Professional Documents
Culture Documents
Oct-19
Oct-19
PLOT NO 1 BAYA NGR MIRA RD E For power SMS POWER <9 digit account no.> to www.adanielectricity.com
interruption, 7065313030 from any mobile no. helpdesk.mumbaielectricity@adani.com
THANE 401107
complaint or Give us a missed call on 1800 532 9998 Join us on,
restoration from your registered mobile no.
Mobile No 87******59 status For other queries:WhatsApp on
9022 81 3030 (8am to 8pm)
Email Id an*******i9@gmail.com
Connected Load in kW 2.69 Bill No. 101922651290 Bill Date 25-10-2019 Cycle No. 06
PAN Bill Distribution No. NORTH/NZ3-BHAINDAR Type of Supply SINGLE
GSTIN (E)/06/308/013/013/001 PHASE
DUE DATE
15.11.2019
Tentative meter reading date for your NOV-19 bill is 21-
TRACK YOUR CONSUMPTION (UNITS) ●
11-2019.
● Please Check / Update your PAN and GSTIN number by
visiting nearest Customer Care Center or email to
IMPORTANT MESSAGE
430 NOV-18 34
helpdesk.mumbaielectricity@adani.com with copies of
DEC-18 22 PAN and GSTIN for verification. If already submitted
JAN-19 18 then please ignore this message.
` 980.00* MAY-19
JUN-19
13
23
JUL-19 18
Watch your consumption as Oct AUG-19 18
weather tends to get hotter & humid
SEP-19 17
ALERT which incrases the usage and thereby 46 36
applicability of higher slab tarrif. OCT-19 OCT-18
Abbr. in receipt: ‘Q’ for cheque. ‘C’ for cash. E.&O.E. CONSOLIDATED STAMP DUTY PAID BY For Advertisement please contact on
ORDER NO. CSD/25/2019/2160/19 dated 15.05.2019 info@seshaasai.com
PAY-IN SLIP FOR CHEQUE DROP
● Always attach payment slip. Do not staple ● Make cheque payable to Adani Electricity Mumbai Ltd. A/C No.:100645688
● Mention A/c No. and respective amount on back of the cheque,when making multiple bill payments by single cheque.
06/308/013
b/f :7.71 013/001/S09
0100645688000000980151120190000099000000097001112019
Round Sum payable: ` 980.00 Discounted Amount(Round sum): ` 970.00 Amount after due date (Round sum): ` 990.00
OCT-19 100645688 /0/ Due date: 15.11.2019 Discount date: 01-11-2019
HOW YOUR BILL WAS CALCULATED Rate `
0100645688000000980151120190000099000000097001112019
NOTE Now you can earn a high interest rate of up to 10.05% per annum on
your Adani Electricity Security Deposit*
• To pay online, visit www.adanielectricity.com
• Cash payment limited to `20,000 or bill amount whichever is lower *Interest on Security Deposit comprises SBI MCLR rate as on
• Adani Electricity counter timings: 1st April for one year + 150 Basis Points(8.55% + 1.50%).
9:30 a.m. to 12.30 p.m. and 1.30 p.m. to 5.05 p.m For FY 2019-20,it is 10.05%
• Get 7% interest on VDS (reducing balance)
GSTN
If paying by cheque, please remember Power theft results in power tariff hike - Report them
• Cheque payment subject to realization, any dishonored cheque will Honest citizens bear the cost of power stolen by unauthorized elements.
- Result in payment of bills by DD for subsequent 6 months If you spot an electrical theft, please report on 19122.
- Attract a penal amount of `250 per bill
27AADCD0086F1ZW
Consumer Grievance Redressal Forum (CGRF) • Switch Off all your appliances when stepping out of home.
Only for grievances unresolved by IGRC,
reach Consumer Grievance Redressal Forum at
ENERGY
CONSERVATION TIPS
• If using multi-bulb fixture,switch to low-wattage bulbs.
Adani Electricity, 1st Floor, Devidas Lane,
Off SVP Road, Near Devidas Lane Telephone • Keep your ACs on 24*C, preferably in 'Dry' Mode.
Exchange, Borivali West, Mumbai 400 103
Kindly note that theft of electricity in any manner attracts penal action under the Electricity Act, 2003.
------------------------------------------------------------------------------------------------------------------------------------