Salient Features of Gouravelly Reservoir

Name of work: Formation of Gouravelly Reservoir with


enhanced capacity from 1.410 TMC to 8.230
TMC water including construction of H.C.
Weir, Formation of Earth Dam, L/s & R/s
Head Regulators, Formation of Diversion Road
including construction of DLR Bridges,
Investigation, Designing and Estimation near
Gouravelly (V), Akkannapeta (M), Siddipet
District”
Amount of Contract: Rs.540.9002 Crore T.P @ (-)27.37%.
Capacity Of Gouravelly 8.23 TMC
Reservoir:
Components involved in Construction of
this work are: 1.H.C. Weir,
2.Formation of Earth Dam,
3.L/s R/s Head Regulators,
4.Formation of Diversion Road including
construction of DLR Bridges
T.B.L +419.300
M.D.D.L +393.800
F.R.L +415.000
Maximum ht.of Earthen 41.62m
bund
Crest level of HC weir +415.000
Length of the Bund 8.389KM
Location and Length of @KM9.100, length 116.10m (Proposed)
weir
Diversion Road 10.400KM (Proposed)