RESEARCH
FIELD REGISTER
(fs¥gÂntL)
1
QUALITY ASSURANCE&RESEARCH
CONTENTS
PART A : NON -
BITUMINOUS
LAYERS
PART A - I FIELD REGISTER
FORMAT NO DESCRIPTION
SUB-GRADE
A-1 Particulars of Work
A-2 Properties of Sub grade material
A-3 Field Density Test
A-4 Dimension Chart
GRANULAR SUB BASE
A-5 (a,b,c) Gradation Test-Individual Aggregates-GSB Grade I
A-6 Mix Design Trials of GSB Grade I
A-7 Combined Grading at Yard before laying - GSB Grade I
Properties of GSB Grade I material collected at site and tested at
A-8
laboratory
A-9 (a,bc) Gradation Test-Individual Aggregates- Grade III
A-10 Mix Design Trials of GSB Grade III
A-11 Combined Grading at Yard before laying - GSB Grade III
Properties of GSB Grade III material collected at site and tested
A-12
at laboratory
WATER BOUND MACADAM
2
QUALITY ASSURANCE&RESEARCH A-1
QC REGISTER
DIVISION : SUBDIVISION :
NAME OF WORKStrengthening
: of Kullanchavadi-Kattugudalore road at km 11/6-
13/700 including Reconstruction of CD works at km 12/2
DATE OF AGREEMENT :
DATE OF COMMENCEMENT :
DATE OF COMPLETION :
LIABILITY PERIOD :
Note:
3
4
Widening from Single lane to Intermediate lane and
Improvements of Vadakkumelur-Keelur-Pacharapalayam road at
km 5/0-6/6
5
GSB GRADE - V
6
QUALITY ASSURANCE&RESEARCH
Nam of Work :
GRADATION TEST
Item of Work : GSB - V Location : Date :
Aggregate :45 mm size
Wt.
% of % of % of Stage of work
Sieve size mm Retained Remarks
wt.Rtg cum.Rtg Passing
gm
75 mm
53 mm
26.5 mm
9.5 mm
4.75 mm
2.36 mm
850 micron
425 micron
Pan
Total
53 mm
26.5 mm
9.5 mm
4.75 mm
2.36 mm
Total
7
QUALITY ASSURANCE&RESEARCH A-5-b
Name of Work :
GRADATION TEST
Item of Work : GSB - V Location : Date :
Aggegate :13.2 mm size
Weight
% of % of
Sieve size mm Retained % of Passing Remarks
wt.Rtg cum.wt Rtg
gm
75 mm
53 mm
26.5 mm
9.5 mm
4.75 mm
2.36 mm
850 micron
425 micron
Pan
Total
Aggregate :6.7mm size
Weight
% of % of
Sieve size mm Retained % of Passing Remarks
wt.Rtg cum.wt Rtg
gm
75 mm
53 mm
26.5 mm
9.5 mm
4.75 mm
2.36 mm
850 micron
425 micron
Pan
Total
8
HIGHWAYS RESEARCH STATION
Name of Work :
GRADATION TEST
Item of Work : GSB - V Location : Date :
Aggregate : 2.36 mm & below
Weight
Sieve %of cum.wt
Retained % of wt.Rtg % of Passing Remarks
size mm Rtg
gm
75 mm
53 mm
26.5 mm
9.5 mm
4.75 mm
2.36 mm
850 mic
425 mic
Total
Tested and calculated by Checked by
9
QUALITY ASSURANCE&RESEARCH
Name of Work :
MIX DESIGN
Item of Work : GSB - V Location :
Date :
Sieve 45 mm 26.5mm 11.2 mm 6.7 mm 2.36 mm & below MORTH
Total % Remarks
size mm Actual % Actual % Actual % Actual % Actual % Specifications
75 100
53 80-100
26.5 55-90
9.5 35-65
4.75 25-50
2.36 10-20
850 mic 2-10
425 mic 0-5
pan
Mix Proportion for GSB Max Dry Density of the mix in gm/cc OMC in % Remarks
10
QUALITY ASSURANCE&RESEARCH
Name of Work :
MIX GRADING
Item of Work : GSB - V Location : Date :
Sieve size Wt. Retained % of MORTH
% of wt.Rtg % of Passing Remarks
mm gm cum.Rtg Specifications
75 mm 100
53 mm 80-100
26.5 mm 55-90
9.5 mm 35-65
4.75 mm 25-50
2.36 mm 10-20
Pan
Total
11
12
13
GSB GRADE - III
14
QUALITY ASSURANCE&RESEARCH A-3
Name of Work :-
13 Wt. of container gm
15
16
WMM
17
QUALITY ASSURANCE&RESEARCH A19
Name of Work :
18
QUALITY ASSURANCE&RESEARCH A19
Name of Work :
19
QUALITY ASSURANCE&RESEARCH A-3
Name of Work :- Strengthening of Kullanchavadi-Kattugudalore road at km 9/6-11/6 including
Reconstruction of CD works at km 9/8 & 10/8
Type of Sample : Finer / Coarser Date :
Item of work : WMM Location :
FIELD DENSITY TEST - Sand Replacement Method
Dia of Cylinder : mm-small / 215 mm-large Max Dry Density of the mix : gm/cc (20)
A. Weight of sand in Cone in gm Stage of Work :
1 Wt. Of Sand before Pouring gm
2 Wt. Sand after Pouring gm
13 Wt. of container gm
20
Strengthening of Kullanchavadi-Kattugudalore road at km 11/6-13/700 including
Reconstruction of CD works at km 12/2
21
QUALITY ASSURANCE
&
RESEARCH
FIELD REGISTER
(fs¥gÂntL)
22
23
BM
24
25
26
27
28
QUALITY ASSURANCE&RESEARCH B-7
Name of Work : Strengthening of Kullanchavadi-Kattugudalore road at km 11/6-13/700
including Reconstruction of CD works at km 12/2
29
30
Strengthening of Kullanchavadi-Kattugudalore road at km 11/6-13/700
including Reconstruction of CD works at km 12/2
31
Strengthening of Kullanchavadi-Kattugudalore road at km 11/6-13/700
including Reconstruction of CD works at km 12/2
32
33
Improvements of Sethiyathoppu-Kammapuram road at km 4/0-6/0
& 7/0-10/0
34
DBM
35
36
37
38
39
40
Strengthening of Villupuram-Pondy-Nagapattinam road at km
100/4-101/6 (SH)
41
42
43
44
45
46
BC
47
48
49
50
51
QUALITY ASSURANCE&RESEARCH B - 19
Name of Work: Strengthening of Kullanchavadi-Kattugudalore road at km 11/6-13/700
including Reconstruction of CD works at km 12/2
52
53
54
.
55
56
Widening from Single lane to Intermediate lane and Improvements of