372.902 364.057 355.498
Span vertical proj. [m] 12.7 Wave time 5 [seg] 14.33 14.57 14.8 15.03 15.25 15.47 15.67 15.88 16.08 16.28 16.47

SECTION #46 OPGW AT FINAL CONDITION


Between structures 225 - 226 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 120.74 Middle span sag [m] 2.48 2.59 2.69 2.8 2.91 3.01 3.12 3.22 3.33 3.43 3.53
Span length [m] 147.94 Horiz. Tension [kg] 482.329 462.281 443.956 427.068 411.329 397.027 383.299 371.007 359.291 348.723 338.73
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 103 of 108

Span vertical proj. [m] 7.09 Wave time 5 [seg] 14.22 14.52 14.82 15.11 15.4 15.67 15.95 16.21 16.47 16.72 16.97
Between structures 226 - 227 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 120.74 Middle span sag [m] 1.02 1.06 1.11 1.15 1.19 1.24 1.28 1.32 1.37 1.41 1.45
Span length [m] 94.76 Horiz. Tension [kg] 482.329 462.281 443.956 427.068 411.329 397.027 383.299 371.007 359.291 348.723 338.73
Span vertical proj. [m] 7.02 Wave time 5 [seg] 9.11 9.31 9.5 9.68 9.87 10.04 10.22 10.39 10.56 10.72 10.87
Between structures 227 - 228 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 120.74 Middle span sag [m] 1.02 1.06 1.11 1.15 1.2 1.24 1.28 1.33 1.37 1.41 1.45
Span length [m] 94.81 Horiz. Tension [kg] 482.329 462.281 443.956 427.068 411.329 397.027 383.299 371.007 359.291 348.723 338.73
Span vertical proj. [m] 8.17 Wave time 5 [seg] 9.12 9.32 9.51 9.69 9.88 10.05 10.23 10.4 10.57 10.73 10.89

SECTION #47 OPGW AT FINAL CONDITION


Between structures 228 - 229 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 122.89 Middle span sag [m] 1.3 1.37 1.44 1.51 1.59 1.66 1.74 1.83 1.91 1.99 2.08
Span length [m] 133.92 Horiz. Tension [kg] 751.899 715.768 681.36 648.675 617.713 589.048 562.107 536.889 513.393 491.622 471.574
Span vertical proj. [m] 8.26 Wave time 5 [seg] 10.31 10.57 10.83 11.1 11.38 11.65 11.93 12.2 12.48 12.75 13.02
Between structures 229 - 230 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 122.89 Middle span sag [m] 1.5 1.58 1.66 1.74 1.83 1.92 2.01 2.1 2.2 2.3 2.39
Span length [m] 143.65 Horiz. Tension [kg] 751.899 715.768 681.36 648.675 617.713 589.048 562.107 536.889 513.393 491.622 471.574
Span vertical proj. [m] 8.49 Wave time 5 [seg] 11.06 11.33 11.62 11.91 12.2 12.49 12.79 13.09 13.38 13.68 13.97
Between structures 230 - 231 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 122.89 Middle span sag [m] 0.61 0.65 0.68 0.71 0.75 0.78 0.82 0.86 0.9 0.94 0.98
Span length [m] 91.94 Horiz. Tension [kg] 751.899 715.768 681.36 648.675 617.713 589.048 562.107 536.889 513.393 491.622 471.574
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 104 of 108

Span vertical proj. [m] 4.18 Wave time 5 [seg] 7.08 7.25 7.43 7.62 7.81 7.99 8.18 8.37 8.56 8.75 8.93
Between structures 231 - 232 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 122.89 Middle span sag [m] 0.73 0.77 0.81 0.85 0.89 0.93 0.98 1.02 1.07 1.12 1.17
Span length [m] 100.27 Horiz. Tension [kg] 751.899 715.768 681.36 648.675 617.713 589.048 562.107 536.889 513.393 491.622 471.574
Span vertical proj. [m] 7.3 Wave time 5 [seg] 7.72 7.91 8.11 8.31 8.52 8.73 8.93 9.14 9.35 9.55 9.75
Between structures 232 - 233 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 122.89 Middle span sag [m] 1.08 1.14 1.2 1.26 1.32 1.38 1.45 1.52 1.59 1.66 1.73
Span length [m] 122.08 Horiz. Tension [kg] 751.899 715.768 681.36 648.675 617.713 589.048 562.107 536.889 513.393 491.622 471.574
Span vertical proj. [m] 7.16 Wave time 5 [seg] 9.4 9.63 9.87 10.12 10.37 10.62 10.87 11.12 11.37 11.62 11.87

SECTION #48 OPGW AT FINAL CONDITION


Between structures 233 - 234 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 121.13 Middle span sag [m] 1.67 1.75 1.82 1.89 1.96 2.03 2.1 2.17 2.25 2.31 2.38
Span length [m] 121.46 Horiz. Tension [kg] 482.327 462.278 443.954 427.354 411.327 397.024 383.583 371.292 359.575 349.007 339.014
Span vertical proj. [m] 8.95 Wave time 5 [seg] 11.68 11.93 12.17 12.41 12.65 12.87 13.1 13.31 13.53 13.73 13.93

SECTION #49 OPGW AT FINAL CONDITION


Between structures 234 - 235 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 128.11 Middle span sag [m] 1.19 1.25 1.31 1.37 1.44 1.51 1.58 1.65 1.72 1.8 1.87
Span length [m] 128.66 Horiz. Tension [kg] 762.223 726.092 692.257 660.146 629.758 601.093 574.726 549.508 526.012 504.24 484.192
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 105 of 108

Span vertical proj. [m] 11.97 Wave time 5 [seg] 9.85 10.09 10.34 10.58 10.84 11.09 11.34 11.6 11.86 12.11 12.36

SECTION #50 OPGW AT FINAL CONDITION


Between structures 235 - 236 Temperature [ºC] 0 5 10 15 20 25 30 35 40 45 50
Ruling span [m] 113.97 Middle span sag [m] 1.36 1.43 1.5 1.57 1.64 1.71 1.77 1.84 1.91 1.98 2.05
Span length [m] 114.26 Horiz. Tension [kg] 523.758 499.116 476.771 455.574 436.676 418.927 402.614 387.45 373.722 360.856 349.141
Span vertical proj. [m] 8.21 Wave time 5 [seg] 10.54 10.8 11.05 11.31 11.55 11.79 12.03 12.26 12.48 12.7 12.92
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 106 of 108

APPENDIX A
SUPPORTING STRUCTURES OUTLINES AND DIMENSIONS
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 107 of 108
DESALINATED WATER SUPPLY FOR
SPENCE GROWTH OPTIONS PROJECT

OPGW STRINGING CHART REPORT


Doc. SGO-NPIW-EXE-PSP-EFG-00201
Rev. 0 Date: 24/04/19
Page 108 of 108

You might also like