PIPE LOSS CALCULATION- FIRE PROTECTION

FROM TANK TO TAPPING POINT


@(946.352 lpm) FITTINGS AND VALVE

PIPE LOSS (Pa PIPE LOSS


PIPE SIZE mmAq/m mAq/m TOTAL LENGTH (m) TOTAL LOSS (mAq) PIPE SIZE
/m) (Pa /m)

100A 400 40 0.04 22.5 0.9 ELBOW 100A 400

TEE 100A 400


FROM TAPPING POINT TO FHC-01
@(473.18 lpm) ELBOW 65A 935.5

65A 935.5 93.55 0.09355 156 14.5938

FITTINGS AND VALVE


PIPE LOSS
m Aq PSI PIPE SIZE (Pa /m)
LOSS IN PIPES 15.4938 22.13

ELEVATION HEAD 6 8.57 GATE VALVE 100A 400

PRESSURE @ END as per NFPA 65 CHECK VALVE 100A 400

Y-STRAINER 100A 400


GETTING THE TOTAL DYNAMIC HEAD ;(TDH)
TDH = PRESSURE LOSS OF PIPES + LOSS IN FITTING AND VALVES + ELEVATION HEAD
+ PRESSURE @ END
TDH= 99.71 ALLOWANCE 5% LOSS IN FITTINGS AND VALVES

TDH= 104.70 SAY 100 PSI


FIRE PUMP CAPACITY JOCKEY PUMP CAPACITY

FLOW RATE = 250 GPM FLOW RATE =12.5 GPM

TOTAL DYNAMIC HEAD = 100 PSI TOTAL DYNAMIC HEAD = 110 PSI

Calculating the Capacity of the Tank:

From NFPA 14 Section 7-3 Minimum Supply for the System shall be sufficient to provide the System demand established for at least 30 mins

Water Tank = 250 Gpm x 30 mins.

Water Tank = 7,500 Gpm

Water tank = 28,390.5 Liters. Allowance : 10 %

Say Water Tank = 40,000 Liters ( 40 cu. M)


ATION- FIRE PROTECTION

TOTAL LENGTH TOTAL LOSS


mmAq/m mAq/m QTY
(m) (mAq)

40 0.04 3.6 0.144 3 0.432

40 0.04 7.3 0.292 1 0.292

93.55 0.09355 1.98 0.185229 6 1.111374

TOTAL LENGTH TOTAL LOSS


mmAq/m mAq/m QTY
(m) (mAq)

40 0.04 0.7 0.028 2 0.056

40 0.04 7.62 0.3048 2 0.6096

40 0.04 7.62 0.3048 1 0.3048

m Aq PSI
2.805774 4.01
demand established for at least 30 mins.
PIPE LOSS CALCULATION
@ FITTINGS AND VALVES @ 250 gpm
PIPE LOSS (Pa TOTAL LOSS
PIPE SIZE mmAq/m mAq/m TOTAL LENGTH (m) PIPE SIZE
/m) (mAq)

100A 360 36 0.036 73.068 2.630448 ELBOW 100A

100A
TEE
100A

CHECK 100A

100A
GATE
(OS&Y,PRV,ISOLATI
ON) 50A

@ 100 GPM FITTINGS AND VALVES @ 100 gpm

PIPE LOSS (Pa TOTAL LOSS


PIPE SIZE mmAq/m mAq/m TOTAL LENGTH (m) PIPE SIZE
/m) (mAq)

65A 510 51 0.051 156.277 7.970127 ELBOW 65A

65A
TEE
65A
LOSS IN PIPES 10.600575 LOSS IN FITTINGS AND VALVES

ELEVATION HEAD = 9m Aq
PRESSURE @ END CONSIDERING 65 Psi = 44.82 m Aq

GETTING THE TOTAL DYNAMIC HEAD ;(TDH)

TDH = PRESSURE LOSS OF PIPES + LOSS IN FITTING AND VALVES + ELEVATION HEAD + PRESSURE @ END

TDH= 67.649295 ALLOWANCE= 1.10

TDH = 74.414225 THEREFORE USE 80M.


LOSS CALCULATION
ITTINGS AND VALVES @ 250 gpm
PIPE LOSS mmAq/m mAq/m TOTAL LENGTH TOTAL LOSS QTY
(Pa /m) (m) (mAq)

360 36 0.036 3.6 0.1296 7 0.9072

360 36 0.036 7.3 0.2628 1 0.2628

360 36 0.036 2 0.072 3 0.216

360 36 0.036 7.62 0.27432 1 0.27432

360 36 0.036 0.7 0.0252 5 0.126

360 36 0.036 0.4 0.0144 1 0.0144

ITTINGS AND VALVES @ 100 gpm

PIPE LOSS mmAq/m mAq/m TOTAL LENGTH TOTAL LOSS QTY


(Pa /m) (m) (mAq)

510 51 0.051 1.9 0.0969 10 0.969

510 51 0.051 4.2 0.2142 1 0.2142

510 51 0.051 1.2 0.0612 4 0.2448


OSS IN FITTINGS AND VALVES 3.22872