Cryogenic Tank - Typical Construction Sequence PDF
Cryogenic Tank - Typical Construction Sequence PDF
Cryogenic Tank - Typical Construction Sequence PDF
LNG Tank
Full Containment
(9% inner wall + Pre-
Pre-stressed concrete outer wall)
Typical Construction Sequence
SOFREGAZ
Storage & loading on site
SOFREGAZ
Storage & loading on site
SOFREGAZ
Soil Improvement
STEP 1a – Soil Improvement (CMC)
SOFREGAZ
Soil Improvement
STEP 1b – Controlled Modulus Columns (CMC)
Bottom Slab
Ground Level
Transition Layer
Working Platform Level (CMC)
Concrete Wall
Bottom Slab
Stud Bolt
Detail of “A”
Re-bar
SOFREGAZ
Concrete slab
SOFREGAZ
Slab reinforcement &
prestressing cables casing
SOFREGAZ
LNG Storage Tanks - erection
STEP 2 – Concrete wall Re-bar Reinforcement
Concrete Forms
Anchor Plate to be installed.
Reinforcement
“B”
Detail of “B”
Concrete Form Concrete Form
Bottom Slab
Ground Level
SOFREGAZ
LNG Storage Tanks – erection
STEP 3 – Concrete wall
Re-bar Panel
Reinforcement
Concrete Forms
Re-bar
“C”
Platform Re-bar
Concrete Form
Concrete Form
Detail of “C”
Platform Platform
Bottom Slab
Ground Level
SOFREGAZ
LNG Storage Tanks – erection
STEP 4 – Concrete wall
Reinforcement
Re-bar Panel
Concrete Forms
“D” Platform
Re-bar Panel
Platform
Bottom Slab
Ground Level
SOFREGAZ
Jumping formwork
SOFREGAZ
LNG Storage Tanks – erection
STEP 6 – Assembly of roof center, outer supports
& outside rain protection From Crane
Ground Level
SOFREGAZ
Roof structure details
SOFREGAZ
Central temporary support
SOFREGAZ
Roof section lifting (25t)
SOFREGAZ
Roof section adjustment
SOFREGAZ
General view
SOFREGAZ
Roof plates welding
SOFREGAZ
Rainy weather impact
Taking care of rainy weather
conditions on site, bottom liner will
be erected & welding as soon as the
metallic roof is water tight
SOFREGAZ
LNG Storage Tanks – erection
STEP 7 – Assembly of roof sections and liner
plates
From From
Crane Crane
Outer Support
SOFREGAZ
Bottom liner plates welding
SOFREGAZ
LNG Storage Tanks – erection
STEP 8 – Assembly of Suspended deck
Temporary Support
Ground Level
SOFREGAZ
Suspended deck
SOFREGAZ
Suspended deck welding
SOFREGAZ
LNG Storage Tanks – erection
STEP 9 – Insulation work on Annular space
Concrete Wall
Outer Support
Detail of “E”
Roof Suspended Rod
SOFREGAZ
LNG Storage Tanks – erection
STEP 10 – Ring Plate(Compression Ring Plate)
Ring Plate
Detail of “F”
Roof
Suspended Deck
Ground Level
SOFREGAZ
Metallic compression ring
SOFREGAZ
Metallic compression ring
SOFREGAZ
LNG Storage Tanks – erection
STEP 11 – Roof Air Raising
Roof
Suspended Deck
Ground Level
SOFREGAZ
Roof at lowest position
SOFREGAZ
Venting equipment
SOFREGAZ
Air rising
SOFREGAZ
Connection with compression
ring
SOFREGAZ
Roof climbing
SOFREGAZ
Final position
SOFREGAZ
LNG Storage Tanks – erection
Roof Concrete STEP 13 – Side Liner Plate
(Vapor Barrier)
Hoist
Opening
Fabrication
①
Ground Level
SOFREGAZ
Wall liner erection & welding
SOFREGAZ
Corner protection insulation
SOFREGAZ
Corner protection plates
SOFREGAZ
LNG Storage Tanks – erection
Roof Concrete STEP 12 – Roof Concreting &
Pressurizing
Opening
Compressor
Ground Level
SOFREGAZ
Pressurization & concreting
SOFREGAZ
Pressurization & concreting
SOFREGAZ
LNG Storage Tanks – erection
Roof Concrete
STEP 14 – Inner
shell plates erection
Opening
Inner Shell Plate
Inner Shell Plate
Turning Table Inner Shell Plate
Ground Level
SOFREGAZ
LNG Storage Tanks – erection
Roof Concrete
STEP 15 – Secondary
barrier
Concrete Wall
PIR
“G”
Opening
Detail of “G”
Ground Level
SOFREGAZ
Inner tank shell erection
SOFREGAZ
Automatic welding machine
SOFREGAZ
Welding machine Operator
SOFREGAZ
Shell top stiffener
SOFREGAZ
LNG Storage Tanks – erection
Roof Concrete
STEP 16 – Bottom
Insulation and Plate
Opening “H”
Ground Level
SOFREGAZ
Foam Glass layers installation
SOFREGAZ
LNG Storage Tanks – erection
Roof Concrete
STEP 17 Pump Column
Pump Column
Opening
Ground Level
SOFREGAZ
Bottom inlet stand pipe
SOFREGAZ
Inlet top nozzle with splash
plate
SOFREGAZ
Pump column prefabrication
SOFREGAZ
Pump column erection
SOFREGAZ
Stilling well and bottom
connection
SOFREGAZ
Cool down ring
SOFREGAZ
Purge piping
SOFREGAZ
NDE
SOFREGAZ
DIMENSIONAL
SOFREGAZ
VACUUM BOX
SOFREGAZ
LIQUID PENETRANT TEST
SOFREGAZ
X-RAY INSPECTIONS
SOFREGAZ
ALLOY MATERIAL
IDENTIFICATION
SOFREGAZ
PRESSURE TEST
SOFREGAZ
AUTOMATIC US TEST
SOFREGAZ
LNG Storage Tanks – erection
PRV
STEP 18 Hydrostatic, vacuum and Pneumatic Test
Ground Level
SOFREGAZ
SEA WATER TEST
SOFREGAZ
Pumping station
SOFREGAZ
PRESSURE & VACUUM TEST
SOFREGAZ
LNG Storage Tanks – erection
Platform
Walkway STEP 19 TOP
PLATFORM
PRV Nozzle
Suspended Deck
Ground Level
SOFREGAZ
Metallic top platform
SOFREGAZ
SOFREGAZ
MAIN TOP PLATFORM
SOFREGAZ
SOFREGAZ
SOFREGAZ
SOFREGAZ
SOFREGAZ
SOFREGAZ
Instrumentation
SOFREGAZ
INSTRUMENTATION
SOFREGAZ
VACUUM VALVES
SOFREGAZ
SOFREGAZ
LNG Storage Tanks – erection
STEP 20 Wall Insulation
Glass Wool
Glass Wool
Inner Shell
Outer Shell
Gondola
Ground Level
SOFREGAZ
RESILIENT BLANKET
SOFREGAZ
RESILIENT BLANKET
SOFREGAZ
LNG Storage Tanks – erection
STEP 21 Dome Space Insulation & Perlite Powder Filling
Walkway
PRV Nozzle
Perlite Filling Nozzle
Glass Wool
Suspended Deck
Ground Level
SOFREGAZ
PERLITE FURNASE
SOFREGAZ
PERLITE VIBRATION &
RESERVE
SOFREGAZ
SUSPENDED DECK
INSULATION
SOFREGAZ
LNG Storage Tanks – erection
Nitrogen Inlet Line
Oxygen STEP 22 Box-up and Nitrogen Purging
Platform
Walkway
PRV Nozzle
Perlite Filling Nozzle
Suspended Deck
Ground Level
SOFREGAZ
DRYING EQUIPMENT
SOFREGAZ
N2 REGASIFICATION UNIT
SOFREGAZ
O2 ANALYSER & DEW POINT
SOFREGAZ