MEASI ACADEMY OF ARCHITECTURE FACULTY INCHARGE : Ar.

SUHASINI
ENGINEERING CAMPUS PLANNING Ar. HARIHARAN
ARCHITECTURAL DESIGN IV Ar. SASIKALA
5TH SEMESTER C SEC
S.NO DESCRIPTION SQM QUANTITY
1. Principal/ Director 30
Office

2. Principal toilet 10
3 Conference room 100
4. Conference room 12
toilet
5 Store room 20
6. reception 25
7. Main office 300
8. Admin office 20
9. Maintenance office 40

10. Pantry 20
11. Exam cell 25
12. Staff toilet 15
TOTAL 617
FIRST YEAR DEPARTMENT
1. Drawing hall 175 1
2. Physics lab 200
3. Chemistry lab 200
4. Mechanics and 100
kinematics lab
5. Material testing 200
and strength of
material
6. Computer centre 200
7. workshop 900

8. 4 lecture halls Each 100


Total 400
9. lobby feasible
10. Staircase and Not more than
circulation 20%
11. Staffroom (12 staffs 120
10 sqm each)
12. Men toilets 8 no’s
13. Women toilets 8 no’s
14. Lunch room 20
15. reprography 20
16. store 10
17. Dean room + toilet 25
TOTAL 2570
CIVIL ENGG DEPARTMENT
1. Structural analysis 300
lab
2. Fluid mechanics 400
L Engineering 135
3. A geology lab
4. B Geotechnical engg 270
5. S Transportation 270
engg
6. Environmental engg 270
7. surveying 100
8. Cad lab 75
10 Building materials/ 200
concrete lab
11. Soil mechanics 100
13. Typical for all 3 classroom each 100 total 300
department
14. Students toilet
15. Seminar room 300
16. Department office 25
17. Department library 30
18. HOD+toilet 25
19. staffroom 100
20 reprography 20
21 Store 10
22 Pantry 10
TOTAL 2940
MECHANICAL ENGG DEPARTMENT
1. Thermal science( 500
stream,
IC,Refrigeration,and
heat transfer
2. Fluid mechanics 200
and machinery fluid
lab
3. measurement 100
4. Dynamics of 100
machine
5. metrology 100
6. Machine tools 100
7. Strength of 200
material lab
8. Typical for all 3 classroom each 100 total 300
department
9. Students toilet
10. Seminar room 300
11. Department office 25
12. Department library 30
13. HOD+toilet 25
14. staffroom 100
15. reprography 20
16. Store 10
17. Pantry 10
TOTAL 2120
ELECTRICAL ENGG DEPARTMENT
1. Electrical machines 350
2. Power system 150
production
3. Measurement and 150
instrument
4. Control system 100
5. Micro process 100
6. Applied electronic/ 100
project
7. Computer and 50
stimulation lab
8. Electric drives lab 150
9. Network lab 50
10. Typical for all 3 classroom each 100 total 300
department
11. Students toilet
12. Seminar room 300
13. Department office 25
14. Department library 30
15. HOD+toilet 25
16. staffroom 100
17. reprography 20
18. Store 10
19. pantry 10
TOTAL 2020
COMPUTER ENGG DEPARTMENT
1. Computer software 70
2. Computer 100
hardware and
micro process
3. Computer graphics 100
4. Computer design 70
5. Web technology lab 50
6. Networking lab 50

13. Typical for all 3 classroom each 100 total 300


department
14. Students toilet
15. Seminar room 300
16. Department office 25
17. Department library 30
18. HOD +toilet 25
19. staffroom 100
20 reprography 20
21 Store 10
22. pantry 10
TOTAL 1260
CENTRAL LIBRARY BLOCK
1. Stack area 600 4000 to 6000 vol

Reading area 100 people


2. Digital library
3. reprography
4. Document
scanning/printing
6. Lobby
Service desk
8. Storage area
9. Program rooms
10 restrooms
11. Staff workroom
12. Other Support
spaces
TOTAL 600+
Canteen
1. Canteen 240 To be calculated
2. kitchen 150
3. Storage area/utility To be calculated
4 Service/building
counter
TOTAL 390
Other amenities
1 Student activity 250
centre (indoor
games)
2. Auditorium (to be 400 people
zoned)
3. Multipurpose hall ( 200 people
to be zoned)
4. Cricket field, 25000
football, volleyball,
basketball
TOTAL 25250

1. Residential to be 1 acre
zoned
Total site area: 66,712 sqm
Plot coverage : 40%
FSI – 1.5(g+3)
OSR= 10%
Total built up area- 37767+10%(3776)+circulation 10000(.25) = 51543sqm
Entry- Turning radius- 9m

According to CMD rules 18m entry

Pedestrian pathway- 2.5m

Parking area/slots (two-wheeler/car/bus)- for every 100sqm one car.

For every 50sqm 1, two wheelers.

Bus parking- 40 students in a bus (design accordingly)

FSI- 1.5- 15m Tall (g+3or stilt+4)

Parapet <1m

Plot coverage- 40%

Set back area- 6m (all edges)

Compound wall – Height 2m

Security cabin – 2.5x2.5m (in setback)

Minimum distance between entry and exit- 22.5m (inside the building)

Physically challenged- 2 cars max travel distance 30m- 3.6mx5m

OSR- 10%, minimum 10m width

Light travel distance- 7.5m

Corridor width- 2m

Transformer-10x4m, 5x5m , OTS having an approach of width – not less than 3m

Electrical room- 6mx7m (vehicle clearance, height- 2.75m RCC roof, steel rolling shutter<3m

Water tank for population (950 people=250cubicm)

Auditorium- 150sqm- 1.5sqm/ person