1 Universitas Indonesia

5.1. Water Utility


5.1.1. Cooling Water Utility
REVISI PARAGRAF AKHIR & TABEL 5.1
𝑄 = 𝑚 ∆𝐻
Where Q is heat flow (kJ/h), m is mass flow (kg/h), and ΔH is amount of
heat content or enthalpy (kJ/kg). Table below is the cooling water requirement for
the plant and can be concluded that the cooling water requirement after HEN is
958.468 ton/h.

2 Universitas Indonesia
3

Table 5. 1. Cooling Water Utility After HEN


Water Cpw Mass
Equipment Temperatur ater Flow
Heat Flow
No Stream e (°C) ∆𝑻 (°𝑪) (kJ/ After
(kJ/h)
kg HEN
Code Name In Out
°C) (kg/h)
340.
1 27 E-107 Cooler 1.266e+006 200 140.3 8,468
3
4.19
Conden
2 20 E-104 3.067e+007 25 99.4 74.4 950,000
ser
Total Requirement 958,468

Universitas Indonesia
4

5.1.2. Steam Utility


REVISI PARAGRAF TABEL 5.2
Table 5. 2. Heating Steam Utility After HEN
𝑻𝒊𝒏 𝑻𝒐𝒖𝒕 Mass Flow
No Equipment Q (kJ/h)
(℃) (℃) (kg/h)
1 Steam Turbine 1.332e+008 1,317 191.5 13,230
Total Requirement 13,230

5.1.4. Total Water Requirement


REVISI TABEL 5.3
Table 5. 3. Total Water Requirement After HEN
No Requirement Amount (kg/h)
1 Cooling Water 958,468
3 Steam Feed 13,230
4 Heating Steam (30% addition) 3,969
Total Requirement 975,667

FUEL UTILITY DI APUS YAH