RENCANA ANGGARAN BIAYA (RAB)

REHAB TEMPAT WUDLU MUSHOLLA


HARJOSARI LOR ADIWERNA TEGAL

No Uraian Pekerjaan Volume Harga Satuan (Rp) Jumlah (Rp) Total (Rp)
1 3 4 5 6
I Pekerjaan Bongkaran
1 Bongkar kolam lama 1.00 pkt 750,000.00 750,000.00
2 Bongkar sumur 1.00 pkt 150,000.00 150,000.00
3 Bongkar atap 18.00 m2 16,000.00 288,000.00
1,188,000.00
II Pekerjaan Pasangan
1 Pek. Pas. Bata merah 31.50 m2 140,000.00 4,410,000.00
2 Pek. Plester + Aci 40.00 m2 85,000.00 3,400,000.00
3 Pek. Keramik dinding 32.00 m2 140,000.00 4,480,000.00
4 Pek. Keramik lantai 18.00 m2 140,000.00 2,520,000.00
5 Pek. Tutup sumur 1.00 pkt 500,000.00 500,000.00
6 Pek. Pas. Kran air 1/2 12.00 bh 12,000.00 144,000.00
7 Pek. Instalasi air 15.00 m1 35,000.00 525,000.00
15,979,000.00
III Pekerjaan Atap + Pintu
1 Pek. Atap galvalum rk baja ringan 23.40 m2 170,000.00 3,978,000.00
2 Pek. Pintu KM WC 2.00 unit 180,000.00 360,000.00
3 Pek. Listrik 1.00 pkt 300,000.00 300,000.00
4 Pas. Cat dinding 40.00 m2 29,000.00 1,160,000.00
5,798,000.00

JUMLAH TOTAL 22,965,000.00