Professional Documents
Culture Documents
DMA C I: Esigned Xperiment LAN
DMA C I: Esigned Xperiment LAN
A. Project title:
B. DOE Dates:
1. Date Planned:
2. Date Executed:
C. Team Members:
E. Relevant Background:
F. Response Variable(s):
G. Control Variables:
Page 1 of 4
10/29/19
H. Expected Worst case (WOW) and Expected Best case (BOB) scenarios of above factors:
I. Results of two scenario trials (this should result in a safe experiment as well as produce a
measurable result---if not, reconsider the levels in section G):
Page 2 of 4
10/29/19
Page 3 of 4
10/29/19
P. Summary/Conclusion:
Page 4 of 4