Work Flow – Recruitment Dt: 2017

Summary: Recruitment
2.) Consultant Screens their database for
relevant applicants, if no registered candidates Procedure
1.) Labour request is
are found, Consultant to arrange a class for the
logged on Sharepoint 1. All LR logged on Sharepoint.
next day & provides security with a list of Lead time - Skilled positions
names to arrange access (Artisans, Admin, C14 Drivers,
etc) - 5 days
Lead time - Unskilled Positions
(General workers / Forklift
3.) New Assignees
5.) Consultant to send drivers) -24 hours
completes Application 4.) Consultant to Progress report containing Lead time - Bulk orders/ Pool
form, conduct references, Name, cell number & ID top ups (More than 15) - 5 days
Interview,Assessment check crim results (48 number (& Packs if
s, FTC, induction. (Not hour turn around) required) & SMS to all
Annexure A) successful candidates 2. No Employee numbers to be
generated without receiving a
completed Annexure A
3. Consultants will be dedicated to
6.) Consultant to 7.) Operations to call Assignees to a region to ensure pools are
complete references, arrange day that they need to 8.) Ops to send available across our territory.
load all applicants and report to site ,meet assignee on site annexure A to (Except for ERS sites, where
regret unsuccessful & Complete Annexure A & do Site consultant status will be changed to
candidates on system onboarding
unavailable until Annexure A is
received.

9.)Consultant to change assignee status and issue employee number


2
Work Flow – Recruitment Dt: 2017

Summary: Referrals
(Site & Client
1.) Official order to be logged on SharePoint 2.) Consultant to Call & Pre-screen all referrals and
with Referrals' name & Contact numbers listed arrange for them to attend Onboarding process & 1. Ops still to log as Labour
in Comments supply Security with a list to allow access request
If client referral - Client recommendation form Should referrals not meet minimum requirements, Tamara to 2. Client referral form to be
to be completed be made aware & will deal with this on a case 2 case basis.
completed for all client
referrals.
3. Consultants to take
ownership of candidates –
from start to finish,
regardless of whether it’s a
3.) New Assignees arrive 4.) Consultant to conduct 5.) Consultant to send Progress referral or not. Full screening
completes Application references, check crim report containing Name, cell still needs to take place.
form, Assessments, FTC, results (48 hour turn number & ID number (& Packs
induction. around) if required) 4. No employee numbers will be
generated should applicants
not meet minimum
recruitment criteria or
Criminals unless the client
signs an indemnity, and BM &
8.) Operations to call Assignees to RM approves.
arrange day that they need to 9.) Upon Receiving Annexure A from Ops - 5. Should a person have worked
7.) Consultant to load all applicants and
report to site ,meet assignee on Assignee status is changed and assignee
regret unsuccessful candidates on system before completing our
site & Complete Annexure A & do numeber generated
Site onboarding
process, This will be brought
to GM, BM & RM’s attention,
and be dealt with on a case to
case basis
3
Work Flow – Recruitment Dt: 2017

Summary: Urgent
Requests / Same
1.) Ops to call day orders
RMregarding urgent
order 2.) RM allocates order to consultant.  All LR to be logged on
Sharepoint.
Labour request is logged Recruitment to have pools
on Sharepoint available and check in with
these pools on a weekly
basis to ensure staff are
available in all major areas

4) Should walk -ins be utilised 5.) Consultant to send for Urgent orders.
3.) Consultant to refer (Previous employees), RC to Progress report containing  RC to work on urgent

to applicant Register check with OM's regarding Name, cell number & ID orders, but only supply
reasons for leaving, as well as number , PPE Sizes (& Packs progress report once log is
system for Crims & Valid emp # if required) received.
 Size of Recruitment pool to
be 10% of Average Monthly
LR Requirements
 Annexure A to be signed by
6.) Operations to meet Recruitment if Urgent
7.) Ops to send
assignee on site & orders are being
annexure A to
Complete Annexure A & despatched from the office
consultant
do Site onboarding & all details are available.