Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

Nomor Pokok Mahasiswa Nama Mahasiswa

: 1531310007
Student Registration Number Name of the Student
Jurusan Teknik Sipil Program Studi
:
Major Civil Engineering Study Program

NO. KODE MATA KULIAH / SUBJECTS


1 RSII51001 Bahasa Indonesia / Indonesian for Engineering
2 RSII51002 Gambar Teknik Dasar / Basic Technical
3 RSII51003 Ilmu Ukur Tanah I / Surveying I
4 RSII51004 Kesehatan dan Keselamatan Kerja / Health and Safety Arrangement
5 RSII51005 Matematika Terapan / Apllied Mathematics
6 RSII51006 Mekanika Rekayasa I / Engineering Mechanics I
7 RSII51007 Pancasila / Pancasila
8 RSII51008 Pendidikan Kewarganegaraan / Civic Education
9 RSII51009 Praktek Batu / Masonry Workshop
10 RSII51010 Teknologi Bahan / Material Technology
11 RSII52001 Dasar-dasar Manajemen Konstruksi / Basic Construction Management
12 RSII52002 Gambar Teknik Terapan / Applied Technical Drawings
13 RSII52003 Ilmu Ukur Tanah II / Surveying II
14 RSII52004 Pendidikan Agama / Religion Education
15 RSII52005 Laboratorium Uji Bahan / Material Testing
16 RSII52006 Mekanika Rekayasa II / Engineering Mechanics II
17 RSII52007 Mekanika Tanah I / Soil Mechanics I
18 RSII52008 Praktek Kayu / Carpentry Workshop
19 RSII52009 Praktek Perpipaan / Plumbing Workshop
20 RSII53001 Alat Berat / Heavy Equipment
21 RSII53002 Geometrik Jalan Raya / Highway Geometry
22 RSII53003 Hidrolika Terapan / Applied Hydraulics
23 RSII53004 Mekanika Rekayasa III / Engineering Mechanics III
24 RSII53005 Mekanika Tanah II / Soil Mechanics II
25 RSII53006 Penjadwalan dan Estimasi Biaya / Cost Estimation and Scheduling
26 RSII53007 Praktek Drainase / Drainage Workshop
27 RSII53008 Statistik Terapan / Applied Statistics
28 RSII53009 Struktur Baja I / Steel Structure I
29 RSII53010 Struktur Beton I / Concrete Structure I
30 RSII54201 Aplikasi Komputer / Computer Application
31 RSII54202 Bahasa Inggris Teknik I / English for Engineering I
32 RSII54203 Irigasi / Irrigation
33 RSII54204 Mekanika Rekayasa IV / Engineering Mechanics IV
34 RSII54205 Pengadaan Barang dan Jasa / Procurement
35 RSII54206 Praktek Bangunan Jalan / Road Construction Workshop
36 RSII54207 Praktek Beton / Concrete Workshop
37 RSII54208 Rekayasa Pondasi / Foundation Engineering
38 RSII54209 Struktur Beton II / Concrete Structure II
39 RSII54210 Teknik Lalu Lintas / Traffic Engineering
40 RSII55201 Bahasa Inggris Teknik II / English for Engineering II
41 RSII55202 Drainase Perkotaan / Urban Drainage System
42 RSII55203 Ekonomi Rekayasa / Engineering Economics
43 RSII55204 Konstruksi Bangunan Sipil / Civil Construction
44 RSII55205 Kewirausahaan / Entrepreneurship
45 RSII55206 Pengelolaan Air Bersih / Kotor / Waste / Clean Water Management
46 RSII55207 Perkerasan Jalan Raya / Road Pavement
47 RSII55208 Praktek Acuan dan Perancah / Formwork Workshop
48 RSII55209 Praktek Baja / Steel Workshop
49 RSII55210 Rekayasa Lingkungan / Environment Engineering
50 RSII55211 Struktur Jembatan / Bridge Structure
51 RSII56201 Administrasi Proyek / Project Administration
52 RSII56202 Bahasa Inggris Bisnis / Business Project
53 RSII56203 Laporan Akhir / Final Project
54 RSII56204 Praktek Kerja Lapangan / On the Job Training
Jumlah
Indeks Prestasi Kumulatif
keterangan : tanda (*) = matakuliah konversi / ekuivalensi

Nama Mahasiswa / Name of the Student :


Nomor Pokok Mahasiswa / Student Registration Number :
Tempat, Tanggal Lahir / Place and Date of Birth :
Judul Laporan Akhir / Title of Final Report :

Praktek Kerja Lapangan di / On The Job Training was carried at :


Lulus dengan Predikat / Result :
Tanggal Lulus / Name of the Student :

Predikat Kelulusan / Honors IPK / GPA


Dengan Pujian / Cumlaude 3,51 - 4,00
Sangat Memuaskan / Very Satisfactory 2,76 - 3,50
Memuaskan / Satisfactory 2,00 - 2,75
Nama Mahasiswa
: Faradilla Pradiani Utami
Name of the Student
Program Studi D-III T. Sipil
:
Study Program Civil Engineering

UBJECTS SMT SKS NILAI


I 2 B+
I 2 C+
I 3 B+
afety Arrangement I 2 A
I 2 B+
I 2 B+
I 2 A
I 2 B+
I 2 B+
I 3 B+
ruction Management II 2 A
II 2 C
II 3 B
II 2 A
II 2 A
II 2 A
II 3 A
II 2 B
II 2 B+
III 2 A
III 2 B
III 2 A
III 2 A
III 3 B+
n and Scheduling III 2 B+
III 2 B+
III 2 A
III 2 A
III 2 A
IV 2 A
IV 2 B+
IV 2 B
IV 2 B+
IV 2 B
IV 2 B+
IV 2 B+
IV 3 B+
IV 3 B
IV 2 B+
V 2 B
V 2 B+
V 2 A
V 2 B+
V 2 B
ter Management V 2 A
V 2 B+
V 2 B
V 2 B
V 2 A
V 2 A
VI 2 B
VI 2 B+
VI 5 B+
VI 3 A
119
3.53

Faradilla Pradiani Utami


1531310007
Sumenep, 10 Nopember 1997
Metode Pelaksanaan dan Produktivitas Alat Berat pada
Pembangunan Spillway Bendungan Bendo Kabupaten Ponorogo,
Jawa Timur / Implementation Method And Heavy Equipments
Productivity Of Spillway Project Of Bendo Dam Ponorogo
District, East Java
PT WIKA - HUTAMA - NINDYA KSO
Dengan Pujian / Cumlaude
02 Juli 2018

Bobot Nilai / Grade Points


A = 4
B+ = 3,5
B = 3
C+ = 2,5
C = 2
D = 1
E = 0

You might also like