Professional Documents
Culture Documents
EEE F211 Orientation1 Cycle PDF
EEE F211 Orientation1 Cycle PDF
Orientation
2. Foot Wear
All students have to wear full shoes with rubber sole. (sandals, slippers– x )
3. Do not touch any live terminals or wires. For changing any connections you must
switch off the supply. ( Always start with minimum excitation)
5 . Before switching on the supply, get your circuit connections approved by the
instructors.
6. Be generally alert. ( No lackadaisical approach)
Instructions: Operations Of Lab Components
1. Always report in the lab on Time
2. Thoroughly and critically read the instruction set (lab manual) and come prepared to
conduct the experiments.
3. Make the connections with proper gauge of wires as per the circuit diagram and get it
verified by the Instructor.
4. Carry out the experiments as per the steps given in the lab Manual.
5. All computations are to be done in the lab itself. Get the result/ findings verified by
the instructor. Support the conclusion/ inferences with the help of graphs, if
necessary.
6. If you miss any lab turn (approach the instructor with proper reason, in advance), you
can conduct the make-up experiment with instructors permission and in time slot
allotted by instructor. He needs to submit the writeup separately.
Contd.
7. Submit one writeup per batch after the experiment is done on next turn,having :
Aim of the experiment, neat & properly labeled circuit diagram, NPR’s (name plate rating of
machines), Aim of the experiment, Circuit Diagram, Observation Table, Calculations, Graph,
Results & Precautions .
125V/2A
LPF
0- 2A
1A
0-125V
1A
25V/10A
UPF 0-10A
1A
0-25V
1A
272Ω/1.7A
0-2A
0-5A
90Ω / 5A
7A
7A 0-250V
Ensure Ra (ext) at it’s maximum value while switching ON the DC supply mains
Do not switch OFF the supply mains until the two tests are over (Swinburne’s & speed
control Tests).
SWINBURNE’S TEST
Readings
Applied Voltage V =
Armature Current Iao =
Foild Current If =
SPEED CONTROL OF DC MOTOR
PANEL NO 4
DC Shunt Machine (Panel No. 4)
Name plate rating of DC Machine(Panel 4)
N=1400 rpm
PANEL NO 5
DC Shunt Machine (Panel No. 5)
Name plate rating of Panel No. 5
EXPERIMENT NO – 3
LOAD TEST ON THREE PHASE INDUCTION MOTOR.
Experiment No. 4 (K K Gupta Electrical Machines Lab)
100Ω /5A
7A
0-300V
272Ω /1.7A
7A
0-2A
2A
272Ω /1.7A
2A
Note for Panel 11: Voltmeter Range (0-250V), All other ranges are same for both the panels.
OPEN CIRCUIT TEST
DC Shunt Motor coupled
with DC Shunt Generator
8 DC Motor -
Generator set
(coupled)
Motor-220V,
20.3A, 5H.P,
1450 rpm
Generator- 220V,
11.8A, 2.6KW
1450rpm
DC Shunt Motor coupled
with DC Shunt Generator
Panel Machine
No. Rating
11 DC Motor -
Generator set
(coupled)
Motor-230V,
28A, 5.5KW,
1450 rpm
Generator-
160V, 29A,
4.65KW
1450rpm
DC Shunt Motor coupled with DC
Shunt Generator
EXPERIMENT NO -5 (K K Gupta Electrical Machines Lab)
A.DESIGN OF A SINGLE PHASE SMALL TRANSFORMER
B.STUDY OF OPEN LAB MACHINES.
C.MEASUREMENT OF ARMATURE RESISTANCE OF DC SHUNT MOTOR.
25A 0-25A
25A
0-25V
Observation Table:
Va (V)
Ia (A)
Go round the lab ( take instructor’s help) and familiarize yourself with LAB. (e.g.
How AC/DC power is being supplied to the panels.)