Download as pdf or txt
Download as pdf or txt
You are on page 1of 43

WATER ENGINEERING

SOLUTIONS FOR A
BETTER TOMORROW

Mirmas Holding | Company Profile | All Rights Reserved 2019


DISCLAIMER

This document was prepared exclusively for the benefit and internal use of the recipient of this document and does not
carry any rights to reproduce any part of this document to any party. This document is preliminary in nature, and is
incomplete without any proper reference to, and should be viewed solely in conjunction with, the oral briefing
provided by Mirmas Holding Sdn Bhd (“Mirmas”) and/or any of its subsidiaries, associated and related companies. No
part of this document may be reproduced or copied in any form or by any means without prior written
permission/consent of Mirmas. Accordingly, Mirmas accepts no liability whatsoever to any third party who chooses to
rely on this document or for the actions of any third party in this respect.

In preparing this document, Mirmas has assumed that all the information in all publicly available sources is accurate
and reasonable. Such information has not been independently verified by Mirmas. No warranty or representation,
expressed or implied, is made with respect to the information set out in this document (including the results and
interpretation obtained therefrom) and it should not be relied upon as such. Accordingly, in no event whatsoever shall
Mirmas be responsible to the recipient or to anyone else for any direct, indirect, special or consequential losses or
damages that may arise from the use of, or reliance on this document, including loss of profits or goodwill even where
the possibility of the same have been advised.

This document is based on regulations and guidelines currently in force which are subject to changes from time to time.
If the time for the implementation of our recommendation extends into the future, Mirmas findings and
recommendations may not necessarily apply due to changing business and regulatory conditions. Accordingly,
continuous discussions with Mirmas are required, especially prior to any implementation of our recommendations,
in order to confirm its appropriateness.

2
Private & Confidential | All Rights Reserved | Copyright 2019
BUILDING BLOCKS
OF MIRMAS
BRIEF INTRODUCTION

Mirmas Holding Sdn Bhd (“Mirmas” or the “Company”) is a Malaysian incorporated firm aspiring to
provide its clients with innovative and holistic solutions in the water, wastewater and energy sector. Our
services are relationship-driven, and tailored to meet our clients’ needs.

Mirmas is principally involved in three key sectors: (i) Engineering, Procurement, Construction and
Commissioning (“EPCC”); (ii) Operating and Maintenance (“O&M”) for utilities; and (iii) Procurement of
Water and Renewable Energy Technologies.

The Company is the principal partner to and key distributor of SUEZ Water Technologies & Solutions
(Water and Waste Water solutions).

Through its subsidiaries and related companies, Mirmas is involved in several other sectors such as
O&M of turbines and tubular equipment, technical consultancy for design and process specializing in
various industries, technical and engineering design consultancy, property development and ticketing,
room bookings and travel packages.

As an integrated water solution provider, Mirmas is committed and focused in providing technology
solutions to its prospective clients in the energy, infrastructure and utilities sector.

4
Private & Confidential | All Rights Reserved | Copyright 2019
VISION AND MISSION

OUR VISION
▪ To be a leading holistic solutions provider in the water and energy sector.

OUR MISSION
▪ To deliver holistic water, wastewater, renewable energy solutions within the
ASEAN Region;
▪ To successfully deliver our services both in infrastructure development and
operating & maintenance services; and
▪ To deliver equitable returns to our clientele.

5
Private & Confidential | All Rights Reserved | Copyright 2019
GROUP STRUCTURE

Fask Capital Sdn Datuk Awalan Bin Dato’ Mat Noor Bin Amirul Afif Bin Abd
Bhd Abdul Aziz Nawi Aziz
35% 35% 10% 20%

Water & Waste Property Division Advisory Division Travel Division IT Division
Water Division

KAJV

WATER

6
Private & Confidential | All Rights Reserved | Copyright 2019
FULL-SERVICE PROVIDER DELIVERING ACROSS
THE VALUE CHAIN

SOLUTIONS & DELIVERY


TECHNOLOGIES
SERVICES MODELS

Equipment Specialty Engineering,


and chemicals Lifecycle procurement,
systems and expert services construction
services

Water Water
quality Data services
monitoring intelligence (BOO, O&M,
for asset mobile units)
performance

7
Private & Confidential | All Rights Reserved | Copyright 2019
LICENSES AND PERMITS (1/2)
No Name of Licenses Type/Grade License Holders

1. ISO 9001:2015 – Quality Management System Certified by SIRIM and UKAS Mirmas Holding Sdn Bhd

2. Suruhanjaya Perkhidmatan Air Negara (SPAN) IPA C1 & C2 (Water Supply) Mirmas Holding Sdn Bhd
G7 (B04, CE20, CE21, E03, E06,
3. CIDB Malaysia E10, E11, E16, E17, E21, M15, M19, Mirmas Holding Sdn Bhd
M20, M23) with 3 Star Score
4. Ministry of Finance (MoF) Company Registration Mirmas Holding Sdn Bhd
5. Suruhanjaya Perkhidmatan Air Negara (SPAN) IPA C1 (Water Supply) Konsortium Amanie JV Sdn Bhd
6. CIDB Malaysia G7 (B04, CE21, M15) Konsortium Amanie JV Sdn Bhd

8
Private & Confidential | All Rights Reserved | Copyright 2019
LICENSES AND PERMITS (2/2)

9
Private & Confidential | All Rights Reserved | Copyright 2019
PRODUCT AND SERVICES (1/2)

Supply of Equipment
▪ Membranes O&M of Sewerage and
O&M for Project Management
▪ Bioreactor Waste Water
Water Assets Consultancy
▪ Intake & Pumps Treatment Plants
▪ PV Solar Panels

Note: The graphics above are for illustration purposes only and may not represent actual activities carried out by Mirmas.
10
Private & Confidential | All Rights Reserved | Copyright 2019
PRODUCT AND SERVICES (2/2)

KAJV WATER
Development of Water
Treatment Plant, Operations & Water
Property
Retrofitting Maintenance for Energy Travel Agency Reclamations Plant
& other and Utilities
Development
works (WRP)

Note: The graphics above are for illustration purposes only and may not represent actual activities carried out by Mirmas subsidiaries.

11
Private & Confidential | All Rights Reserved | Copyright 2019
PARTNERSHIPS & COLLABORATIONS

Company Name Product and Services Partners

SUEZ Water • Wastewater Treatment Mirmas Holding Sdn Bhd


Technologies & • Anaerobic Technologies
Solutions • Ultrafiltration and Membrane Bioreactor
• Mobile Water Treatment System
• Reverse Osmosis Technologies

12
Private & Confidential | All Rights Reserved | Copyright 2019
MEET THE
PLAYERS
KEY MANAGEMENT TEAM (1/7)

CHAIRMAN Since 2015, Datuk Mat Noor Bin Nawi (“DM”) has been the Chairman of Mirmas
Holding Sdn Bhd. He is also the Chairman of EXIM Bank Malaysia, effective since
1st October 2015.
Dato’ Mat Noor
Bin Nawi He began his profession in 1983 as an Administrative and Diplomatic Officer within
the Economic Planning Unit (“EPU”) of Malaysia. During his 29 years period with
the EPU, his profession has developed up to Deputy Director 1 and contributed most
of his working experiences to EPU. In 2011, DM was appointed as Deputy
Secretary General (Systems & Controls) and in the subsequent year, he was
appointed as Deputy Secretary General (Policy) under Ministry of Finance (MoF),
which he continued to serve as until 2015.

Between 2012 to 2015, DM was also the Chairman of Bank Kerjasama Rakyat
Malaysia Berhad (Bank Rakyat), DanaInfra Nasional Berhad and Malaysian
Development Holdings Sdn Bhd.

DM holds a Master of Science in Economic Policy from the University of Illinois, Urbana-
Champaign, United States of America and a Bachelor of Science Degree in
Economic Resource from Universiti Putra Malaysia.

14
Private & Confidential | All Rights Reserved | Copyright 2019
KEY MANAGEMENT TEAM (2/7)

Datuk Awalan ("DA") is a director and shareholder of Mirmas Holding Sdn Bhd.
EXECUTIVE Currently he is the Executive Chairman of Komconsult Sdn Bhd and Managing
DEPUTY Director of Success Circle Group of Companies. DA is also the Chairman of the Board
CHAIRMAN of Directors of Success Diar Sdn Bhd, a joint venture company between Qatari Diar
Real Estate Investment Company (wholly owned by Qatar Investment Authority)
and Eclipse Portfolio Sdn Bhd.
Datuk Awalan Bin
Abdul Aziz DA is also the Executive Chairman of Strovi Tel Sdn Bhd, a bio-medical company
which had a Contract Manufacturing Agreement for Plasma Fractionation with the
Government of Malaysia.

Prior to that, DA was the Managing Director of Solsis (M) Sdn Bhd and Senior Vice
President of Dataprep Holdings Berhad (2005-2008) and was a General Manager of
Perbadanan Nasional Berhad.

DA holds a Masters of Business Administration from Cambridge Institute of


Management, United Kingdom.

15
Private & Confidential | All Rights Reserved | Copyright 2019
KEY MANAGEMENT TEAM (3/7)

Dato' Nik Mohd Amin (“DN”) is a prominent figure in the Malaysian banking industry.
DIRECTOR He currently holds the position as the director of Mirmas Holding Sdn Bhd.

Dato’ Nik Mod DN is also the founder of FASK Capital Sdn Bhd (formerly known as The Royal Mint
Amin Bin Nik Exchange Sdn Bhd). He currently also serves as a Non-Independent Director on the
Abd Majid Board of AWC Berhad.

DN was previously the CEO/Executive Director of Bank Simpanan Nasional. During


his tenure with Bank Simpanan Nasional, he re-engineered the bank’s business
direction towards assisting Small Medium Industries.

Prior to that, DN was also the General Manager of Perbadanan Usahawan Nasional
Berhad (“PUNB”), setting up the funds’ investment division. He also held key
positions in Maybank Berhad and Affin Bank Berhad executing risk management,
strategic planning, credit management, international banking roles in the respective
banks.

DN holds a Degree in Economics from the University of Malaya.

16
Private & Confidential | All Rights Reserved | Copyright 2019
KEY MANAGEMENT TEAM (4/7)

GROUP Amirul Afif ("AA") is the Group Executive Director (“ED”) of Mirmas Holding Sdn Bhd,
effective since 2015.
EXECUTIVE
DIRECTOR He has been extensively involved in Investment Banking, Project and Structured
Finance Advisory and Islamic Finance deals and transactions during his tenure with
Maybank Investment Bank, Kuwait Finance House (Malaysia) and Bumiwerks
Amirul Afif Bin
Capital Management and Cagamas Bhd.
Abd Aziz
AA has covered a wide range of sectors including privatization and financing of
government related projects, power plants, real estate, asset-backed securities
(CLOs, RMBS and non-performing loans), healthcare, aviation, renewable energy and
waste management.

AA holds a Bachelor of Commerce and Management, Lincoln University (NZ).

17
Private & Confidential | All Rights Reserved | Copyright 2019
KEY MANAGEMENT TEAM (5/7)

CHIEF Haji Johari (“HJ") is the Chief Operation Officer of Mirmas Holding Sdn Bhd,
effective since 2015. He also holds the position of Director in Ruang Project
OPERATING
Management Sdn Bhd.
OFFICER
He has vast experience in the area of project management and property development.
With a civil engineering background, he served as an engineer with the
Hj. Johari Bin
consultants and developers at beginning of his career. He previously worked with
Abu Hassan
Superb Management Sdn Bhd as its Managing Director until 2015.

He was also involved in the financial services industry through managing a few
property developments from the banking and corporate perspective by working with
Affin Bank Berhad’s associate company, Project Management Sdn Bhd. He observed
the implementation of the projects which are under the loan given by Affin Bank.

HJ holds a BSC. of Civil Engineering from the Utah State University, USA and a Dip.
in Civil Engineering, ITM. He is also licensed under The Institution of Engineers
Malaysia (IEM) and Board of Engineers Malaysia.

18
Private & Confidential | All Rights Reserved | Copyright 2019
KEY MANAGEMENT TEAM (6/7)

Ir. Abdul Samad Bin Sulaiman (“SS”) has joined Mirmas Holding Sdn Bhd since Jan
2019. He is an innovative and result-oriented Project Director with over 16 years of
PROJECT
experience and passion for building relationship and exceeding client and
IMPLEMENTATION,
management expectations.
DIRECTOR
SS has proven his success through the strategic planning, operation management
and maintenance of twelve (12) water treatment plants in the Northern Region of
Ir. Abdul Samad Selangor. The twelve (12) water treatment plants had a total treated water
Bin Sulaiman production capacity of 1,145,000 cu m and cost control of up to RM105 Million per
annum.

SS was also involved in managing the Capital Expenditures (Capex) of projects,


improving efficiency of operations, team building, and detailing project information
to determine effective process for operation, maintenance and system that optimizes
productivity bottom line.

SS is registered as a Professional Engineer with the Board of Engineers Malaysia


(BEM), a Member of The Institution of Engineers Malaysia (IEM) and also as an
Associate Asean Engineer (AAE) under the ASEAN Engineering Register.

19
Private & Confidential | All Rights Reserved | Copyright 2019
KEY MANAGEMENT TEAM (7/7)

COMMERCIAL Mohd Fuad Bin Helmy (“MF”) joined Mirmas Holding Sdn Bhd in February 2017. MF
ENGINEERING is an experienced engineer with a strong background in Design, Engineering and
MANAGER Management.

MF’s main scope of work is to ensure the streamlining of operations in the client’s
Mohd Fuad Bin projects through scope and objective development; preliminary project planning and
Helmy design, up to testing and commissioning.

MF was previously with Kejuruteraan Prestasi Teguh Sdn Bhd as a Project Manager,
focusing on valves service & maintenance and water hammer analysis for pumping
mains. Prior to that, he was employed by Kloberz Sdn Bhd as a Sales & Project Engineer
focusing mainly on membrane technologies.

MF graduated in 2010 from Curtin University, Western Australia majoring Chemical


Engineering. He is registered as a Professional Engineer with the Board Engineer
Malaysia (BEM), The Institution of Engineers Malaysia & The Institution of Engineers
Australia.

20
Private & Confidential | All Rights Reserved | Copyright 2019
MIRMAS’S
PROJECTS
WATER & WASTE WATER PROJECTS
PROJECTS

Development of 148 MLD, 44 MLD & 20 MLD Water Treatment Plants (“WTP”), retrofitting and
other related water works in Kuala Terengganu Utara.

Contract Awarder : State Government of Terengganu


Location : Kuala Terengganu Utara, Terengganu
~ MYR 1.2 Billion - June 2015 (Crisis Management : Emergency Water
Value & Year Awarded :
System)
Year Completed : May 2020
Scope of Work : Proposed design and build of 128 MLD and 28 MLD membrane water
treatment plant, service tank, installation of raw water and treated water pipes,
including retrofitting works and any other works related to it for the Proposed
North Terengganu Water Supply Scheme.

23
Private & Confidential | All Rights Reserved | Copyright 2019
CADANGAN MEREKABENTUK DAN MEMBINA LOJI AIR 120MLD DAN 28MLD MEMBRANE,
TANGKI SERVIS, PEMASANGAN PAIP AIR MENTAH DAN PAIP AIR BERSIH SERTA
RETROFITTING DAN LAIN-LAIN KERJA BERKAITAN BAGI CADANGAN SKIM BEKALAN AIR
KUALA TERENGGANU UTARA

PROJECT LOCATION & SITE PLAN

24
24
Private & Confidential | All Rights Reserved | Copyright 2019
CADANGAN MEREKABENTUK DAN MEMBINA LOJI AIR 120MLD DAN 28MLD MEMBRANE,
TANGKI SERVIS, PEMASANGAN PAIP AIR MENTAH DAN PAIP AIR BERSIH SERTA
RETROFITTING DAN LAIN-LAIN KERJA BERKAITAN BAGI CADANGAN SKIM BEKALAN AIR
KUALA TERENGGANU UTARA

Raw Water Pumping Main 1400 mm ND

25
Private & Confidential | All Rights Reserved | Copyright 2019
CADANGAN MEREKABENTUK DAN MEMBINA LOJI AIR 120MLD DAN 28MLD MEMBRANE,
TANGKI SERVIS, PEMASANGAN PAIP AIR MENTAH DAN PAIP AIR BERSIH SERTA
RETROFITTING DAN LAIN-LAIN KERJA BERKAITAN BAGI CADANGAN SKIM BEKALAN AIR
KUALA TERENGGANU UTARA

Rebar Preparation Works for 2nd Layer Hopper Area

26
Private & Confidential | All Rights Reserved | Copyright 2019
CADANGAN MEREKABENTUK DAN MEMBINA LOJI AIR 120MLD DAN 28MLD MEMBRANE,
TANGKI SERVIS, PEMASANGAN PAIP AIR MENTAH DAN PAIP AIR BERSIH SERTA
RETROFITTING DAN LAIN-LAIN KERJA BERKAITAN BAGI CADANGAN SKIM BEKALAN AIR
KUALA TERENGGANU UTARA

MISC Works

27
Private & Confidential | All Rights Reserved | Copyright 2019
PROJECTS

Development of 5 MLD Water Treatment Plants (“WTP”), retrofitting and other related water
works in Kuala Terengganu Utara.

Contract Awarder : State Government of Terengganu


Location : Kuala Terengganu Utara, Terengganu
~ MYR 2.5 Million - June 2015 (Crisis Management : Emergency Water
Value & Year Awarded :
System)
Year Completed : May 2020
Scope of Work : Proposed design and build of 5 MLD membrane water treatment plant, service
tank, installation of raw water and treated water pipes, including retrofitting
works and any other works related to it for the Proposed North Terengganu
Water Supply Scheme.

28
Private & Confidential | All Rights Reserved | Copyright 2019
5 MLD WATER TREATMENT PLANT

29
Private & Confidential | All Rights Reserved | Copyright 2019
PROJECTS

The project was implemented to supply Non-Potable Water to construction within Medini’s
area

Contract : Water Reclamation Plant (WRP)

Location : Nusajaya STP, Medini, Johor Darul Takzim

Year Starts : Aug 2018

Year Completed : Jan 2019

Scope of Work : 2MLD Water Reclamation Plant (WRP)

30
Private & Confidential | All Rights Reserved | Copyright 2019
2 MLD WATER RECLAIMATION PLANT

31
Private & Confidential | All Rights Reserved | Copyright 2019
2 MLD WATER RECLAIMATION PLANT

32
Private & Confidential | All Rights Reserved | Copyright 2019
2 MLD WATER RECLAIMATION PLANT

33
Private & Confidential | All Rights Reserved | Copyright 2019
PROJECTS

The project was implemented to mitigate the potential risk of water supply shortage in
Pengerang, Johor Darul Takzim.

Contract : Water Supply to Pengerang Area

Location : Paksi Majumas Development Area, Kg. Lepau, Pengerang

Year Starts : Aug 2018

Year Completed : Jan 2019

Scope of Work : 1MLD Water Treatment Plant

34
Private & Confidential | All Rights Reserved | Copyright 2019
1 MLD WATER TREATMENT PLANT

35
Private & Confidential | All Rights Reserved | Copyright 2019
1 MLD WATER TREATMENT PLANT

36
Private & Confidential | All Rights Reserved | Copyright 2019
1 MLD WATER TREATMENT PLANT

37
Private & Confidential | All Rights Reserved | Copyright 2019
PROJECTS

Location Client Project Description Proposed Scope of Work Value

Kuala State Development of 120 MLD i. Maintenance of WTP’s condition; RM 1.2 Billion
Terengganu, Government of Water Treatment Plants and
Malaysia Terengganu (“WTP”), retrofitting and ii. Control Based Monitoring (“CBM”)
other related works of WTP’s rotating equipment’s
iii. Maintenance for Kepong 1 & 2
and Losong 1, 2, & 3.
iv. Provide cold spares equipments
for WTPs.

Kuala State Development of 44 MLD i. To supply membrane technology RM 20.7


Terengganu, Government of Water Treatment Plant for a 44 MLD WTP to cope with Million
Malaysia Terengganu (“WTP”) current demands; and
ii. Operation and maintenance of the
said WTP.
Kuala State Development of 20 MLD i. To supply and install membrane RM 27.8
Terengganu, Government of Water Treatment Plant technology for a 20 MLD WTP to Million
Malaysia Terengganu (“WTP”) cope with current demands; and
ii. Operation and maintenance of the
said WTP.
Kuala State Development of 5 MLD i. To supply and install membrane RM 2.5 Million
Terengganu, Government of Water Treatment Plant technology for a 5 MLD WTP to
Malaysia Terengganu (“WTP”) cope with current demands,
ii. To ensure enough safe and clean
water to meet the coming Raya
Celebrations; and
iii. Operation and maintenance of the
said WTP. 38
Private & Confidential | All Rights Reserved | Copyright 2019
PROJECTS

Location Client Project Description Proposed Scope of Work Value

Sungai Syarikat Air Maintenance Works of i. To maintain optimum volume of RM 393,920.10


Selangor Selangor Lagoon D2 and its lagoon D2,
Phase 2 Associated Works at ii. Removal of daily sludge,
Water Sungai Selangor Phase 2 vegetation growth scrub and
Treatment Water Treatment Plant debris,
Plant iii. To maintain final effluent
discharge in accordance to DOE’s
standard,
iv. To maintain monsoon drain and
final effluent discharge weir.

39
Private & Confidential | All Rights Reserved | Copyright 2019
BUILDERS AND DEVELOPERS
PROJECTS

Project Client Value Status

Proposed Development of
Kementerian Perumahan dan Pending approval from
Affordable Houses at RM 326,998,470.00
Kerajaan Tempatan (KPKT) KPKT & KAT
AU2, K. Lumpur
Proposed Development at
Kementerian Perumahan dan RM 475,000,000.00 Pending approval from
Taman Menjalara, K.
Kerajaan Tempatan (KPKT) (Estimated) KPKT & KAT
Lumpur
Proposed Residential
RM 250,000,000.00 Pending submission of
Development at Hulu Mirmas Holding Sdn Bhd
(Estimated) Development Order
Langat, Selangor
Proposed Residential Pending submission of
RM 65,000,000.00
Development at Sungai Mirmas Holding Sdn Bhd Development Order
(Estimated)
Karang, Kuantan, Pahang
Feasibility Study Water
Appointed officially.
Requirement at Tg
RM 1,500,000.00 Currently carrying out
Langsat Industrial Technopark (J - Corporation)
(Estimated) survey on 5 selected
Complex on behalf of
factories
Johor Corporation.

41
Private & Confidential | All Rights Reserved | Copyright 2019
PROJECTS

Project Client Value Status

RFP to be submitted on
Proposed a Proposal on
Perbadanan Kemajuan RM 595,673,340.00 29/4/2019, 30/4/2019,
Rumah Perakku (Sites 1,2,3 &
Negeri Perak (Estimated) 2/5/2019 & 7/5/2019
6)
respectively to PKNP
Proposed Development of
United Malayan Land Phase 1 - RM 61 Still negotiating for
Solar Farm and Related Solar
Berhad (UMLand Bhd) Milion (Estimated) concept of development
Energy Activities on 30-acres

Proposed Residential and Phase 2 & 3 – RM 67


Commercial Development at Koperasi Pengerang Kota Million Awarded as Construction
Bandar Penawar Phase 2 & 3 Tinggi Berhad (KOPETI) Phase 4 – RM 268 Manager Consultant
and Phase 4 Million (Estimated)

42
Private & Confidential | All Rights Reserved | Copyright 2019
THANK YOU

A-8-7, Level 8, Empire Tower,


Empire Subang, Jalan SS16/1,
47500, Subang Jaya,
Selangor D. E., Malaysia

Phone: 03 8601 6348 | Fax: 03 5621 0612

Private & Confidential | All Rights Reserved | Copyright 2019

You might also like