SITE TEST REPORT Date :

Customer:
Contractor’s name:
AL FANAR. NG-SA

Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :


DESCRIPTION : DIRECTIONAL O.C/ E.F RELAY (REQ 650) Test 4400006262
Page 1 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

1. GENERAL INFORMATION

Make ABB Model / Type REQ650


Panel Ref Designation
Sr. No. Aux. Voltage 48-110 V DC
Rated voltage 125V DC Rated current
CT Ratio VT Ratio

ELECTRICAL TEST.
3.1 BURDEN CHECK:
Applied DC DC Current Without DC Current During Calculated
Voltage Fault Fault Watts

Limit: 11W (According to the Catalogue page no. 10/52 )

3.2 Measurement Check:


Expected
Phase Injected Amp Observed Amp % Error
Reading
A

Limit: ±5% (According to the Catalogue page no. 11/52 )

3.3 DIRECTIONAL OVER CURRENT P/U AND D/O CHECK:


Phase Angle= °, Voltage= V.

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
AL FANAR. NG-SA

Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :


DESCRIPTION : DIRECTIONAL O.C/ E.F RELAY (REQ 650) Test 4400006262
Page 2 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

CURRENT INJECTED PICK UP DROPOFF


PHASE LIMIT LIMIT
SETTING CURRENT CURRENT CURRENT

Limit: P/UP = ±5% D/OFF = 0.95 x Setting ±5% (According to the Catalogue page no.23/52 )

3.4 DIRECTIONAL O/C BLOCK VOLTAGE CHECK:


Current= A, Phase Angle= °.
VOLTAGE APPLIED
PHASE PICK UP LIMIT DROPOFF LIMIT
SETTING VOLTAGE

Limit: P/UP ±10% D/OFF=0.9 x Setting ±10%

3.5 DIRECTIONAL O/C PHASE ANGLE REACH CHECK:


CURRENT= A, VOLTAGE= V.
Measured Phase Angle
RCA Polarizing Calculated
Phase Forward Reverse
Setting Voltage(V) Angle◦
From To From To
DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
AL FANAR. NG-SA

Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :


DESCRIPTION : DIRECTIONAL O.C/ E.F RELAY (REQ 650) Test 4400006262
Page 3 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

A
B
C
N
Limit: ±2° (According to the Catalogue page no. 23/52 )

3.6 DIRECTIONAL O/C TIME TEST:


Voltage= V, Phase Angle= °, Current= A.
Phase Time Setting Measured Time Limit

Limit: ±2% or 50ms whichever is greater (According to the Catalogue page no.23/52 )

3.7 DIRECTIONAL EARTH FAULT P/U AND D/O CHECK:


Phase Angle= °, Voltage= V.
CURRENT INJECTE PICK UP DROPOFF
PHASE SETTING D CURRENT LIMIT CURRENT LIMIT
CURRENT

Limit: : P/UP = ±5% D/OFF = 0.95 x Setting ±5% (According to the Catalogue page no29/52. )

3.8 DIRECTIONAL E/F BLOCK VOLTAGE CHECK:


Current= A, Phase Angle= °.
VOLTAGE APPLIED
PHASE PICK UP LIMIT DROPOFF LIMIT
SETTING VOLTAGE

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
AL FANAR. NG-SA

Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :


DESCRIPTION : DIRECTIONAL O.C/ E.F RELAY (REQ 650) Test 4400006262
Page 4 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

Limit: P/UP ±10% D/OFF=0.9 x Setting ±10% (According to the Catalogue page no.30/52 )

3.9 DIRECTIONAL E/F PHASE ANGLE REACH CHECK:


CURRENT= A, VOLTAGE= V.
Phase Phase Angle
RCA
PHASE Angle Forward Reverse Calculated
Setting From To From To

Limit: ±2° (According to the Catalogue page no.30/52 )

3.10 DIRECTIONAL E/F TIME TEST:


Voltage= V, Phase Angle= °
1.1. TIME Characterstics TEST: Current setting Is= TMS=
CURVE MEASURED TIME (Sec)
CAL: TIME AT
DESCRIPTIO PHASE STAGE-1 STAGE-2
N 2xIs 5xIs 10xIs 2xIs 5xIs 10xIs
DEFINITE ….. Sec STAGE- A ----- -----
TIME 1 B ----- -----

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
AL FANAR. NG-SA

Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :


DESCRIPTION : DIRECTIONAL O.C/ E.F RELAY (REQ 650) Test 4400006262
Page 5 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

…….Sec C ----- -----


STAGE-2 N ----- -----
A
IEC
B
STANDARD NA
C
INVERSE
N
A
IEC VERY B
NA
INVERSE C
N
A
IEC
B
EXTREMELY NA
C
INVERSE
N
A
B
LONG TIME NA
C
INVERSE
N
A
SHORT TIME B
NA
INVERSE C
N
Limit = IDMT= ±5% or 40ms , DT= ±2% or 50ms

4. FINAL SETTING TEST:


4.1 DIRECTIONAL OVER CURRENT P/U AND D/O CHECK:
Phase Angle= °, Voltage= V, Current= A.
INJECTE PICK UP DROPOFF
PHASE D CURRENT LIMIT CURRENT LIMIT
CURRENT

Limit: P/UP = ±5% D/OFF = 0.95 x Setting ±5% (According to the Catalogue page no.23/52 )

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
AL FANAR. NG-SA

Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :


DESCRIPTION : DIRECTIONAL O.C/ E.F RELAY (REQ 650) Test 4400006262
Page 6 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

4.2 DIRECTIONAL O/C BLOCK VOLTAGE CHECK:


Current= A, Phase Angle= °, Voltage= V.
APPLIED
PHASE PICK UP LIMIT DROPOFF LIMIT
VOLTAGE

Limit: P/UP ±10% D/OFF=0.9 x Setting ±10%


4.3 DIRECTIONAL O/C PHASE ANGLE REACH CHECK:
CURRENT= A, VOLTAGE= V, Phase Angle= °.
Polarizing Measured Phase Angle
RCA Setting Calculated Angle
Voltage(V) Forward Reverse
From To From To

Limit: ±2°
4.4 DIRECTIONAL O/C TIME TEST:
Voltage= V, Phase Angle= °, Current= A.
Phase Time Setting Measured Time Limit

Limit: ±2% or 50ms whichever is greater (According to the Catalogue page no.23/52 )

4.5 DIRECTIONAL EARTH FAULT P/U AND D/O CHECK:


Phase Angle= °, Voltage= V, Current= A.
INJECTE PICK UP DROPOFF
PHASE D CURRENT LIMIT CURRENT LIMIT
CURRENT

Limit: : P/UP = ±5% D/OFF = 0.95 x Setting ±5% (According to the Catalogue page no29/52. )
4.6 DIRECTIONAL E/F BLOCK VOLTAGE CHECK:
Current= A, Phase Angle= °, Voltage= V.
APPLIED
PHASE PICK UP LIMIT DROPOFF LIMIT
VOLTAGE

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________
SITE TEST REPORT Date :
Customer:
Contractor’s name:
AL FANAR. NG-SA

Name of substation: Dammam Housing 115/13.8KV Substation # 1 NG-SA Contract No. :


DESCRIPTION : DIRECTIONAL O.C/ E.F RELAY (REQ 650) Test 4400006262
Page 7 of 7
Panel/ Bay No: Equip. No.: Dwg. Ref.: Record No.:

Limit: P/UP ±10% D/OFF=0.9 x Setting ±10% (According to the Catalogue page no.30/52 )
4.7 DIRECTIONAL E/F PHASE ANGLE REACH CHECK:
CURRENT= A, VOLTAGE= V, Phase Angle= °.
RCA Polarizing Calculated Measured Phase Angle
Setting voltage Angle Forward Reverse
From To From To

Limit: ±2° (According to the Catalogue page no.30/52 )


4.8 DIRECTIONAL O/C TIME TEST:
Voltage= V, Phase Angle= °, Current= A.
Phase Time Setting Measured Time Limit

Limit: DT= ±2% or 50ms


5. TEST EQUIPMENT USED:
Sl. No Description Make Equipment Sl. No Calibration Calibration
Date Due Date
1
2

DATE:
TESTING ENGINEER CSD- Engineer
Signature: ________________ Signature: ________________
Name : ________________ Name : ________________