Summary Trial Mix: Combined Hot Bin (JMF) Hot Bin Quality Gradasi Extraksi Specification
Summary Trial Mix: Combined Hot Bin (JMF) Hot Bin Quality Gradasi Extraksi Specification
Summary Trial Mix: Combined Hot Bin (JMF) Hot Bin Quality Gradasi Extraksi Specification
COMPOSITION OF MIX :
NO. COLD BIN NO. HOT BIN
1 Aggregat Kasar : 21 % 1 HOT BIN I : 30
2 Screen : 39 % 2 HOT BIN II : 26
3 Abu Batu : 30 % 3 HOT BIN III : 33
4 Pasir : 10 % 4 HOT BIN IV : 10
5 Filler : - % 5 FILLER : 1
GRADATION OF MIX :
NO. SIEVE SIZE 1" 3/4" 1/2" 3/8" No.4 No.8 No.16 No.30 No.50 No.100
6 COMBINED HOT BIN (JMF ) 100 96.79 88.31 79.22 59.84 41.97 33.41 25.97 17.44 9.91
7 HOT BIN QUALITY 100 98.24 82.89 72.25 53.11 35.35 25.49 20.73 14.67 7.33
8 GRADASI EXTRAKSI 100 99.25 83.37 71.14 48.53 31.94 19.84 14.51 8.59 5.75
9 SPECIFICATION 100 90 - 10075 - 9066 - 8246 - 6430 - 49 18 - 38 12 - 28 7 - 20 5 - 13
GRADATION OF MIX :
HOT BIN
%
%
%
%
%
No.200
5.90
5.62
4.46
4-8
Keterangan
HASIL PENGUJIAN MARSHALL
SNI. 06 - 2489 - 1991
Jenis Pemeriksaan : √ JMF ( Job Mix Formula √) Asphalt Optimum √ PRD ( Percentage Refusal DensityRetained
√ Marshall
Jenis Campuran : AC-WC √ AC-BC AC-Base ………..
Proyek : Preservasi Jln. Kandui - Patas - Ampah
Kontraktor : CV. Kalimantan Prisma Persada
Tgl Produksi : 02 Juli 2019
Tgl Selesai Penguji : 03 Juli 2019
Trial Mix
No.
a b c d e f g h i j k l m n o p
Contoh
Optimum
1 6.38 1099.7 1104.5 621.25 483.22 2.276 92 948 1080 3.65
2 6.38 ### ### 620.34 482.22 2.280 91 937 1069 3.66
3 6.38 1097.7 1101.3 610.54 490.74 2.237 94 968 1104 3.61
4 6.38 1095.6 1099 612.34 486.69 2.251 91 937 1069 3.59
5 6.38 1098.4 1101.6 613.63 487.93 2.251 92 948 1080 3.60
6 6.38 1099.6 1103.3 612.47 490.78 2.240 91 937 1069 3.62
7 6.38 1097.6 1100.7 614.65 486.03 2.258 2.366 18.36 4.84 73.63 91 937 1069 3.68 298
8 6.38 1096.9 1100.7 613.23 487.46 2.250 92 948 1080 3.55
9 6.38 1093.5 1096.8 613.07 483.68 2.261 90 927 1057 3.59
10 6.38 1094.9 1098.7 610.22 488.43 2.242 94 968 1104 3.67
11 6.38 1097.8 1101.7 610.74 490.98 2.236 92 948 1080 3.68
12 6.38 1098.7 1101.9 610.82 491.03 2.237 95 979 1115 3.66
Rata - rata 2.252 92 948 1081 3.63
Retained
1 6.38 1094.8 1099.2 610.54 488.64 2.240 85 876 998 3.56
2 6.38 ### ### 610.11 491.65 2.231 84 865 986 3.54
2.366 19.02 5.61 70.48 281
3 6.38 1097.7 1102.6 609.96 492.66 2.228 86 886 1010 3.55
Rata - rata 2.233 85 876 998 3.55
Retained (%) : 92.31
PRD
1 6.38 ### 1096.6 620.39 476.16 2.292
2 6.38 ### ### 622.22 475.39 2.298
2.366 17.25 3.55
3 6.38 ### 1096 612.51 483.52 2.257
Rata - rata 2.282
Keterangan :
a % Aspal terhadap batuan i % rongga diantara aggregat Bj.Bulk Aggregat
: 2.582
b % aspal terhadap campuran =100 - ( 100 - b ) g/Bj.Bulk.Aggregat Bj. Aspal : 1.031
c Berat contoh kering ( gr ) j % rongga terhadap campuran 100 * ( 100 g/h ) Bj. Efektif : 2.595
d Berat contoh keadaan jenuh ( gr ) k % rongga berisi aspal( i - j / i ) Absp Aspal : 0.70%
e Berat contoh didalam air ( gr ) l Pembacaan arloji Gmm :
f Isi contoh = ( d - e ) m Stabilitas ( l x kalibrasi proving ). ( kg ) Kalibrasi Proving
: 10.3 Kg
g Berat isi ( c/f ) n Stabilitas ( m x koreksi benda uji ). ( kg ) Aggregat Cold bin
h =Berat maksimum teoritis o Kelelehan ( mm ) Aggregat Hot bin
100 p Hasil bagi marshall - n/o ( kn/mm )
100 - b b Absp Aspal terhadap total agg
+
Bj.Eff.Agg Bj.Aspal Bj.Eff.Agg. - Bj.Bulk Agg
100 x Bj.Aspal
Gmm : ditentukan dengan cara AASHTO T. 209 x Bj.Eff.Agg. x Bj.Bulk Agg
pada kadar aspal optimum perkiraan ( Pb )
Pb = 0,035 ( % CA ) + 0,045 ( % FA ) + 0,18 ( FF ) + K Absorsi Aspal ( 100 - b )
b
k = 0,5 - 1 untuk laston ; 2,0 - 3,0 lataston - 100
Bj.Eff.Agg : ( 100 - Pb )
100 Pb
-
Gmm Bj.Aspal
Proyek : Preservasi Jln. Kandui - Patas - Ampah Tgl Produksi : 02 Juli 2019
Kontraktor : CV. Kalimantan Prisma Persada Jenis campur : AC - BC
Laboratori : CV. Kalimantan Prisma Persada
Ukuran Saringan Hot- Bin Hot - Bin Hot - Bin Hot Bin Agregat
Filler Spesifikasi
Mm Inch I II III IV Gabungan
37,5 1,5
25,4 1 100 100 100 100 100 100 100
19,1 3/4 94.15 100 100 100 100 98.24 90 - 100
12,7 1/2 54.84 86.29 100 100 100 82.89 75 - 90
9,4 3/8 39.47 74.92 90.69 100 100 72.25 66 - 82
4,75 No.4 0.09 56.88 83.96 95.89 100 53.11 46 - 64
2,36 No.8 0.35 75.97 91.95 100 35.35 30 - 49
1,18 No.16 47.45 88.30 100 25.49 18 - 38
0,6 No.30 34.09 85.30 95.09 20.73 12 - 28
0,3 No.50 19.04 74.55 93.56 14.67 7 - 20
0,15 No.100 65.11 82.29 7.33 5 - 13
0,075 No.200 48.65 75.84 5.62 4-8
Komposisi Campuran
A. HOT - BIN I 30 0.30
B. HOT - BIN II 26 0.26
C. HOT - BIN III 33 0.33
D. HOT - BIN IV 10 0.10
E. Filler 1 0.01
Persen Lolos (%)
100
90 Titik Kontrol
80 Agregat
Gabungan
70
60
50
40
30
20
10
0.07 0.150.3 0.6 1.1 2.3 4.7 9.4 12. 19. 25.
5 8 6 5 7 1 4
0
Ukuran Saringan (mm)
PENGUJIAN
NO URAIAN SAT Rata - rata Spec
I II
1 Berat contoh sebelum ektraksi gram 500.02 500.00
2 Berat contoh sesudah ektraksi gram 471.59 471.52
3 Berat penyaring sebelum ektraksi gram 3.41 3.45
4 Berat total agregat (2-3) gram 468.18 468.07
5 Berat aspal (1-4) gram 31.84 31.93
6 % aspal / Kadar aspal ( 5/1*100 ) gram 6.37 6.39 6.38 6.30
Ukuran Saringan Berat tertahan Persen Persen Berat tertahan Persen Persen Persen Lolos
Spec
mm Inch ( gram ) Tertahan Lolos ( gram ) Tertahan Lolos Rata- rata
37.5 1 1/2
25.4 1 100 100 100 100
19.1 3/4 3.50 0.75 99.25 3.56 0.76 99.24 99.25 90 - 100
12.7 1/2 78.25 16.71 83.29 77.45 16.55 83.45 83.37 75 - 90
9.4 3/8 134.14 28.65 71.35 136.02 29.06 70.94 71.14 66 - 82
4.75 No.4 212.54 45.40 54.60 269.34 57.54 42.46 48.53 46 - 64
2.36 No.8 319.85 68.32 31.68 317.33 67.80 32.20 31.94 30 - 49
1.18 No.16 364.94 77.95 22.05 385.56 82.37 17.63 19.84 18 - 38
0.6 No.30 380.56 81.28 18.72 419.84 89.70 10.30 14.51 12 - 28
0.3 No.50 419.09 89.51 10.49 436.76 93.31 6.69 8.59 7 - 20
0.15 No.100 442.47 94.51 5.49 439.99 94.00 6.00 5.75 5 - 13
0.075 No.200 445.73 95.20 4.80 448.75 95.87 4.13 4.46 4-8
Berat contoh 468.18 468.07