Professional Documents
Culture Documents
Storage Energy
Storage Energy
Storage Energy
PDO In-Sourcing Rigs
Discipline: Well Engineering
2
Table
Main contractor name of Contents
– LTI# - Date of incident
3
Main contractor name – LTI# - Date of incident
Rig Floor
4
1) Rig
Main contractor name – LTI# Floor
- Date of incident
ST80
1. 2100 PSI hydraulic operating
pressure 1
2. While utilizing or not utilizing
the hydraulic roughneck.
3. Hydraulic -> possibility of
sudden movement by the
integrated spinner
5
1) Rig
Main contractor name – LTI# Floor
- Date of incident
6
1) Rig
Main contractor name – LTI# Floor
- Date of incident
Manual Tongs
1. Tension line (slings on the side)
2. Potential energy – elevation
3. Hydraulic pressure cylinders
1
7
1) Rig
Main contractor name – LTI# Floor
- Date of incident
Air slips
1. High pressure air
2. Possibility of sudden
movement
3. Tension on slings attached to
air slips
4. Air pressure Safety clamp
8
1) Rig
Main contractor name – LTI# Floor
- Date of incident
BX elevator
1. Sudden movement
2. Elevation
3. Pressure in lines
9
1) Rig
Main contractor name – LTI# Floor
- Date of incident
TDS
1. Sudden movement
2. Elevation
3. Electrical hazard
4. Tension in drilling line
5. Hydraulic pressure
10
1) Rig
Main contractor name – LTI# Floor
- Date of incident
Manifold
1. High pressure
11
1) Rig
Main contractor name – LTI# Floor
- Date of incident
Handling Tubulars
1. Potential energy
2. Elevation
12
1) Rig
Main contractor name – LTI# Floor
- Date of incident
Rotary Table
1. Sudden movement
2. In case the lock does not work,
the rotary table will rotate.
13
1) Rig
Main contractor name – LTI# Floor
- Date of incident
Jar
1. Sudden piston activation
2. Potential
3. Float valve- spring
14
1) Rig
Main contractor name – LTI# Floor
- Date of incident
CRT
1. Hydraulic – sudden movement
2. Electrical hazard
3. Elevation
4. Hydraulic High pressure 1
15
1) Rig
Main contractor name – LTI# Floor
- Date of incident
Power Tong
1. Tension line
2. Sudden movement - hydraulic
3. High pressure
2
16
1) Rig
Main contractor name – LTI# Floor
- Date of incident
Spinner
1. Sudden movement
2. Tension line
3. High pressure
Rotary hose
1. Elevation
2. High pressure
3. Potential energy
17
Main contractor name – LTI# - Date of incident
Rig Carrier
18
2) Rig
Main contractor name – LTI# Carrier
- Date of incident
19
2) Rig
Main contractor name – LTI# Carrier
- Date of incident
Draw works
1. Sudden rotation 2
2. Tension line
1
3. Electricity
4. Pneumatic
20
2) Rig
Main contractor name – LTI# Carrier
- Date of incident
HPU
1. Hydraulic – high pressure.
2. Electric power
1
21
2) Rig
Main contractor name – LTI# Carrier
- Date of incident
Bottles
1. High pressure trapped
Pumps
1. Electrical 1,2
2. Rotary movement
Pressure line
1. High pressure
22
2) Rig
Main contractor name – LTI# Carrier
- Date of incident
Hydraulic Jacks
1. High pressure
2. Sudden movement 1
Tires
1. Air pressure
23
2) Rig
Main contractor name – LTI# carrier
- Date of incident
24
2) Rig
Main contractor name – LTI# Carrier
- Date of incident
Electric Blower
1. Electricity
1
2. Mechanical
2
25
2) Rig
Main contractor name – LTI# Carrier
- Date of incident
Storage Reel
1. Sudden rotation
2. Tension line
3. Hydraulic
26
2) Rig
Main contractor name – LTI# Carrier
- Date of incident
27
Main contractor name – LTI# - Date of incident
Mud Pumps
28
3) Mud
Main contractor name – LTI# Pumps
- Date of incident
Mud pump
1. Sudden movement of pistons.
2. Electricity 1
3. High pressure in lines,
2
dampener and pop off valve.
4. Air connection pressure
29
3
Main contractor name – LTI# - Date of incident
Mud Tanks
30
4) Mud
Main contractor name – LTI# Tanks
- Date of incident
Mud tanks
1. Agitator
2. Electricity
Shale Shaker
1. Electricity
2. Mechanical
31
4) Mud
Main contractor name – LTI# Tanks
- Date of incident
Desilter
1. Pressure line
Degasser (Compressor)
2
1. Electrical
2. Trapped pressure (gas) 1
32
4) Mud
Main contractor name – LTI# Tanks
- Date of incident
Discharge pumps
1. Electric 1,2
2. Rotary
3. Pressure line
Germane pump
1. Electrical
2. Pressure 1
2
33
4) Mud
Main contractor name – LTI# Tanks
- Date of incident
Fire pumps
1. Electric
2. Moving piston
3. High pressure
34
4)Mud
Main contractor name – LTI# Tanks
- Date of incident
35
Main contractor name – LTI# - Date of incident
Pipe Cat
36
5) Pipe
Main contractor name – LTI# Cat
- Date of incident
Pipe cat 3
1. Tension line 1
2. Electricity (motor)
3. Hydraulic pressure
4. Elevation of object carried
in pipe cat
37
Main contractor name – LTI# - Date of incident
BOP Area
38
6) BOP
Main contractor name – LTI# Area
- Date of incident
BOP
1. hydraulic pressure
2. Sudden moving rams
3. Air pressure
39
6) BOP
Main contractor name – LTI# Area
- Date of incident
Bop wench:
1. Hydraulic line
2. Elevation
40
6) BOP
Main contractor name – LTI# Area
- Date of incident
Cellar pump
1. Electricity 2
2. High pressure
1
41
6) BOP
Main contractor name – LTI# Area
- Date of incident
Stripping bottle
1. High pressure
Air bottle
1. High pressure
42
Main contractor name – LTI# - Date of incident
43
7) Run
Main contractor name – LTI# off area
- Date of incident
44
7) Run
Main contractor name – LTI# off area
- Date of incident
Tower Light
1
1. Electricity
2. Elevation
Welding machine
1. Electricity 2
2. Pressure oil
1
45
7) Run
Main contractor name – LTI# off area
- Date of incident
Portable Compressor
1. Air pressure
2. Electricity
46
7) Run
Main contractor name – LTI# off area
- Date of incident
Fork lift
1. Hydraulic pressure
2. Elevation
3. Air pressure (tire)
Crane
1. Hydraulic pressure
2. Elevation
3. Air pressure (tire)
47
7) Run
Main contractor name – LTI# off area
- Date of incident
48
Main contractor name – LTI# - Date of incident
Engine Room
49
Main contractor name – 8) Engine
LTI# Room
- Date of incident
Engine
1. Rotating Fans
1
2. Moving piston
3. High pressure oil 2,3
4. Electric motor\high voltage
50
Main contractor name – 8) Engine
LTI# Room
- Date of incident
Transformer
1. Electric
Air compressor
1. Electric
2. Air pressure
51
Main contractor name – 8) Engine
LTI# Room
- Date of incident
VFD room
1. Electricity
52
Main contractor name – LTI# - Date of incident
53
Main contractor name 9) Diesel
– LTI# Tankof
- Date Area
incident
Emergency generator
1. Electric
2. High pressure
3. Moving piston
4. Change over switch:
5. Electric
54
Main contractor name 9) Diesel
– LTI# Tankof
- Date Area
incident
1,2
1,2
55
10)–Mechanical
Main contractor name LTI# - Dateworkshop
of incident
Mechanic workshop
1. Air pressure
2. Electricity
3. Moving machinery (rotating or drilling)
56
Main contractor name11) Welder
– LTI# workshop
- Date of incident
Welder workshop
1. Air pressure
2. Gas pressure
3. electricity
57