The document outlines revisions made to the scope of works, bill of quantities, and proposal for a project involving the installation of air conditioners and exhaust fans at a temporary facility area. Key revisions include clarifying that material supply for air conditioners includes necessary accessories, specifying maintenance will include cleaning and refrigerant refills every three months after installation, and providing additional details on specifications and quantities in the bill of quantities.
The document outlines revisions made to the scope of works, bill of quantities, and proposal for a project involving the installation of air conditioners and exhaust fans at a temporary facility area. Key revisions include clarifying that material supply for air conditioners includes necessary accessories, specifying maintenance will include cleaning and refrigerant refills every three months after installation, and providing additional details on specifications and quantities in the bill of quantities.
The document outlines revisions made to the scope of works, bill of quantities, and proposal for a project involving the installation of air conditioners and exhaust fans at a temporary facility area. Key revisions include clarifying that material supply for air conditioners includes necessary accessories, specifying maintenance will include cleaning and refrigerant refills every three months after installation, and providing additional details on specifications and quantities in the bill of quantities.
Work: AC and Exhaust Fan Installation at Temporary Facility Area (Temporary Facility Package-12) Part No. & Description No. Remarks Before Revision After Revision
1 ANNEX 3_Scope of Works (Exhibit B)
a Construction work: Construction work: Installation of AC and exhaust fan Installation of AC (include with necessary accessories: cable, duct, refrigerant, pipe, tube, and others) and exhaust fan b Maintenance: Maintenance: Maintenance service every three months after Maintenance service every three months after completed installation completed installation Note: Maintenance include for cleaning (internal flushing, outside brushing and necessary activities), and refill for refrigerant. The remaining refill-refrigerant supplied by Subcontractor will become the property of the Contractor. C Material supply: Air Conditioning (AC) 2 PK and 1 Material supply: Air Conditioning (AC) 2 PK PK and 1 PK (include with necessary accessories: cable, duct, refrigerant, pipe, tube, and others)
2 ANNEX 8_Bill of Quantities and Unit Rates (Annex 8.1)
a Maintenance: Maintenance: Total maintenance for Exhaust -Quantity = 1 -Quantity = 14382 fan is (374)* -Free-service period : (filled by Subcontractor) -Free-service period : 6 months ((5years*4times/year) - (free- -note: unit rate price per service per unit AC -note: service period=2times)) a. Maintenance service every 3 (three) months after free-service period Total maintenance for AC is b. Maintenance include for cleaning, and refill (334+465)* for refrigerant ((5years*4times/year) - (free- service period=2times)) b Optional: Optional: -N/A -Replacement for spareparts c Notes : Notes : Subcontractor shall mention brand of AC and Subcontractor shall mention brand and Exhaust Fan specification of AC, refrigerant, pipe, tube, cable, Exhaust Fan, and necessary items 3 ANNEX 11_Subcontractor's Proposal a Title: Title: N/A AC AND EXHAUST FAN INSTALLATION AT TEMPORARY FACILITY AREA (TEMPORARY FACILITY PACKAGE-12)