No.

Scope Input/receival

WR- work request


3 Preparation, addition, finalization of DCSM included plan
Turnaround Work list schedule

Defect detected by
1 Categorization of Work items NSRP
59 Defect detected
2 Defect confirmation by NSRP

Defect is JGCS
Responsibility

Defect is not JGCS


but NSRP response
Output Sub PIC
Process, Operations, Maintenance,
Tracking and status Inspection, and Engineering, Safety,
WR evaluation DCSM co-ordinator
technical, commercial, importance,
Duration and Cost availability of resources

Rectified by EPC or
Maintainance?

NSRP or JGCS resposibility?

NSRP issue DN, JGCS site work


report (JGCS QC, NSRP Rep')

NSRP withdrawn the DN, NSRP


site work report (DCSM
contractor QC, NSRP Rep')
Remark
1 Statutory or company inspection requirements. From inspection team For defect confirmation
2 Corrective maintenance on known defects. Rectified by Subcon
3 Preventive maintenance From inspection team
4 Plant cleaning routines. From NSRP
5 Safety and quality initiatives. From NSRP
For defect confirmation
Meeting daily

Hand over meeting


DSCM TA plan ?
Log for each Unit?
RFCC: RESIDUAL FLUID CATALITIC CRACKER
InALK: INDIRECT ALKYLATION
PPU: POLYPROPYLENE UNIT
SWS: SOUR WATER STRIPER