Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

24x7 Powerline CUSTOMER CARE CENTRE/CORRESPONDENCE

BILL OF SUPPLY COMMERCIAL ADDRESS/INTERNAL GRIEVANCE REDRESSAL CELL


(IGRC)
We’re
M S PARVEEN DEVELOPERS
SH1 101 SABA PARVEEN MAHA N NO 3
19122 listening. 2nd floor ,MB Trade center, Near Railway Phatak, Bhaindar
(E), Dist-Thane,401105

PLOT NO 1 BAYA NGR MIRA RD E For power SMS POWER <9 digit account no.> to www.adanielectricity.com
interruption, 7065313030 from any mobile no. helpdesk.mumbaielectricity@adani.com
THANE 401107
complaint or Give us a missed call on 1800 532 9998 Join us on,
restoration from your registered mobile no.
Mobile No 87******59 status For other queries:WhatsApp on
9022 81 3030 (8am to 8pm)
Email Id an*******i9@gmail.com
Connected Load in kW 2.69 Bill No. 101922651290 Bill Date 25-10-2019 Cycle No. 06
PAN Bill Distribution No. NORTH/NZ3-BHAINDAR Type of Supply SINGLE
GSTIN (E)/06/308/013/013/001 PHASE

To update your email Id and mobile no.,call us on 19122


This electricity bill niether reflects a title nor is to be used as a proof of any property or premises.

YOUR CURRENT CONSUMPTION


ACCOUNT NO
Tariff Meter Multiplying Energy consumption Energy Fixed
100645688 number Factor charge charge
(MF) Present Previous Consumption (`) (`)
reading reading (Unit kWh)
LT II (A) 4642816 1 7967.00 7921.00 46.00 310.50 365.00
BILL MONTH
OCT-19
TOTAL 46 310.50 365.00

DUE DATE
15.11.2019
Tentative meter reading date for your NOV-19 bill is 21-
TRACK YOUR CONSUMPTION (UNITS) ●

11-2019.
● Please Check / Update your PAN and GSTIN number by
visiting nearest Customer Care Center or email to

IMPORTANT MESSAGE
430 NOV-18 34
helpdesk.mumbaielectricity@adani.com with copies of
DEC-18 22 PAN and GSTIN for verification. If already submitted
JAN-19 18 then please ignore this message.

FEB-19 2 ● Additional security deposit demanded along with March


19 bill still unpaid `. 820.00
DUE AMOUNT MAR-19
APR-19
19
32

` 980.00* MAY-19
JUN-19
13
23
JUL-19 18
Watch your consumption as Oct AUG-19 18
weather tends to get hotter & humid
SEP-19 17
ALERT which incrases the usage and thereby 46 36
applicability of higher slab tarrif. OCT-19 OCT-18

Refer to Important Message

DISCOUNTED BILL AMOUNT


Round sum bill payable (after discount
of ` :7.94) on or before discount
date 01-11-2019 ` 970.00

LATE PAYMENT BILL AMOUNT


Round sum bill payable (including
DPC of ` :12.20) after due
date 15.11.2019 ` 990.00 #
*Refers only to current bill amount. Previous balance is
payable immediately.
#Payable until one month after due date, there after
interest applicable as per MERC tariff order.

Abbr. in receipt: ‘Q’ for cheque. ‘C’ for cash. E.&O.E. CONSOLIDATED STAMP DUTY PAID BY For Advertisement please contact on
ORDER NO. CSD/25/2019/2160/19 dated 15.05.2019 info@seshaasai.com
PAY-IN SLIP FOR CHEQUE DROP

If paying by cheque, please remember:


● Cheque should be Account payee of local clearing and not post-dated

● Always attach payment slip. Do not staple ● Make cheque payable to Adani Electricity Mumbai Ltd. A/C No.:100645688

● Mention A/c No. and respective amount on back of the cheque,when making multiple bill payments by single cheque.

06/308/013
b/f :7.71 013/001/S09
0100645688000000980151120190000099000000097001112019
Round Sum payable: ` 980.00 Discounted Amount(Round sum): ` 970.00 Amount after due date (Round sum): ` 990.00
OCT-19 100645688 /0/ Due date: 15.11.2019 Discount date: 01-11-2019
HOW YOUR BILL WAS CALCULATED Rate `
0100645688000000980151120190000099000000097001112019

Electrical Energy ( HSN Code 27160000)


YOU CAN USE
Fixed Charge 365.00
RTGS/NEFT VIA
Wheeling charge 72.22
NETBANKING TO PAY
Regulatory asset charge 20.24
YOUR ELECTRICITY BILL
Energy Charge 310.50
Fuel Adjustment Charge (FAC)# 56.50 p/unit 25.99
Government electricity duty 21.00 % 166.73
Maharashtra Govt. tax on sale of electricity 34.04 p/unit 15.66
Current month's bill amount (A) 976.34
ADD US AS A PAYEE FOR A
Others 0.00 NEW ACCOUNT
Delayed Payment Charge on previous month's bill 0.00 (No need to change the existing
Digital Payment Discount 1.31 Cr account)

Interest on arrears 0.00 Payee Account No.


Adjustments 0.00 EPAEML100645688
Net Other Charges in current bill (B) 1.31 Cr Payee Name
Current Month charges (A+B) 975.03 Adani Electricity Mumbai Limited
Previous month's bill amount 647.71 Bank Name
Payment received upto 08.10.2019 640.00 HDFC Bank Ltd.
Prompt Payment Discount 0.00 Branch Name
Net previous balance(C) 7.71 Kanjurmarg Branch,Mumbai
Total bill amount(A+B+C) 982.74 IFSC HDFC0004989
Amount deferred 0.00 Account Type Current
#FAC is being included in your monthly charges in accordance with MERC (MYT 3rd Amendment) Regulations, 2014 dated 8th
May 2014. Please refer to “your tariff structure” below.
For Correspondence Address kindly refer the Front Page Customer Care Centre address.
AEML CIN U74999GJ2008PLC107256

Regd. Office: Adani Electricity Mumbai Ltd.


Adani House, 56, Shrimali Society, Nr. Mithakhali Six Roads, Navrangpura, Ahmedabad, Gujarat 380009

ROUND SUM KEEP A WATCH TO MANAGE YOUR ENERGY CONSUMPTION


PAYABLE Your tariff structure (Effective from 01.04.2019)
WITH THIS BILL 980.00 Tariff Tariff slabs Fixed Charge Energy Charge Wheeling charges RA charge FAC rate
Paise/unit
LT II `/month `/unit `/unit `/unit OCT-19
Your security deposit 0.00 (A):Commercial
0-20 kW
(SD) with us
All units 365 6.75 1.57 0.44 56.50
Your unpaid security 820.00
TOD Tariffs(In addition to above base tariffs) optionally available where TOD meter installed
deposit (SD) 06:00 to 09:00 Hrs 0.00

09:00 to 12:00 Hrs 0.50


Meter reading date 22-10-2019 12:00 to 18:00 Hrs 0.00

Previous meter reading date 18:00 to 22:00 Hrs 1.00


21-09-2019
PAN

22:00 to 06:00 Hrs -0.75


As per Electricity Supply Code, you can also opt for your own meter Electricity Duty as per Govt. of Maharashtra Notification No. ELD.2015/CR 21/NGR-1 of 13-04-2015. Tax on Sale of Electricity as per Govt. of Maharashtra Notification No.VVK-2018/CR-161/Energy-1 of 26-12-2018
(adhering to BIS standards)
AADCD0086F

NOTE Now you can earn a high interest rate of up to 10.05% per annum on
your Adani Electricity Security Deposit*
• To pay online, visit www.adanielectricity.com
• Cash payment limited to `20,000 or bill amount whichever is lower *Interest on Security Deposit comprises SBI MCLR rate as on
• Adani Electricity counter timings: 1st April for one year + 150 Basis Points(8.55% + 1.50%).
9:30 a.m. to 12.30 p.m. and 1.30 p.m. to 5.05 p.m For FY 2019-20,it is 10.05%
• Get 7% interest on VDS (reducing balance)
GSTN

If paying by cheque, please remember Power theft results in power tariff hike - Report them
• Cheque payment subject to realization, any dishonored cheque will Honest citizens bear the cost of power stolen by unauthorized elements.
- Result in payment of bills by DD for subsequent 6 months If you spot an electrical theft, please report on 19122.
- Attract a penal amount of `250 per bill
27AADCD0086F1ZW

Consumer Grievance Redressal Forum (CGRF) • Switch Off all your appliances when stepping out of home.
Only for grievances unresolved by IGRC,
reach Consumer Grievance Redressal Forum at
ENERGY
CONSERVATION TIPS
• If using multi-bulb fixture,switch to low-wattage bulbs.
Adani Electricity, 1st Floor, Devidas Lane,
Off SVP Road, Near Devidas Lane Telephone • Keep your ACs on 24*C, preferably in 'Dry' Mode.
Exchange, Borivali West, Mumbai 400 103

T 3009 4247 PLEASE REMEMBER


E Consumerforum.Mumbaielectricity@adani.com Using electricity connection for purposes other than that provided for is a tariff violation and may lead to

W cgrf.adanielectricity.com disconnection/penal action as per law.

Kindly note that theft of electricity in any manner attracts penal action under the Electricity Act, 2003.

Please quote your account no.100645688in all your correspondence.

------------------------------------------------------------------------------------------------------------------------------------

You might also like