The document outlines the salient features of the Gouravelly Reservoir project in Siddipet District, Telangana. The key components of the Rs. 540.9002 crore project include constructing an H.C. weir, earth dam, and head regulators, as well as building a diversion road and DLR bridges to increase the reservoir's capacity from 1.410 TMC to 8.230 TMC. The earthen bund will be 41.62m high and 8.389km long, and the H.C. weir will have a crest level of +415.000 and is proposed to be 116.10m long at KM9.100. A 10.400km
The document outlines the salient features of the Gouravelly Reservoir project in Siddipet District, Telangana. The key components of the Rs. 540.9002 crore project include constructing an H.C. weir, earth dam, and head regulators, as well as building a diversion road and DLR bridges to increase the reservoir's capacity from 1.410 TMC to 8.230 TMC. The earthen bund will be 41.62m high and 8.389km long, and the H.C. weir will have a crest level of +415.000 and is proposed to be 116.10m long at KM9.100. A 10.400km
The document outlines the salient features of the Gouravelly Reservoir project in Siddipet District, Telangana. The key components of the Rs. 540.9002 crore project include constructing an H.C. weir, earth dam, and head regulators, as well as building a diversion road and DLR bridges to increase the reservoir's capacity from 1.410 TMC to 8.230 TMC. The earthen bund will be 41.62m high and 8.389km long, and the H.C. weir will have a crest level of +415.000 and is proposed to be 116.10m long at KM9.100. A 10.400km
Name of work: Formation of Gouravelly Reservoir with
enhanced capacity from 1.410 TMC to 8.230 TMC water including construction of H.C. Weir, Formation of Earth Dam, L/s & R/s Head Regulators, Formation of Diversion Road including construction of DLR Bridges, Investigation, Designing and Estimation near Gouravelly (V), Akkannapeta (M), Siddipet District” Amount of Contract: Rs.540.9002 Crore T.P @ (-)27.37%. Capacity Of Gouravelly 8.23 TMC Reservoir: Components involved in Construction of this work are: 1.H.C. Weir, 2.Formation of Earth Dam, 3.L/s R/s Head Regulators, 4.Formation of Diversion Road including construction of DLR Bridges T.B.L +419.300 M.D.D.L +393.800 F.R.L +415.000 Maximum ht.of Earthen 41.62m bund Crest level of HC weir +415.000 Length of the Bund 8.389KM Location and Length of @KM9.100, length 116.10m (Proposed) weir Diversion Road 10.400KM (Proposed)
Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910, Start/End Papers
The New York Tunnel Extension of the Pennsylvania Railroad