Quality Control 2013: Skycoat, LLC
Quality Control 2013: Skycoat, LLC
2013
www.skycoat.com/qc
SKYCOAT specializes in powder coating, conversion coating, and
media blasting.
SKYCOAT, LLC
Owner– Patrick Traynor
Quality Control Manager-Lacey Traynor
Production Manager-Terry Campbell
SKYCOAT, LLC QUALITY CONTROL MANUAL
TABLE OF CONTENTS
a) PURPOSE
b) PROJECTION
c) GENERAL
B. ORGANIZATIONAL STRUCTURE:
a) BACKGROUND
b) SYSTEM ORGANIZATION
C.QUALITY CONTROL
a) FORMS USED
b) RESPONSIBILITIES
D. PRODUCTION CONTROL
a) GENERAL
b) CHANGE CONTROL
c) ERRORS
SKYCOAT, LLC will assign a work order process sheet (job sheet) for
each customer for each job in the order in which it is received.
The job sheet will have the lot number, part number, process, and
any revisions if applicable.
E. STOCK CONTROL
a) IDENTIFYING MATERIALS
F. INSPECTION
b) IN-PROCESS INSPECTION:
3
Quality assurance will be responsible for performing final
inspection. The painter will be responsible for his own work and
will check in process to ensure adherence to customer
specifications.
c) IN-LINE INSPECTION:
Parts in house will follow the job procedure sheet to be sure the
customer is receiving the highest quality part possible. Batch tests
are conducted to assure the gloss, color, texture, dirt, adhesion,
and mil thickness in accordance with customer requirements. A
detailed chemistry logged is recorded and filed for each lot number.
d) FINAL INSPECTION
e) REJECT PROCESS
G. MAINTENANCE SCHEDULE
a) EQUIPMENT MAINTENANCE
H. SPECIAL PROCESSES
a) MASKING/SANDING
I. COATERS
All coaters and paint mixers will follow the shop procedures sheet
4
(included in the manual) while coating the product. The shop
procedure sheet is the detailed process for coating the product in
accordance with the customer’s specifications.
J. BAKING TIMES
L. Process Control
M. Supplies Procurement
N. Employee Training
5
SKYCOAT,)LLC.) ) ) Procedure)No:)SOP51)
Standard)Operating)Procedure) Page)
Title:) Revision:)1)
)))))) Non5conforming)products) ) Date:))10/22/12)
) Corrective)and)Preventative)action) )
)
This)Standard)Operating)Procedure)(SOP))describes)the)responsibilities,)procedures,)and)documentation)
for)reporting)non5conforming)product.))It)also)aims)to)prevent)non5compliances)within)the)management)
system,)address)customer)complaints,)and)request)improvements)to)processes.)
!
2.0!Responsibility!
The)Quality)Control)manager)is)responsible)for)the)quality)of)the)product/process)or)service)they)
provide,)the)prevention)and)correction)of)non5conforming)product/processes,)and)non5compliances.)
!
3.0!Procedures!
Non7!Conforming!Product!or!Process!
!
SKYCOAT)employees)are)authorized)to)identify)a)non5conformance)in)a)product)or)process)and)report)
the)issue)to)their)Quality)Control)Manager.)
)
For)non5conforming)product,)the)SKYCOAT)employee)records)the)non5)conformity)on)a)numbered)CAR)
and)indicates)the)root)cause)of)the)non5conformance.))
)
Non5Conforming)material)is)identified)by)a)label)and)moved)out)of)the)immediate)work)area)to)the")
discrepant)material")area.)
The)non5conformity)is)reviewed)and)resolved)by)working)with)the)Quality)Control)Manager.)The)
recipient)of)the)CAR,)the)CAR)number,)and)date)is)recorded)in)the)CAR)log.)
The)information)recorded)on)the)CAR)may)be)used)"As5Is",)rework,)or)discrepant.)The)final)resolution)of)
the)product)or)material)is)recorded)on)the)CAR)then)signed)and)dated)by)the)quality)manager.)
)
The)corrective)and/or)preventative)action)contains)sufficient)data)to)ensure)the)root)cause)of)the)non5
conformance)is)identified)and)changes)to)documented)procedures)are)made.)The)CAR)is)returned)to)the)
initiator)and)logged)accordingly.)
)
In)the)event)the)response)is)not)completed)in)a)reasonable)time)frame)or)the)planned)action)appears)
unlikely)to)address)the)root)causes)of)the)non5conformance,)the)initiator)opens)a)follow)up)CAR)and)
forwards)it)to)the)Owner)for)further)action.))
Preventive)actions)are)considered)to)be)long5term)processes)requiring)a)plan)of)action)based)upon)
analysis)of)the)factors)of)the)root)cause.)
The)purpose)of)the)CAR)is)to)display)the)basic)plan)of)action)needed)to)prevent)the)re5occurrence)of)the)
original)fault.)Each)step)of)the)plan)is)to)be)provided)with)a)monitoring)time)period.)
!
The)Quality)Control)Manager)is)responsible)for)undertaking)the)planning)of)preventative)actions)and)for)
implementing)the)actions)according)to)the)defined)program.)The)Quality)Control)Manager)is)responsible)
for)monitoring)the)planned)actions)and)for)providing)the)Owner)with)concise)summaries)of)the)progress)
of)the)plans.)
6
SKYCOAT,)LLC.) ) ) Procedure)No:)SOP52)
Standard)Operating)Procedure) Page)
Title:) Revision:)1)
)))))) Receiving)Control) Date:))10/22/12)
!
1.!0!Purpose!
!
This)Standard)Operating)Procedure)(SOP))describes)the)responsibilities,)procedures,)and)documentation)
for)receiving)and)control.)Additionally,)it)establishes)a)uniform)method)for)the)receipt)of)incoming)parts)
and)supplies.)
)
2.0!Responsibility!
!
The)Quality)Control)manager)is)responsible)for)receiving)and)control.)
Shipping)/)Receiving:)Verifies)incoming)material)and)packing)list)for)correct)purchase)order)number,)
correct)quantities,)and)material)type/alloy)or)part)number.)Ensures)all)necessary))material)certification)is)
supplied.)Contacts)vendors)and/or)customers)with)any)discrepancies.)
Quality)Department:)Inspects)all)material)for)correct)type,)dimensions,)and)verifies)that))
material)matches)supplied)specifications)and)print/job)requirements.)Contacts)vendors))
and/or)customers)immediately)with)any)discrepancies.)
)
3.0!Procedures!!
!
Receiving!
Any)qualified)employee)is)authorized)to)receive)shipments)of)parts)and)supplies.)Shipping)documents)
are)checked)to)verify)the)number)of)containers.)All)containers)or)material)is)checked)for)obvious)
damage)or)contamination.)(Obtain)record)of)damage)or)contamination)when)applicable)from)truck)
driver).))Items)listed)on)the)packing)slip)are)verified)to)be)included)in)the)shipment;)Discrepancies)are)
noted.)
)
In)the)event)that)material)is)damaged)in)shipment)to)SKYCOAT,)LLC,)the)Quality)Control)Manager)will)
work)out)the)liability)and)insurance)arrangements)with)carrier.)The)Quality)Control)Manager)will)notify)
owner.)
)
Upon)Receipt)of)an)incoming)lot)of)raw)material,)the)shipper/receiver)removes)the)supplier’s)packing)list)
and)obtains)the)corresponding)SKYCOAT,)LLC)purchase)order.)
)
The)shipper/receiver)reviews)the)purchase)order)for)specific)requirements)and)verifies)that)all)
requirements)have)been)met)(i.e.)quantities)match)packing)list)quantities)as)well)as)order)quantities,)
material)type)on)packing)list)matches)material)type)ordered,)required)specifications)have)been)supplied,)
correct)delivery)date,)etc.))
)
Control!
Materials/supplies)are)inspected)for)nonconformities)and)damage.)
Materials)identified)that)require)corrective)action)verifications)by)Quality)Control)are)segregated.)
Accepted)materials/supplies)are)moved)into)the)production)area)once)acceptance)is)granted)by)
Receiving)Inspection)
7
)
Inspection!
Dimensions)and)type)of)material)is)matched)to)purchase)order)and)packing)list)specifications.)
Raw)material)is)correctly)marked)and)easily)identified.)
Inspection)will)sign)or)stamp)acceptance)and)mark)the)date)of)acceptance)on)the)Material)Identification)
Tag).)
)
Inspected)materials)that)are)accepted)will)be)put)into)the)hold)area)pending)the)release)of))
the)job.))Once)released,)the)Production)Run)Packet)is)given)to)the)Production)
Control)Department)to)be)matched)up)with)the)tagged)material.))
)
Discrepant)materials)are)moved)to)the)designated)Discrepant)Materials)location,)tagged)with)a)red)tag)
and)a)CAR)form)is)filled)out)and)processed.)
Supplier)is)contacted)via)phone)or)email)regarding)discrepancy.)
8
)
SKYCOAT,)LLC.)) ) Procedure)No:)SOP53)
Standard)Operating)Procedure) Page)
Title:) Revision:)1)
)))))) Quality)in5process) ) Date:))10/22/12)
1.!0!Purpose!
This)procedure)ensures)that)all)activities)necessary)for)the)manufacturing)and)packaging)of)our)products)
is)planned)and)controlled)to)ensure)the)product)adheres)to)requirements)during)all)stages)or)processing.)
2.0!Responsibility!
The)Quality)Control)manager)is)responsible)for)the)overall)Quality)In5Process)and))
Final)Inspection.)
)
3.0!Procedures!!
In7Process!Inspection!/!Procedures!
In5Process)Inspection)will)be)performed)by)the)production)manager)and)recorded)on)job)sheet.)
Quality)Control)and)the)Production)Manager)will)determine)the)frequency)of)the)in5process)inspection.))
The)frequency)of)inspection)will)be)dependent)on)the)type)of)part,)cycle)time,)quantity)of)parts)to)be)
processed,)and)specification)provided)by)the)client.))Characteristics)to)be)inspected)will)be)determined)
by)Quality)Control)and)the)Production)Manager)for)each)job.))A)detailed)chemistry)log)is)recorded)and)
filed)for)all)production)lots.)))
In)the)event)of)a)reject)during)any)in5process)production,)the)rejected)part(s))will)be)clearly)identified)by)
a)red)tag)and)sent)to)the)discrepant)materials)area)separated)from)the)normal)flow)of)the)in5process)
materials.)
Rejected)part(s))will)follow)the)NON5CONFORMING)MATERIAL)CONTROLS)PROCESS)per)SOP)5)1.)
9
)
SKYCOAT,)LLC.)) ) Procedure)No:)SOP54)
Standard)Operating)Procedure) Page)
Title:) Revision:)1)
)))))) Handling,)Packaging,)Storage,)and)Delivery) Date:))10/22/12)
!
1.!0!Purpose!
This)standard)operating)procedure)(SOP))provides)the)general)technical)requirements)and)operational)
guidelines)for)the)proper)labeling,)packing,)and)shipping)product.)These)Procedures)have)been)
developed)to)reduce)the)risk)of)damage.)
2.0!Responsibility!
The)Production)Manager)is)responsible)for)overall)implementation)of)this)procedure)and)ensuring)that)it)
complies)with)current)regulations)and)standards.)
3.0!Procedures!!
Handling!
Handling)procedures)shall)be)followed)to)prevent)damage)or)deterioration)of)materials)and)products.)
Storage!
Designated)areas)and)secure)stockrooms)shall)be)used)to)store)and)protect)material)
and)product.)Suitable)methods)for)authorizing)the)receipt)and)
dispatch)of)items)in)such)areas)shall)be)maintained)and)enforced.)Procedures)
detailing)the)identification)and)control)of)material)shelf)life)shall)be)followed)to)
ensure)that)expired)materials)or)components)are)not)used.)
!
Packaging!
Procedures)for)packaging,)packing,)and)the)identification)of)materials)and)products)shall)be)followed)to)
ensure)compliance)to)specified)customer)requirements.)Materials)are)to)remain)in)the)original)
manufacturer’s)package)when)possible.)
)
Delivery!
Packaging)materials)and)containers)will)be)inspected)to)make)sure)that)they)meet)customer)
specifications.))After)containers)are)sealed)and)before)they)are)shipped,)they)will)be)inspected)for)all)
applicable)marking)and)correct)shipping)information.)
)
10
)
SKYCOAT,)LLC.)) ) Procedure)No:)SOP55)
Standard)Operating)Procedure) Page)
Title:) Revision:)1)
)))))) Non5conforming)products) ) Date:))10/22/12)
!
1.!0!Purpose!
!
This procedure establishes a system to inspect and ensure that all manufactured parts
meet customer specifications and include all required certificates,)samples,)and)other)
documentation.
)
2.0!Responsibility!
)
The)Quality)Control)Manager)performs)final)inspections.)
)
3.0!Procedures!!
!
Each)job)of)pieces,)parts,)or)sub5assemblies)must)be)final)inspected)before)being)transferred)to)the)
packaging)area.))
The final inspection is performed by verifying that all QC codes have been satisfied and all
required samples and certifications listed on the purchase order and job sheet are complete.
The inspection results are recorded on the Final Inspection Report, which is stored in the master
job folder in the front office.
Individual inspection reports will be made for each job inspected and filed according to
customer, part number, and date. The report will include part revision with each dimension
inspected, and the quantity accepted or rejected. Copies of Final inspection results will be
available for customer viewing in the front office or)the)QC)area.
Once jobs pass final inspection, they are routed QC approved on the job sheet and routed to
packaging.)
Parts or sub-assemblies that do not pass final inspection will be red tagged as discrepant and
routed to the discrepant materials area. Once labeled as discrepant, parts are returned to
client.
11
SKYCOAT,)LLC.)) ) Procedure)No:)SOP56)
Standard)Operating)Procedure) Page)
Title:) Revision:)1)
)))))) Supplier)Control) ) Date:))10/22/12)
!
1.!0!Purpose!
The)purpose)of)Supplier)Control)is)to)provide)quality)suppliers)to,)LLC)which)meet)all)expectations)for)
excellence)with)the)ultimate)goal)being)complete)customer)satisfaction.)
)
2.0!Responsibility!
The)Quality)Control)Manager)and)the)Production)Manager)are)responsible)for)final)inspections.)
)
3.0!Procedures!!
A)supplier)qualification)form)is)completed)by)each)new)vendor)to)evaluate)their)capability)as)a)potential)
supplier.)
)
The)supplier’s)ability)to)satisfy)requirements)is)reviewed)by)Purchasing)and)Quality)Control.)
)
Evaluation)may)include)one)or)more)of)the)following:)
! Ability)to)meet)requirements)
! Quality)Assurance)
! Price)
! Samples)Submitted)
! Lead)Times)
! References)
! Customer)Requirements)
)
NOTE:)If)the)product)or)service)is)a)customer)requirement,)no)further)evaluation)is)necessary.)
)
Prior)to)approving)a)supplier,)it)is)necessary)for),)LLC)and)the)supplier)to)clearly)communicate)to)all)
expectations)regarding)the)product)or)service)to)be)provided.)Any)unclear)specifications,)quality)
requirements,)or)other)issues)shall)be)resolved)prior)to)placing)the)supplier)on)the),)LLC)approved)
suppliers)list.)
)
Once)the)supplier)is)placed)on)the)approved)supplier’s)list,)their)performance)is)monitored)by)
Purchasing)and)Quality)Control)via)supplier)performance)reviews.))If)the)supplier’s)performance)is)
satisfactory,)they)continue)to)be)a)vendor.))Corrective)Action)for)unsatisfactory)suppliers)is)performed)as)
follows:)
Quality!Level!!!!!! ! Action!Taken! ! ! ! Supplier!Status!! !
1st)Reject) ) ) Phone)call)to)supplier) ) ) Approved)Supplier)
) ) ) ) noted)in)supplier’s)record)
)
2nd)Reject)in) ) ) Phone)Call)to)Supplier) ) ) Approved)Supplier)
12)Month)period) ) and)non5conformance)
issued.)
12
)
3rd)reject)in) ) ) phone)call)to)supplier) ) ) Conditional)Supplier)
12)Month)period) ) non5conformance)
) ) ) ) issued,)warning)letter)sent)
) ) ) ) and)supplier)reduced)to)
) ) ) ) conditional)status)
)
Out7Sourced!Processes!
)
Suppliers)of)out5sourced)processes)shall:)
! Meet)specifications)
! Perform)inspection)and)testing)to)verify)that)the)product)meets)specifications)
! Maintain)inspection)and)test)records)for)a)period)of)two)(2))years)
! Only)ship)products)to)that)meet)specifications)
! Provide)SKYCOAT)access)to)the)manufacturing,)packaging,)and)testing)facilities)upon)request)
)
NOTES:)
1.)Records)of)supplier)evaluations)and)correspondence)shall)be)kept)as)quality)records.)
2.)Supplier)non5conformities)are)resolved)in)accordance)with)the)corrective)action))
)))))procedures.)
3.)A)reject)is)defined)as)the)reject)of)one)(1))line)item)that)does)not)satisfy)quality)
)))))requirements.)
4.)Suppliers)that)have)not)been)used)for)a)period)of)three)(3))years)shall)be)re5evaluated)as)a)new)
supplier.)
)
)
) )
13
Workmanship,Standards,and,Inspecting,Criteria!
,
Purpose,
The!purpose!of!this!document!is!to!inform!the!customer!on!what!we!base!our!product!acceptability.!!If!
this!is!not!acceptable!with!you,!please!inform!us!in!writing.!!Otherwise,!these!are!the!criterion!we!will!be!
using.!
Inspection,Criteria,for,Class,“A”,
Class!“A”!products!are!ones!where!the!end!viewer!frequently!sees!the!product!
!
Inspection,methods,
View!at!a!distance!of!24”!in!normal!office!lighting!for!no!more!than!7!seconds!
!
Texture:! ! Should!be!uniform!
!
Scratches:! ! No!more!than!2!at!.010”!x!.030”!in!a!five!inch!square!
!
Runs:! ! ! None!allowed!
!
Gun!Spit:! ! No!more!than!3!at!.050”!diameter!maximum!in!a!two!inch!square!
!
Dirt,!Chips:! ! No!more!than!2!at!.020”!diameter!maximum!in!a!three!inch!square!
!
Gloss:! ! ! Can!vary!20%!
!
Cross!Hatch!
Adhesion!Test:! ! 80%!or!better!adhesion!
!
Porosity:! ! Not!responsible!for!defects!such!as!degassing!bubbles!and!pitting.!
,
General,Definitions,
,
Scratches! ! A!shallow!groove!or!line!on!the!surface!of!a!part!!
!
Lint! ! ! Fine!strands!of!fiber!covered!by!paint!
!
Dirt,!Dark!Specs!! Miniscule!particles!embedded!in!the!part!which!show!as!a!color!difference;!They!
are!most!often!sharp!topped!protrusions!above!the!painted!surface!
!
Gloss! ! ! A!surface!luster!on!the!finish!or!texture!
!
Flaking,!Peeling!! Areas!in!which!paint!comes!off!with!light!rubbing;!Very!poor!adhesion!between!
paint!and!part!
!
Chips! ! ! Areas!in!which!paint!has!been!knocked!loose!from!the!part!surface!
!
Paint!Runs! ! An!area!of!excess!paint,!which!has!“sagged”!or!flowed!to!a!noticeably!thicker!
height!
!
Gun!Spit! ! Clumps!or!globs!of!paint,!which!are!noticed!above!the!finish!or!texture!
14
Workmanship,Standards,and,Inspecting,Criteria!
,
Purpose,
The!purpose!of!this!document!is!to!inform!the!customer!on!what!we!base!our!product!acceptability.!!If!
this!is!not!acceptable!with!you,!please!let!us!know!in!writing.!!Otherwise,!these!are!the!criterion!we!will!
be!using.!
!
Inspection,Criteria,for,Class,“B”,
Class!“B”!products!are!ones!where!the!end!viewer!casually!sees!the!product!
!
Inspection,methods,
View!at!a!distance!of!40”!in!normal!office!lighting!for!no!more!than!4!seconds!
!
Texture:! ! Can!vary!30%!
!
Scratches:! ! No!more!than!2!at!.020”!x!.100”!in!a!five!inch!square!
!
Runs:! ! ! None!allowed!
!
Gun!Spit:! ! No!more!than!3!at!.075”!diameter!maximum!in!a!two!inch!square!
!
Dirt,!Chips:! ! No!more!than!2!at!.050”!diameter!maximum!in!a!three!inch!square!
!
Gloss:! ! ! Can!vary!30%!
!
Cross!Hatch!
Adhesion!Test:! ! 80%!or!better!adhesion!
!
Porosity:! ! Not!responsible!for!defects!such!as!degassing!bubbles!and!pitting.!
,
General,Definitions,
,
Scratches! ! A!shallow!groove!or!line!on!the!surface!of!a!part!!
!
Lint! ! ! Fine!strands!of!fiber!covered!by!paint!
!
Dirt,!Dark!Specs!! Miniscule!particles!embedded!in!the!part!which!show!as!a!color!difference;!They!
are!most!often!sharpZtopped!protrusions!above!the!painted!surface!
!
Gloss! ! ! A!surface!luster!on!the!finish!or!texture!
!
Flaking,!Peeling!! Areas!in!which!paint!comes!off!with!light!rubbing;!Very!poor!adhesion!between!
paint!and!part!
!
Chips! ! ! Areas!in!which!paint!ahs!been!knocked!loose!from!the!part!surface!
Paint!Runs! ! An!area!of!excess!paint,!which!has!“sagged”!or!flowed!to!a!noticeably!thicker!
height!
Gun!Spit! ! Clumps!or!globs!of!paint,!which!are!noticed!above!the!finish!or!texture!
!
15
!
,
Workmanship,Standards,and,Inspecting,Criteria,
,
Purpose,
The!purpose!of!this!document!is!to!inform!the!customer!on!what!we!base!our!product!acceptability.!!If!this!is!
not!acceptable!with!you,!please!let!us!know!in!writing.!!Otherwise,!these!are!the!criterion!we!will!be!using.!
,
Inspection,Criteria,for,Class,“C”,
Class!“C”!products!are!ones!where!the!end!viewer!does!not!see!the!product!
!
Inspection,methods,
View!at!a!distance!of!60”!in!normal!office!lighting!for!no!more!than!3!seconds!
!
Texture:! ! Can!vary!50%!
!
Scratches:!! ! Ok!as!long!as!it!is!not!through!the!substrate!
!
Runs:! ! ! Surface!must!not!be!so!badly!ran!to!suggest!inferior!workmanship!
!
Gun!Spit:! ! Surface!must!no!be!so!badly!spit!to!suggest!inferior!workmanship!
!
Dirt:! ! ! Surface!must!no!be!so!badly!dirty!to!suggest!inferior!workmanship!
!
Gloss:! ! ! Can!vary!50%!
!
Cross!Hatch!
Adhesion!Test:! ! 80%!or!better!adhesion!
!
!
Chips:! ! ! No!more!than!4!at!.090”!diameter!in!a!seven!inch!square!
!
Porosity:! ! Not!responsible!for!defects!such!as!degassing!bubbles!and!pitting.!
,
General,Definitions,
,
Scratches! ! A!shallow!groove!or!line!on!the!surface!of!a!part! !
!
Lint! ! ! Fine!strands!of!fiber!covered!by!paint!
!
Dirt,!Dark!Specs! ! Miniscule!particles!embedded!in!the!part!which!show!as!a!color!difference;!They!are!
most!often!sharpZtopped!protrusions!above!the!painted!surface!
Gloss! ! ! A!surface!luster!on!the!finish!or!texture!
!
Flaking,!Peeling! ! Areas!in!which!paint!comes!off!with!light!rubbing;!Very!poor!adhesion!between!
paint!and!part!
!
Chips! ! ! Areas!in!which!paint!ahs!been!knocked!loose!from!the!part!surface!
!
Paint!Runs! ! An!area!of!excess!paint,!which!has!“sagged”!or!flowed!to!a!noticeably!thicker!height!
Gun!Spit! ! Clumps!or!globs!of!paint,!which!are!noticed!above!the!finish!or!texture!
16
!
Work Order Procedure Sheet
Customer Authorization:
SKYCOAT Authorization:
Packaging Instructions:
Productions Comments:
17
TITRATION TEST
ALODINE 5200
18
!
1 Powder 200
7 DI Rinse 1 min.
Note: 25 TDS or
Better
19
Supplier Qualification Form
(This form MUST be completed to be an approved SKYCOAT, LLC supplier)
Name: _______________________________________________________________
Address: _____________________________________________________________
Phone: _______________________________________________________________
Fax: _________________________________________________________________
Website: _____________________________________________________________
Email: _______________________________________________________________
Phone: _______________________________________________________________
Email: _______________________________________________________________
Phone: _______________________________________________________________
______________________________________________________________________
______________________________________________________________________
If there are any current quality system certifications, please supply copies of certifications,
quality policy, quality objectives, and quality manual.
Organization Information
Number of Employees:_____________________________________________________
20
Number of years in business:________________________________________________
3. How does our business fit in with your overall business plans?
4. Do you have an effective process in place that provides feedback to SKYCOAT on errors and
potential improvements?
6. What is your process to ensure materials purchased are identified, controlled, and tracked?
7. What is the process in place to inform SKYCOAT in the event of issues or late deliveries?
11. Do you have a corrective and preventive action process in place? Please explain.
21
I certify that the information provided above is true to the best of my knowledge. If there are any
significant changes in the quality system, management, or quality personnel, SKYCOAT, LLC
will be notified within 30 days of those implemented changes.
Supplier Qualification
Name: _______________________________________________________________
Date: ________________________________________________________________
______________________________________________________________________
Name: _______________________________________________________________
Position/Title: _________________________________________________________
Date: ________________________________________________________________
Re-Evaluation Summary
Date: ________________________________________________________________
Status: _______________________________________________________________
Comments:____________________________________________________________
22
New Employee Training
Please initial each item as it is completed.
Employee signature:_______________________________
Date:_____________________
23
!
Corrective!and!Preventative!Action!Form!
Company!Name:!
Reported!by:!
lot!#:!
Part!#!
Date!product!Received:!
Date!product!Shipped:!
Preventative!or!Corrective!Action:!!
Please!describe!issue:!!
Please!describe!how!this!issue!will!be!prevented/Corrected:!
If!unknown,!please!perform!a!root!cause!analysis!describing:!1.!!The!case!of!the!issue.!2.!!What!is!being!!
done!now!to!fix!the!issue?!!3.!!How!this!issue!will!be!avoided!in!the!future?!
Verification!Notes:!!Include!how!issue!resolution!was!verified!and!date!verified!in!space!below.!
24
!
Maintenance Schedule
Next
Daily Maintenance Procedure Initials Date date
pH meter calibration Standard solution calibration using pH buffers
Compressor Check
Air compressor oil
Air lines Air line condenser empty
Air compressor Empty moisture separator compressor
Dehumidifier
DI water filter Check dehumidifier filter (summer)
Check water hardness
25
SKYCOAT, LLC
W6341 HWY 10 Ph. 715-222-9143 email: info@skycoat.com
Ellsworth, WI 54011 Fax. 715-273-5697 www.skycoat.com