Download as pdf
Download as pdf
You are on page 1of 3
SB. VEGI Supplier & Malti Busines Kalikovilady, Kopay Center, Kopay. | Tel: 071 2134515, 077 3158396 ESTIMATE OF THE EXPENSES NECESSARY TO BE INCURRED FOR THE ST- ANTHONY CHURCH AT KAYTS |applying wood preservative, (measurements Payment ) 675000 |24 BWG (1.2 mm) Galvanised iron flashing 450mm grith overall 3 times bent with laps not less than 150mm lead soldered turned and tucked up t0 not less than 150mm in to chase out in wall and pointed in cement mortor 1:2 lower end dressed over roof covering not less than 300mm wide. |Chipping & patching wall crecks in cement sand 1:3 in place of ldamage once. Chipping the damage floor & Rendering in cement sand 1:3. with Incat cement floating. Supply and fix valance / barge board in spl upper class timber |225x20mm fixed complete with necessary brass screws. Supplying & fixing 0.45mm TCT colour bonded Zn/Al down pipes. [Size 100mm x 100mm) Rate to include for brackets, brass screw, wooden plug sete. [Supplying & faxing 0.45mm TCT colour bonded Zn/Al eave atters.(Girth 700mm) Rate to include for necessary brackets. |25mm x 6mm - Flat iron - 1" - 0" long weld to end purlin as Jbracket 10 fix valance board with two coats of anticorrosive paint land bolt & rut. |Prepare Surface and apply one coat of alkali resisting primer and| Jowo coats of emulsion paint, colour to the internal walls 1,929,500.00) Sapper & Multi Business SB. VEGI Sigler Se Mal Bussiness Kalikovilady, Kopay Center, Kopay. J Tel: 071 2134515, 077 3158396 ESTIMATE OF THE EXPENSES NECESSARY TO BE INCURRED FOR THE ST- ANTHONY CHURCH AT KAYTS 1,929,500.00 |Prepare Surface and apply one coat of alkali resisting primer and| 10.0 |1wo coats of weathershield emulsion paint, colour to the esternal] M2 y 562,500.00] walls and columns Prepare Surface and apply one coat of primer and two coats of 480.00 | 790.00 Jenamel paint, colour 10 the timber work. oa [Supply & Installation of Bracket lamp (water tight) with shade. 8.00 | 6,500.00 Supply and Installation of Energy server Lamp /Angle/Straight). Including Samp single hung switch with 5,500.00 lastic lamp shade with the proper wiring arrangements. ipply & Installation of Wall fans with regulator & switch. with ihe proper wiring arrangements. ( Excluding wall fans Rate ) Supply and Installation of Hood lamp fittings with 32 W CFL. 19,500.00 bulb and proper wiring arrangements to complete the work. Supply and Installation of LED Spot Lamp. Including Samp |single hung switch with plastic lamp shade with the proper wiring arrangements.(lamp price range Rs. 1200-1500) Supply & Installation of 5 amp socket outlet with earthing 5,500.00 larrangements.. Supply & Insiallation of 13 amp socket outlet with earthing} larrangements. eee Supply & insataon of 15 amp socket outlet with earthing SB.VEGI ‘Supplier & Multi Business SB. VEGI Supplier Se Mali Business Kalikovilady, Kopay Center, Kopay. J Tel: 071 2134515, 077 3158396 | ESTIMATE OF THE EXPENSES NECESSARY TO BE INCURRED FOR THE ST- ANTHONY CHURCH AT KAYTS 20.0{equivalent with 18 way MCB modular cartridge [orange sigma equivalent). | / 1800.00 22.0|Supply & installation of main isolater single phase 40 amps x 2,600.00 23.0 |Supply & installation of Earth Electrode ground inject copper rod 6,500.00 J2<10mm2+10mm2 sub main wire.(twin) supplied & fixed) providing stay wire as per approval. SBVEC plier & Multi Business

You might also like