IMB.e – ITB.

e start-up, shut-down & manual bypass

IMB.e - ITB.e START-UP, SHUT-DOWN & MANUAL


BYPASS

Index

1. INTRODUCTION.................................................................................. 2
2. START-UP PROCDURE ..................................................................... 3
2.1 INVERTER START-UP .....................................................................................3
2.2 START-UP BASIC TROUBLESHOOTING.......................................................4
3. SHUT-DOWN PROCEDURE............................................................... 5
4. MANUAL BYPASS PROCEDURE...................................................... 5
5. START-UP FROM MANUAL BYPASS ............................................... 6

Descrizione Data Emesso Controllato Approvato Lingua Pagina di Pag.


Rev.
Description Date Issued Checked Approved Language Page of Pag.
/ First Issue 28.08.06 P. Conti E. Simoni E. Simoni
E 1 7
A Revision JSE412820 20.01.10 P. Conti E. Simoni E. Simoni
B Revision JSE413994 16.03.11 P. Conti E. Simoni E. Simoni Codice / Code

JUD408866
IMB.e – ITB.e start-up, shut-down & manual bypass

1. INTRODUCTION
Before carrying out any manoeuvre on the equipment, make sure you have
completely read and understood the instructions described in the following chapters.

The incorrect execution of manoeuvres may cause damage to


persons and property. Be very careful.

In case the information below is not sufficiently clear, please get in


touch with the manufacturer.

2 of 7 JUD408866 Rev. B JSE413994 16/03/11


IMB.e – ITB.e start-up, shut-down & manual bypass

2. START-UP PROCDURE

Before switching on the Inverter, make sure that the emergency


power off “EPO” push-button, placed (if present) near the front panel, is
in the release position; if not, press it and proceed with the start-up
procedure. The emergency remote power off contact made the terminals
XEAC1 – XEAC2 shorted.
2.1 INVERTER START-UP
Nr. LCD DISPLAYING ACTION INVERTER OPERATION
A few seconds after the closing of S1, the
Close S1 until control logic will be started and the front
1 BLANK the display is panel will be activated. The DC voltage
supplied increases.
The DC voltage reach the nominal value.
START UP Keep close S1 Some preliminary checks and the test of the
2
WAIT PLEASE and close ICB LED’s are performed during this phase.
LED’s #1 and #3 are lit green.
START UP
3 Release S1
WAIT PLEASE
INVERTER START UP Move “On/Off
3a1 Inverter The inverter IGBT bridge is enabled to
SWITCH ON INV. SELEC. Selector” modulate.
The inverter IGBT bridge starts to modulate
INVERTER START UP and the inverter output voltage reaches the
4 nominal value. After a while the inverter
WAIT PLEASE
static switch thyristors close. LED #4 is lit
green.
BYPASS START UP
5 Close QIRA
CLOSE QIRA
BYPASS START UP
6 Close SBCB
CLOSE SBCB (BYPASS)
The microprocessor checks that all the by-
BYPASS START UP pass parameters (voltage, phase sequence,
7
WAIT PLEASE frequency) are within the tolerance limits.
LED #2 is lit green.
START UP END
8 Close OCB
CLOSE OCB (OUTPUT)
The microprocessor checks that all the
START UP END output parameters (voltage, current,
9
WAIT PLEASE frequency) are within the tolerance limits.
LED #6 is lit green.
End MENU DEFAULT

1
Point 3a will be automatically skipped if the manual On/off inverter option is not required.
Rev. B JSE413994 16/03/11 JUD408866 3 of 7
IMB.e – ITB.e start-up, shut-down & manual bypass

2.2 START-UP BASIC TROUBLESHOOTING


This chapter provides the basic information if any alarms occur during the start-up
procedure:

1) After closing S1 the LCD display is still blank


 Check if the input DC voltage is present.

2) After the step #3 the unit shows alarms messages


 Check the EPO push-button (if provided outside the unit) is in the release
position.
 If the EPO push-button is not provided check the terminals XEac1-XEac2
are shorted.

3) After the step #6 the unit doesn’t switch to step #7 and shows the alarm A15 –
Bypass fault
 Check the static switch protection fuses: Normally they are inside the unit.

4) After the step #7 the unit shows the alarm A15 – Bypass fault
 Check the bypass voltage and frequency are within the tolerance limits.

In case the problem cannot be solved contact the service department.

4 of 7 JUD408866 Rev. B JSE413994 16/03/11


IMB.e – ITB.e start-up, shut-down & manual bypass

3. SHUT-DOWN PROCEDURE

No. ACTION LCD DISPLAYNG INVERTER OPERATION


INVERTER STATUS The supply to the load is interrupted. LED
1 Open OCB
A19 OCB OPEN #6 lit orange
INVERTER STATUS The by-pass line is disconnected. LED #2
2 Open SBCB
A15 BYPASS FAULT off.
Open “On/Off INVERTER STATUS
2a2 Inverter The inverter are switched off
Switch” A13 INVERTER OUT TOL

3 Open ICB The inverter are switched off.


4 BLANK Shut-down procedure end.

4. MANUAL BYPASS PROCEDURE

During manual bypass operation the load is supplied directly by the


mains, therefore continuous supply is not guaranteed.

No. ACTION DISPLAY LCD INVERTER OPERATION


Move the
INVERTER STATUS The load is transferred to the by-
“NORMAL-
1 pass static switch. LED #4 off, LED
BYPASS” switch on A16 BYPLOAD #5 lit orange.
BYPASS
Open “On/Off INVERTER STATUS
1a2 The inverter are switched off
Inverter Switch” A13 INVERTER OUT TOL
2 Open ICB BLANK The inverter Shut Down
The load is supplied by the mains
through the manual by-pass circuit
3 Close MBCB BLANK
breaker. The by-pass static switch is
still closed.
4 Open SBCB BLANK The by-pass line is disconnected.
The load is now supplied directly by
the mains through the manual by-
5 Open OCB BLANK
pass circuit breaker. The inverter is
isolated.

2
Points 1a and 2a will be automatically skipped if the manual On/off inverter option is not required
Rev. B JSE413994 16/03/11 JUD408866 5 of 7
IMB.e – ITB.e start-up, shut-down & manual bypass

5. START-UP FROM MANUAL BYPASS

Before the start-up from manual by-pass (after a maintenance or


repairing) check that the “NORMAL-BYPASS” switch is in BYPASS
position.

No. DISPLAY LCD ACTION INVERTER OPERATION


Close S1 until
The control logic is supplied and the DC
1 BLANK the display is
voltage increases
supplied
The DC voltage reach the nominal value.
Some preliminary checks and the test of the
START UP Keep close S1 LED’s are performed during this phase.
2
WAIT PLEASE and close ICB
LED’s #1 and #3 are lit green. LED #7 is lit
orange.
BYPASS START UP
3 Close QIRA
CLOSE QIRA
BYPASS START UP
4 Close SBCB
CLOSE SBCB (BYPASS)
The microprocessor checks that all the by-
BYPASS START UP pass parameters (voltage, phase sequence,
5 frequency) are within the tolerance limits.
WAIT PLEASE LED #2 is lit green. The by-pass static
switch is closed, LED #5 is lit orange.
CLOSE OCB (OUTPUT) The load is supplied by the by-pass static
6 Close OCB switch. The breaker MBCB is still closed.
WAIT PLEASE LED #6 is lit green.
OPEN MBCB (MAN BYP) The load is now supplied by the by-pass
7 Open MBCB static switch only and the inverter can be
WAIT PLEASE started-up. LED #7 off.
INVERTER START UP Move “On/Off
The inverter IGBT bridge is enabled to
7a3 Inverter
SWITCH ON INV. SELEC. modulate
Selector”
The inverter IGBT bridge starts to modulate
INVERTER START UP and the inverter output voltage reaches the
8
WAIT PLEASE nominal value. The microprocessor checks
the synchronisation with the by-pass line.
Move the
MOVE BYP SWITCH “NORMAL-
The load is transferred to the inverter static
9 BYPASS”
WAIT PLEASE switch. LED #4 is lit green. LED #5 off.
switch on
NORMAL

3
Point 6a will be automatically skipped if the manual On/off inverter option is not required.
6 of 7 JUD408866 Rev. B JSE413994 16/03/11
IMB.e – ITB.e start-up, shut-down & manual bypass

START UP END The microprocessor checks that all the


10 output parameters (voltage, current,
WAIT PLEASE frequency) are within the tolerance limits.
End MENU DEFAULT

Rev. B JSE413994 16/03/11 JUD408866 7 of 7