Polytechnic University of The Philippines Santa Maria Bulacan

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GENERAL NOTES: OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL 6.

CONTRACTOR TO PROVIDE FOR DE WATERING OF EXCAVATIONS


ENGINEER SHALL NOT INCLUDE INSPECTION OF THE ABOVE FROM EITHER SURFACE WATER, GROUND WATER OR SEEPAGE.
1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN ITEMS.
7. CONTRACTOR SHALL PROVIDE FOR DESIGN AND INSTALLATION
MILLIMETERS AND ELEVATION LEVELS ARE IN METERS. OF ALL CRIBBING, SHEATHING AND SHORING REQUIRED TO
14. OPENINGS, POCKETS, ETC. SHALL NOT BE PLACED IN SAFELY RETAIN THE EARTH BANKS.
2. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN STRUCTURAL MEMBERS UNLESS SPECIFICALLY DETAILED ON
THE STRUCTURAL DRAWINGS. 8. EXCAVATION AND COMPACTING IF REQUIRED, SHALL BE
APPROVED BY THE GOVERNING AGENCY AND THE FOUNDATION
3. PRIOR TO WORK COMMENCEMENT, CONTRACTOR SHALL VERIFY
15. SPECIFICATION, CODES AND STANDARDS NOTED IN THE ENGINEER PRIOR TO PLACING THE CONCRETE AND REINFORCING.
ALL EXISTING CONDITIONS ON SITE & SECURE NECESSARY FOUNDATION ENGINEER TO SUBMIT LETTER OF COMPLIANCE TO
PERMITS FOR CONSTRUCTION. CONTRACT DOCUMENTS SHALL BE OF THE LATEST APPROVED
OWNER.
ISSUE, INCLUDING SUPPLEMENTS, UNLESS OTHERWISE
4. CONTRACTOR TO SUBMIT SHOP DRAWINGS AND SAMPLES OF NOTED. MATERIAL SPECIFICATIONS ARE ASTM LATEST 9. ALL EXCAVATION SHALL BE PROPERLY BACKFILLED. DO NOT
EDITION. PLACE BACKFILL BEHIND RETAINING WALLS BEFORE WALLS HAVE
ALL MATERIALS AND COLORS FOR CONSULTANT'S APPROVAL.
ATTAINED FULL DESIGN STRENGTH. CONTRACTOR SHALL BRACE
16. THE CONTRACTOR SHALL INVESTIGATE SITE FOR FILLED OR PROTECT ALL BUILDING AND PIT WALLS BELOW GRADE FROM
5. COORDINATION BETWEEN ARCHITECTURAL DRAWINGS AND ALL LATERAL LOADS UNTIL ATTACHING FLOORS ARE COMPLETELY IN
EXCAVATIONS OR BURIED STRUCTURES SUCH AS SEPTIC
OTHER ENGINEERING DRAWINGS SHALL BE MAIN CONTRACTORS'S PLACE AND HAVE ATTAINED FULL STRENGTH. CONTRACTOR
TANK, CISTERN, FOUNDATIONS, ETC. IF ANY SUCH SHALL PROVIDE FOR DESIGN, PERMITS AND INSTALLATION OF
RESPONSIBILITY PRIOR TO ANY WORK.
STRUCTURES ARE FOUND, ARCHITECT SHALL BE NOTIFIED SUCH BRACING.
IMMEDIATELY.
6. ALL TOILET & KITCHEN AREAS TO BE PROVIDED WITH WATER 10. FOOTINGS SHALL BE PLACED AND ESTIMATED ACCORDING TO
PROOFING MEMBRANE LAID ON TOP OF STRUCTURE SLAB AND 17. CONSTRUCTION MATERIALS SHALL BE SPREAD OUT IF DEPTHS SHOWN ON DRAWINGS. SHOULD SOIL ENCOUNTER AT
EXTENDED 200mm HIGH ON WALL ABOVE FINISH FLOOR LEVEL. PLACED ON FRAMED FLOORS OR ROOFS. LOAD SHALL NOT THESE DEPTHS NOT BE APPROVED BY THE FOUNDATION
ENGINEER, FOOTING ELEVATIONS WILL BE ALTERED AS REQUIRED.
EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT. PROVIDE
7. ALL SIZES SHOWN FOR WINDOWS, DOORS AND ARCHES ARE ADEQUATE SHORING AND/OR BRACING WHERE STRUCTURE 11. FOOTING BACKFILL AND UTILITY TRENCH BACK FILL WITHIN
MASONRY OPENINGS, CONTRACTOR TO VERIFY ALL DIMENSIONS HAS NOT ATTAINED DESIGNS BUILDING AREA SHALL BE MECHANICALLY COMPACTED IN LAYERS,
ON SITE. IN ACCORDANCE WITH SOIL REPORT. FLOODING WILL NOT BE
8. PAINT COLOR SHALL BE SELECTED BY THE CONSULTANT. PERMITTED.

9. ARCHITECTURAL DRAWINGS DO NOT SHOW SIZE OF 12. ALL ABANDONED FOOTINGS, UTILITIES, ETC., THAT INTERFERE
NOTES ON FOUNDATION WITH NEW CONSTRUCTION SHALL BE REMOVED.
STRUCTURAL ELEMENTS FOSIZE`S AND PLACING OF STRUCTURAL
ELEMENTS SEE STRUCTURAL DRAWINGS.R 1. FOUNDATION DESIGN BASED ON SOIL REPORT BY THE 13. ALL EARTHWORK SHALL BE DONE IN ACCORDANCE WITH SOILS
FOLLOWING REPORT RECOMMENDATIONS.
10. FOR EXACT LOCATION OF ROOF OPENINGS FOR DUCTS, PIPING COMPANY:___________________________________________
AND FANS SEE STRUCTURAL DRAWINGS. DATED___________ AND ALL SUBSEQUENT ADDENDA. COPIES
ARE AVAILABLE FOR REVIEW AT THE ARCHITECT'S OFFICE
11. FIRE RATING APPLY THROUGH OUT THE DESIGNATED ROOM TO
ALL ENCLOSING ELEMENTS INCLUDING DOORS. 2. FOOTING DESIGN BASED ON ALLOWABLE PRESSURE OF
2000 kpa. BOTTOM OF FOOTINGS SHALL REST 1.50 METERS
12. UNLESS OTHERWISE INDICATED ON FLOOR PLANS. ALL DOOR BELOW EXISTING GRADE LEVEL.
OPENINGS SHALL BE LOCATED NOT LESS THAN 200mm (HALF
CONCRETE BLOCK DIMENSION) FROM THE EDGE OF INTERSECTING 3. NO FOOTING SHALL REST ON FILL.
WALL OR COLUMN.

13. THE CONTRACT DOCUMENTS REPRESENT THE 4. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT
SHALL BE 75 mm FOR CONCRETE DEPOSITED AGAINST THE
FINISHED STRUCTURE. THEY DO NOT INDICATE THE
GROUND.
METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL
PROVIDE ALL MEASURES NECESSARY TO PROTECT THE 5. SLABS ON GRADE FOR BUILDINGS SHALL BE SUPPORTED ON
STRUCTURE DURING CONSTRUCTION. SUCH MEASURE ENGINEERED COMPACTED FILL. COMPACTION SHALL BE NOT
SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING, LESS THAN 90% OF OPTIMUM DENSITY AND SHALL CONFORM
SHORING FOR LOADS DUE TO CONSTRUCTION TO ASTM D1557.
EQUIPMENT, ETC.

REPUBLIC OF THE PHILIPPINES


POLYTECHNIC UNIVERSITY OF THE PHILIPPINES 2
SANTA MARIA BULACAN
A 6

You might also like