9. ARCHITECTURAL DRAWINGS DO NOT SHOW SIZE OF 12. ALL ABANDONED FOOTINGS, UTILITIES, ETC., THAT INTERFERE
NOTES ON FOUNDATION WITH NEW CONSTRUCTION SHALL BE REMOVED.
STRUCTURAL ELEMENTS FOSIZE`S AND PLACING OF STRUCTURAL
ELEMENTS SEE STRUCTURAL DRAWINGS.R 1. FOUNDATION DESIGN BASED ON SOIL REPORT BY THE 13. ALL EARTHWORK SHALL BE DONE IN ACCORDANCE WITH SOILS
FOLLOWING REPORT RECOMMENDATIONS.
10. FOR EXACT LOCATION OF ROOF OPENINGS FOR DUCTS, PIPING COMPANY:___________________________________________
AND FANS SEE STRUCTURAL DRAWINGS. DATED___________ AND ALL SUBSEQUENT ADDENDA. COPIES
ARE AVAILABLE FOR REVIEW AT THE ARCHITECT'S OFFICE
11. FIRE RATING APPLY THROUGH OUT THE DESIGNATED ROOM TO
ALL ENCLOSING ELEMENTS INCLUDING DOORS. 2. FOOTING DESIGN BASED ON ALLOWABLE PRESSURE OF
2000 kpa. BOTTOM OF FOOTINGS SHALL REST 1.50 METERS
12. UNLESS OTHERWISE INDICATED ON FLOOR PLANS. ALL DOOR BELOW EXISTING GRADE LEVEL.
OPENINGS SHALL BE LOCATED NOT LESS THAN 200mm (HALF
CONCRETE BLOCK DIMENSION) FROM THE EDGE OF INTERSECTING 3. NO FOOTING SHALL REST ON FILL.
WALL OR COLUMN.
13. THE CONTRACT DOCUMENTS REPRESENT THE 4. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT
SHALL BE 75 mm FOR CONCRETE DEPOSITED AGAINST THE
FINISHED STRUCTURE. THEY DO NOT INDICATE THE
GROUND.
METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL
PROVIDE ALL MEASURES NECESSARY TO PROTECT THE 5. SLABS ON GRADE FOR BUILDINGS SHALL BE SUPPORTED ON
STRUCTURE DURING CONSTRUCTION. SUCH MEASURE ENGINEERED COMPACTED FILL. COMPACTION SHALL BE NOT
SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING, LESS THAN 90% OF OPTIMUM DENSITY AND SHALL CONFORM
SHORING FOR LOADS DUE TO CONSTRUCTION TO ASTM D1557.
EQUIPMENT, ETC.