1. CT04 – Create characteristics – ( Unit of measure – UOM) The same characteristics is used to create measuring point and
inspection characteristics Enter a limit this limit is written into inspection characteristics as upper and lower control limits to
verify the calibration results. When performing results recording via inspection lot.
2. QS21 - Master inspection characteristics Quantitative , Qualitative In Control indicators choose sample procedure
3. IE02 - create a measurement counter and note same characteristics
4. IA05 – Create a task list with required operations, Inspection point - 300 for equipment ,310 for functional location
Select operation and click on Inspection characteristics and provide Sample procedure or create using QDV1
5. IP41 - Create a maintenance plan with category – QM Enter the calibration task list and equipment’s and scheduling period
Use order type PM06 Inspection type – 14 for order which consider the order as calibration order
SPRO – PM&CS – maintenance and service processing – orders – Functions and settings for order types – Assign inspection
types to maintenance order types
6. IP10 – Schedule Maintenance plan, IP02 – Check call object, IW33 – ILAS denotes inspection lot and view inspection lot
7. Inspection lot – QA01 , QE51N – Perform results recording, QA11 – You can design user decision (UD) code with the follow up
activity like a mail or a notification ,Results in UD screen – Accepted, Rejected
Preventive maintenance: To avoid sudden breakdowns during operations, required to consider pre-measuring activities
known as preventive maintenance. Preventive Maintenance Concept is used to increase meantime between failures of the
equipment.
There are 3 types of preventive maintenance plans available.
1. Single Cycle Maintenance Plan – Time base (or) Performance base – IP41
IA05 - Create a task list using and plan for OPERATIONS and COMPONENTS.
CT04 - If we do for performance base, we need to create characteristics, then we need to create Counters for Equipment
IK01 and we need to initialize it using IK11, before creating a task list.
2. Strategy Maintenance Plan – Time base (or) Performance base - IP42
a. Create Strategy – IP11
b. CT04 - If we do for performance base, we need to create characteristics, then we need to create Counters for
Equipment IK01 and we need to initialize it using IK11, before creating a task list.
c. Create Task list With Strategies – IA05/IA01/IA11
d. Once Task List is created, Create Strategy Maintenance Plan using – IP42/IP01
e. Scheduling Strategy Maintenance Plan – IP10/IP30
f. Complete Generated Call Object.
3. Multiple Counter Maintenance Plan – Performance base (or) Performance & Time base. - IP43 counter IP11Z
Call Horizon Call horizon determines when a maintenance call object (e.g. Work Order, Notification) should be generated.
Example – Plan with 30 Day Cycle, 100% Horizon Call & Plan Dates are same, 50% Horizon Call Date is 15 Days before Plan
0% Horizon Call Date is 30 Days before Plan
Tolerance defines the period within which late or early completion impacts subsequent scheduling of Plan. (+)Tolerance is set
for late completion, (–) Tolerance for early completion. If completion is within Tolerance period it is not considered late or early
and does not impact schedule. If completion is out-with Tolerance period it will impact schedule taking account of Shift Factor
values.
Shift Factors the Shift Factor applies in event of late or early completion of Maintenance Task (Call Object).It defines how much
subsequent schedule dates will be changes as result of later or early completion.
Complete requirement if you tick complete requirement, it will not generate further call object unless until previous call object
is finished.
Cycle modification factorIs a concept which is used to increase or decrease cycle length Once the plan is active we can modify
only cycle modification factor only
IP10 – Schedule By comparing annual estimate the schedule dates are there in the schedule list
IP30 - Deadline monitoring Dead line Monitoring is a concept used for Scheduling Multiple Maintenance plans.T.CODE – IP30, it
is also called as batch input program or batch scheduling T.CODE.It will consider all modifications done in maintenance plans.
Job Scheduling will be done to run T.CODE IP30 at Regular intervals using SM36 T.CODE. Basis consultants will be doing batch
Scheduling.
Release Call: If we want to do maintenance Activity before Scheduled Time or sudden Breakdown happened to equipment
before scheduled time.
Fix Call: If we want to do an activity before or after planned date, we use fix call.
Skip Call: If the activity is completed or if the scheduled activity is not necessary at that moment then we use SKIP CALL.
TECO Directly: If we use TECO Directly it will complete the Call from Scheduling Area directly without completing pm order or
notification.
Manual Call: If we want to generate a call at respected period and even requires the scheduled call then we will be using
manual call.