Changes in wiring in panel for voltages from 400 kV Substation (T5 and Busbar VT) – Problem
was in what synchrotact relay expect to check to activate permissive for closing command.
Changes must be made for both VT’s.
Changes in wiring for activate 52L permissive (K45/K44) – Wrong permission for 52L MCB anom
to activate 52L permissive.
Changes in wiring to activate manual synchro permissive (activation of KXM/1 and KXM/2)
which is used for DEAD BUS-Froid mode. Also changes probably needed in DCS to give
permissive for manual synchro.
Changes in configuration for synchrocheck 25M to get condition for activate closing command
for 52L.
After all these changes, testing of synchro for 52L must be performed.
These changes can’t be done without an extra time to dedicate myself to work in synchro panel. If I do
this kind of job, secondary injection testing of protection must be postponed for later time, probably for
next 2-3 days.