Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

AE 3 3 2A 9F 2 2E C C 72

8 A E C 7 1 0
E7 7382 23A 2A9 9FE 2C2 2E7 C15 5C0 724 4C32
38 3A 2A FE 2C E7 C1 C0 72 C3 D
73 23 2 9F 2 2E C 5C 7 4C 2D 6C
8 A C 2
38 23AA2A 9FE E2C 2E7 7C1 15C0 072 4C3 32D 6CAAE7
23 2A 9F 2 2E C 5C 72 4C 2D 6C E 38
23 A2A 9F E2 C2E 7C 15C 072 4C 32D 6C AE 738 23A
A C 1
3A 2A 9FE E2C 2E7 7C1 5C0 0724 4C3 32D 6CAAE7 7382 23A 2A9
2 9 2 C 5 6 2

Q1.
A2 A9 FE2 2C2 E7C 15 C07 724C C32 2D6 CAE E73 3823 3A2 A9F FE2
A9 FE C2 E7 15 C0 24 32 D6 CA 73 823 A2 A9 E2 C2

B.
2A FE 2C E C1 C 72 C3 D CA E7 82 A A FE C E7

Q3. A.
Q2. A.

Q4. A

56507
9F 2 2E 7C 5C 07 4C 2D 6C E 38 3 2A 9F 2C 2E C
9F E2C C2E 7C 15C 072 24C 32D 6C AE 738 23AA2A 9FE E2C 2E7 7C1 15C0
1 3 A 7 2
FE E2C 2E7 7C1 5C0 0724 4C3 2D6 6CA E7 382 3A2 2A9 9FE 2C2 2E7C C15 5C07 724
2 C 2E C1 5C 72 C 2D C E 38 3A A FE 2C E7 1 C0 2 C3
E2 2E 7C 5C 07 4C 32 6C AE 73 23 2A 9F 2C 2E C 5C 72 4C 2D

(Rs)

Year
C2 7C 15 0 24 32 D6 A 73 823 A2 9 E2 2 7C 15C 07 4C 32 6C
E7 15 C0 724 C3 D6 CA E7 82 A2 A9 FE C2 E7C 15 07 24 32 D6 A

Annual

Job 2
Job 1
C1 C 72 C3 2D CA E7 382 3A A FE 2C E7 1 C0 24 C3 D6 CA E7

Item No.
5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E C1 5C 72 C3 2D CA E7 382

Unit Price
07 4C 32D 6C AE 738 23 2A 9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A
24 32 6 A 73 23 A2 9 E2 2 7C 15 07 4C 32 6C AE 73 23 2A

consumption
C3 D CA E7 82 A A9 FE C2 E7 15 C0 24 3 D6 A 7 82 A2 9
2D 6C E 38 3A 2A FE 2C E7 C1 C0 72 C3 2D CA E7 382 3A A9 FE
6C AE 738 23A 2A 9F 2C 2E C1 5C 72 4C3 2D 6C E7 38 3A 2A FE 2C
AE 73 23 2A 9F E2 2E 7C 5C 072 4C 2D 6C AE 38 23A 2A 9F 2C 2E Attempt any four

Sale (in hundreds)


73 823 A2 9F E2 C2E 7C 15C 07 4C 32D 6C AE 738 23A 2A 9F E2C 2E 7C1

10
300
501
82 A2 A9 E C2 7C 15 07 24 32 6 A 73 23 2 9F E2 2E 7C 5C
3A A FE 2C E7 1 C0 24 C3 D CA E7 82 A A9 E C2 7 15 0

Sequence
Sequence
2A 9FE 2C 2E C1 5C 72 C3 2D 6CA E7 382 3A 2A FE 2C E7 C1 C0 724

Time (Hrs)
Time (Hrs)
N.B. 1) Question No.1 is compulsory.

9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E7 C1 5C0 72 C3


Production Planning & Control 56507

E2 2E 7C 15C 07 4C 32 6C AE 73 23 2A 9F 2C 2E C 5C 72 4C 2D

15

28
502
C2 7C 15 0 24 32 D6 A 73 823 A2 9 E2 2 7C 15C 07 4C 32 6C

2800
E7 15 C0 724 C3 D6 CA E7 82 A2 A9 FE C2 E7C 15 07 24 32 D6 A

6
2012

B
A

10
C1 C 72 C3 2D CA E7 382 3A A FE 2C E7 1 C0 24 C3 D6 CA E7
Thursday, May 23, 201910:30 am - 01:30 pm

5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E C1 5C 72 C3 2D CA E7 382


3) Figures to the right indicate full marks.

07 4C 32D 6C AE 738 23 2A 9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A

30

10
503
24 32 6 A 73 23 A2 9 E2 2 7C 15 07 4C 32 6C AE 73 23 2A

What are the functions of PPC system?


C3 D CA E7 82 A A9 FE C2 E7 15 C0 24 3 D6 A 7 82 A2 9

E. Differentiate between CPM and PERT.

replenishment. (Basic inventory model)

33
2D 6C E 38 3A 2A FE 2C E7 C1 C0 72 C3 2D CA E7 382 3A A9 FE

Project the trend of sales for next 3 years.


6C AE 738 23A 2A 9F 2C 2E C1 5C 72 4C3 2D 6C E7 38 3A 2A FE 2C

2013
(3 Hours)

C. What are the different types of inventories?

8
8
5
AE 73 23 2A 9F E2 2E 7C 5C 072 4C 2D 6C AE 38 23A 2A 9F 2C 2E

C
504

1100
73 823 A2 9F E2 C2E 7C 15C 07 4C 32D 6C AE 738 23A 2A 9F E2C 2E 7C1

Ltd. resulted into the following historical data,


82 A2 A9 E C2 7C 15 07 24 32 6 A 73 23 2 9F E2 2E 7C 5C

Page 1 of 2
3A A FE 2C E7 1 C0 24 C3 D CA E7 82 A A9 E C2 7 15 0

37
2A 9FE 2C 2E C1 5C 72 C3 2D 6CA E7 382 3A 2A FE 2C E7 C1 C0 724

5
9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E7 C1 5C0 72 C3

40

2014
505
E2 2E 7C 15C 07 4C 32 6C AE 73 23 2A 9F 2C 2E C 5C 72 4C 2D
C2 7C 15 0 24 32 D6 A 73 823 A2 9 E2 2 7C 15C 07 4C 32 6C

6
4
A
C
E7 15 C0 724 C3 D6 CA E7 82 A2 A9 FE C2 E7C 15 07 24 32 D6 A
C1 C 72 C3 2D CA E7 382 3A A FE 2C E7 1 C0 24 C3 D6 CA E7
4) Assume suitable data wherever required but justify the same.

5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E C1 5C 72 C3 2D CA E7 382

10
D. List down the details which a process sheet should contain.

48
506

2200
07 4C 32D 6C AE 738 23 2A 9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A
2) Attempt any three questions out of the remaining five questions.

24 32 6 A 73 23 A2 9 E2 2 7C 15 07 4C 32 6C AE 73 23 2A

2015
C3 D CA E7 82 A A9 FE C2 E7 15 C0 24 3 D6 A 7 82 A2 9
2D 6C E 38 3A 2A FE 2C E7 C1 C0 72 C3 2D CA E7 382 3A A9 FE
Classify the following items into ABC and draw the ABC curve.

32D6CAE73823A2A9FE2C2E7C15C0724C
5
6C AE 738 23A 2A 9F 2C 2E C1 5C 72 4C3 2D 6C E7 38 3A 2A FE 2C

4
150

D
D
507
AE 73 23 2A 9F E2 2E 7C 5C 072 4C 2D 6C AE 38 23A 2A 9F 2C 2E

12
machines. Calculate the total elapsed time to complete both the jobs.
54
73 823 A2 9F E2 C2E 7C 15C 07 4C 32D 6C AE 738 23A 2A 9F E2C 2E 7C1
82 A2 A9 E C2 7C 15 07 24 32 6 A 73 23 2 9F E2 2E 7C 5C

2016
3A A FE 2C E7 1 C0 24 C3 D CA E7 82 A A9 E C2 7 15 0
A. Define the term Production Planning and Control and list down its need.

5
2A 9FE 2C 2E C1 5C 72 C3 2D 6CA E7 382 3A 2A FE 2C E7 C1 C0 724
800
508
9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E7 C1 5C0 72 C3
E2 2E 7C 15C 07 4C 32 6C AE 73 23 2A 9F 2C 2E C 5C 72 4C 2D

4
C2 7C 15 0 24 32 D6 A 73 823 A2 9 E2 2 7C 15C 07 4C 32 6C

E
E
68

12
E7 15 C0 724 C3 D6 CA E7 82 A2 A9 FE C2 E7C 15 07 24 32 D6 A
Paper / Subject Code: 42804 / Production Planning & Control

C1 C 72 C3 2D CA E7 382 3A A FE 2C E7 1 C0 24 C3 D6 CA E7
15

2017
600
509

5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E C1 5C 72 C3 2D CA E7 382


07 4C 32D 6C AE 738 23 2A 9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A
24 32 6 A 73 23 A2 9 E2 2 7C 15 07 4C 32 6C AE 73 23 2
B. What are subsidiary orders? How do they differ from work orders? Give its examples.

C3 D CA E7 82 A A9 FE C2 E7 15 C0 24 3 D6 A 7 82 A2
2D 6C E 38 3A 2A FE 2C E7 C1 C0 72 C3 2D CA E7 382 3A A9
80

10

B. An investigation into the demand for water pumps manufactured by Joy Engineering Pvt.
510

6C AE 738 23A 2A 9F 2C 2E C1 5C 72 4C3 2D 6C E7 38 3A 2A


AE 73 23 2A 9F E2 2E 7C 5C 072 4C 2D 6C AE 38 23A 2A 9F

Use graphical method to minimize the time required to process the following jobs on the
73 823 A2 9F E2 C2E 7C 15C 07 4C 32D 6C AE 738 23A 2A 9F
Total Marks: 80

82 A2 A9 E C2 7C 15 07 24 32 6 A 73 23 2 9F E
3A A FE 2C E7 1 C0 24 C3 D CA E7 82 A A9 E
2A 9FE 2C 2E C1 5C 72 C3 2D 6CA E7 382 3A 2A FE 2
(5)
(5)
(5)
(5)
(5)

9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A 2A 9FE 2C
1T01417 - B.E.(MECHANICAL)(Sem VII) (CBSGS) / 42804 -

(10)
(10)
(10)
With the help of neat sketch, derive the equation for EOQ with instantaneous stock (10)
(10)

{TURN OVER}
E2 2E 7C 15C 07 4C 32 6C AE 73 23 2A 9F 2C 2
C2 7C 15 0 24 32 D6 A 73 823 A2 9 E2 2
E7 15 C0 724 C3 D6 CA E7 82 A2 A9 FE C2 E
C1 C 72 C3 2D CA E7 382 3A A FE 2C E7
5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E
07 4C 32D 6C AE 738 23 2A 9F 2C 2E 7C
24 32 6 A 73 23 A2 9 E2 2 7C
C3 D CA E7 82 A A9 FE C2 E7 15
2D 6C E 38 3A 2A FE 2C E7 C1
6 A 73 2 2 9 2 2 C 5
AE 3 3 2A 9F 2 2E C C 72
8 A E C 7 1 0
E7 7382 23A 2A9 9FE 2C2 2E7 C15 5C0 724 4C32
38 3A 2A FE 2C E7 C1 C0 72 C3 D
73 23 2 9F 2 2E C 5C 7 4C 2D 6C
8 A C 2
38 23AA2A 9FE E2C 2E7 7C1 15C0 072 4C3 32D 6CAAE7
23 2A 9F 2 2E C 5C 72 4C 2D 6C E 38
23 A2A 9F E2 C2E 7C 15C 072 4C 32D 6C AE 738 23A
A C 1
3A 2A 9FE E2C 2E7 7C1 5C0 0724 4C3 32D 6CAAE7 7382 23A 2A9
2 9 2 C 5 6 2

Q6.
A2 A9 FE2 2C2 E7C 15 C07 724C C32 2D6 CAE E73 3823 3A2 A9F FE2
A9 FE C2 E7 15 C0 24 32 D6 CA 73 823 A2 A9 E2 C2

B.
2A FE 2C E C1 C 72 C3 D CA E7 82 A A FE C E7

Q5. A.

56507
9F 2 2E 7C 5C 07 4C 2D 6C E 38 3 2A 9F 2C 2E C
9F E2C C2E 7C 15C 072 24C 32D 6C AE 738 23AA2A 9FE E2C 2E7 7C1 15C0
1 3 A 7 2
FE E2C 2E7 7C1 5C0 0724 4C3 2D6 6CA E7 382 3A2 2A9 9FE 2C2 2E7C C15 5C07 724
2 C 2E C1 5C 72 C 2D C E 38 3A A FE 2C E7 1 C0 2 C3
E2 2E 7C 5C 07 4C 32 6C AE 73 23 2A 9F 2C 2E C 5C 72 4C 2D

i)
ii)
C2 7C 15 0 24 32 D6 A 73 823 A2 9 E2 2 7C 15C 07 4C 32 6C

iii)
E
C
B
E7 15 C0 724 C3 D6 CA E7 82 A2 A9 FE C2 E7C 15 07 24 32 D6 A

D
A
C1 C 72 C3 2D CA E7 382 3A A FE 2C E7 1 C0 24 C3 D6 CA E7

Jobs
II

IV
III

M3
M2
M1
5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E C1 5C 72 C3 2D CA E7 382

Task
07 4C 32D 6C AE 738 23 2A 9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A

Machine
24 32 6 A 73 23 A2 9 E2 2 7C 15 07 4C 32 6C AE 73 23 2A
C3 D CA E7 82 A A9 FE C2 E7 15 C0 24 3 D6 A 7 82 A2 9

C. Two bin system.


2D 6C E 38 3A 2A FE 2C E7 C1 C0 72 C3 2D CA E7 382 3A A9 FE
6C AE 738 23A 2A 9F 2C 2E C1 5C 72 4C3 2D 6C E7 38 3A 2A FE 2C
AE 73 23 2A 9F E2 2E 7C 5C 072 4C 2D 6C AE 38 23A 2A 9F 2C 2E
73 823 A2 9F E2 C2E 7C 15C 07 4C 32D 6C AE 738 23A 2A 9F E2C 2E 7C1

A. Pre requisites of PPC.


82 A2 A9 E C2 7C 15 07 24 32 6 A 73 23 2 9F E2 2E 7C 5C
3A A FE 2C E7 1 C0 24 C3 D CA E7 82 A A9 E C2 7 15 0

Write Short Notes on:-

B. JIT and its seven wastes.


3
5
4
6
5
2A 9FE 2C 2E C1 5C 72 C3 2D 6CA E7 382 3A 2A FE 2C E7 C1 C0 724
9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E7 C1 5C0 72 C3

2
4
2
A

E2 2E 7C 15C 07 4C 32 6C AE 73 23 2A 9F 2C 2E C 5C 72 4C 2D
55
37
32
51

C2 7C 15 0 24 32 D6 A 73 823 A2 9 E2 2 7C 15C 07 4C 32 6C
requirement of machine hours?

E7 15 C0 724 C3 D6 CA E7 82 A2 A9 FE C2 E7C 15 07 24 32 D6 A

Duration (days)
Product 1
C1 C 72 C3 2D CA E7 382 3A A FE 2C E7 1 C0 24 C3 D6 CA E7
5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E C1 5C 72 C3 2D CA E7 382
07 4C 32D 6C AE 738 23 2A 9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A
24 32 6 A 73 23 A2 9 E2 2 7C 15 07 4C 32 6C AE 73 23 2A

Normal
C3 D CA E7 82 A A9 FE C2 E7 15 C0 24 3 D6 A 7 82 A2 9
2D 6C E 38 3A 2A FE 2C E7 C1 C0 72 C3 2D CA E7 382 3A A9 FE
6C AE 738 23A 2A 9F 2C 2E C1 5C 72 4C3 2D 6C E7 38 3A 2A FE 2C
AE 73 23 2A 9F E2 2E 7C 5C 072 4C 2D 6C AE 38 23A 2A 9F 2C 2E
73 823 A2 9F E2 C2E 7C 15C 07 4C 32D 6C AE 738 23A 2A 9F E2C 2E 7C1

D. Forward scheduling and backward scheduling.


-

1600
1200
1000
1200
3000
82 A2 A9 E C2 7C 15 07 24 32 6 A 73 23 2 9F E2 2E 7C 5C

5
3
B

55
44
34
77

the three machines are given in the table below.

Page 2 of 2
3A A FE 2C E7 1 C0 24 C3 D CA E7 82 A A9 E C2 7 15 0

Cost (Rs)
2A 9FE 2C 2E C1 5C 72 C3 2D 6CA E7 382 3A 2A FE 2C E7 C1 C0 724
9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E7 C1 5C0 72 C3

Product 2
E2 2E 7C 15C 07 4C 32 6C AE 73 23 2A 9F 2C 2E C 5C 72 4C 2D
C2 7C 15 0 24 32 D6 A 73 823 A2 9 E2 2 7C 15C 07 4C 32 6C
E7 15 C0 724 C3 D6 CA E7 82 A2 A9 FE C2 E7C 15 07 24 32 D6 A

programming model that will maximize the daily profit.

*******************
C1 C 72 C3 2D CA E7 382 3A A FE 2C E7 1 C0 24 C3 D6 CA E7

follow others. Apart from this, jobs can run concurrently.


5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E C1 5C 72 C3 2D CA E7 382

Time per unit (minutes)

Draw the network and identify the critical path.


Machine

07 4C 32D 6C AE 738 23 2A 9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A


24 32 6 A 73 23 A2 9 E2 2 7C 15 07 4C 32 6C AE 73 23 2A
C3 D CA E7 82 A A9 FE C2 E7 15 C0 24 3 D6 A 7 82 A2 9
2D 6C E 38 3A 2A FE 2C E7 C1 C0 72 C3 2D CA E7 382 3A A9 FE

3
3
3
2
4

32D6CAE73823A2A9FE2C2E7C15C0724C
-
3
2
C

58
70
59
49

6C AE 738 23A 2A 9F 2C 2E C1 5C 72 4C3 2D 6C E7 38 3A 2A FE 2C

Crash the network fully to find out minimum duration.


Processing time (Hrs.)

AE 73 23 2A 9F E2 2E 7C 5C 072 4C 2D 6C AE 38 23A 2A 9F 2C 2E
73 823 A2 9F E2 C2E 7C 15C 07 4C 32D 6C AE 738 23A 2A 9F E2C 2E 7C1 Product 3
82 A2 A9 E C2 7C 15 07 24 32 6 A 73 23 2 9F E2 2E 7C 5C
3A A FE 2C E7 1 C0 24 C3 D CA E7 82 A A9 E C2 7 15 0

Duration (days)
What are the advantages and limitations of linear programming methods?

2A 9FE 2C 2E C1 5C 72 C3 2D 6CA E7 382 3A 2A FE 2C E7 C1 C0 724


9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E7 C1 5C0 72 C3
E2 2E 7C 15C 07 4C 32 6C AE 73 23 2A 9F 2C 2E C 5C 72 4C 2D

Crash
C2 7C 15 0 24 32 D6 A 73 823 A2 9 E2 2 7C 15C 07 4C 32 6C
E7 15 C0 724 C3 D6 CA E7 82 A2 A9 FE C2 E7C 15 07 24 32 D6 A
Paper / Subject Code: 42804 / Production Planning & Control

C1 C 72 C3 2D CA E7 382 3A A FE 2C E7 1 C0 24 C3 D6 CA E7
5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E C1 5C 72 C3 2D CA E7 382
07 4C 32D 6C AE 738 23 2A 9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A
D

55
54
68
55

430
470
440

24 32 6 A 73 23 A2 9 E2 2 7C 15 07 4C 32 6C AE 73 23 2

1600
2000
1800
2000
4000
C3 D CA E7 82 A A9 FE C2 E7 15 C0 24 3 D6 A 7 82 A2
capacity
Machine

2D 6C E 38 3A 2A FE 2C E7 C1 C0 72 C3 2D CA E7 382 3A A9

Cost (Rs)
(mins/day)

6C AE 738 23A 2A 9F 2C 2E C1 5C 72 4C3 2D 6C E7 38 3A 2A


AE 73 23 2A 9F E2 2E 7C 5C 072 4C 2D 6C AE 38 23A 2A 9F
given in the table below. How should the tasks be assigned to machines to minimize
A workshop has four machines and four tasks for completion. Each of the machines can
perform each of the four tasks. Time taken at each of the machines to complete each task is

A firm produces three products. These products are processed on three different machines.
The time required to manufacture one unit of each of three products and the daily capacity of

If indirect costs are Rs. 300 per day, determine time cost trade off for the project
profit per unit for product 1, 2, and 3 is Rs. 4, 3 and 6 respectively. It is assumed that all the
It is required to determine the daily number of units to be manufactured for each product. The

amounts produced are consumed in the market. Formulate the mathematical linear

73 823 A2 9F E2 C2E 7C 15C 07 4C 32D 6C AE 738 23A 2A 9F


82 A2 A9 E C2 7C 15 07 24 32 6 A 73 23 2 9F E
3A A FE 2C E7 1 C0 24 C3 D CA E7 82 A A9 E
2A 9FE 2C 2E C1 5C 72 C3 2D 6CA E7 382 3A 2A FE 2

(5)
(5)
(5)
(5)
9F 2C 2E 7C 5C 072 4C 2D 6C E 38 3A 2A 9FE 2C
(10)

B. List of activities for a job is given below. Job A must precede all others while job E must (10)
(10)

E2 2E 7C 15C 07 4C 32 6C AE 73 23 2A 9F 2C 2
C2 7C 15 0 24 32 D6 A 73 823 A2 9 E2 2
E7 15 C0 724 C3 D6 CA E7 82 A2 A9 FE C2 E
C1 C 72 C3 2D CA E7 382 3A A FE 2C E7
5C 072 4C 2D 6C E 38 3A 2A 9FE 2C 2E
07 4C 32D 6C AE 738 23 2A 9F 2C 2E 7C
24 32 6 A 73 23 A2 9 E2 2 7C
C3 D CA E7 82 A A9 FE C2 E7 15
2D 6C E 38 3A 2A FE 2C E7 C1
6 A 73 2 2 9 2 2 C 5

You might also like