TOTAL AREA 1

% TO BE PAINTED 100.0%
AREA (in m²) 1

COAT NAME DFT %VS THINNING WFT TC (m²/L) %LOSS PC (m²/L)


COAT 1 600 100% 0.00% 600 1.667 20% 1.330
COAT 2 0 0.000 0.000
COAT 3 0 0.000 0.000
COAT 4 0 0.000 0.000
TOTAL DFT 600

THINNING
THINNER 1
THINNER 2
THINNER 3
THINNER 4
LTR/CAN PRICE/LTR PRICE/CAN LTRS/REQD. CANS REQD. COST
216 1.000 216.000 0.75 1 216.000
0.000 0.00 0 0.000
0.000 0.00 0 0.000
0.000 0.00 0 0.000
0.75 1
TOTAL COST FOR PAINT 216.000

LTR/CAN PRICE/LTR PRICE/CAN LTRS/REQD. CANS REQD. COST


20 1.000 20.000 0 0 0.000
0.000 0 0 0.000
0.000 0 0 0.000
0.000 0 0 0.000
0 0
TOTAL COST FOR THINNER 0.000
Area of pipe

Pipe Size 30 Inch


Length 40 Feet

Area 29.1715546 m²

Blasting Media
20kg/m² 16-20
6.9793 8.37516
1.39586