Rencana Anggaran Biaya

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN JEMBATAN TIMBANG


LOKASI : PT. MULTI NABATI SULAWESI UNIT MALEO

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOL SAT
(Rp) (Rp)
1 2 3 4 5 6
1. Pek. Pengukuran dan Pas. Bouwplank 1.00 Ls 1,000,000.00 1,000,000.00
2. Pek. Bongkaran dan Angkut Material 1.00 Ls 10,000,000.00 10,000,000.00
3. Pek. Galian Tanah 50.88 M3 54,500.00 2,772,960.00
4. Pek. Timbunan Tanah 12.72 M3 185,000.00 2,353,200.00
5. Pek. Cor Gelagar Beton Bertulang 40 x 60 cm 5.38 M3 4,136,447.90 22,237,543.89
6. Pek. Cor Beton Bertulang 20 x 30 cm Pinggiran RAM 2.78 M3 4,303,284.09 11,980,342.91
7. Pek. Cor Aboutmen Beton Bertulang 70 x 80 cm 3.36 M3 2,374,219.97 7,977,379.12
8. Pek. Cor Lantai Bertulang Besi Wiremess 12.72 M3 1,725,000.00 21,942,000.00
9. Load Sheel 4.00 Bh 11,000,000.00 44,000,000.00
10. U-Channel 200 x 90 x 8 mm x 6 m 5.00 Btg 4,500,000.00 22,500,000.00
11. U-Channel 150 x 55 x 6 mm x 6 m 3.00 Btg 3,750,000.00 11,250,000.00
12. W-Beam 150 x 75 x 5 x 7 mm x 6 m 6.00 Pcs 3,500,000.00 21,000,000.00
13. W-Beam 600 x 200 x 12 x 20 m x 6 m 4.00 Pcs 5,500,000.00 22,000,000.00
14. Checkered Plate 5 x 20 x 12 mm (Plat bmpa) 3.00 Lbr 13,000,000.00 39,000,000.00
15. Computer 1.00 Set 10,000,000.00 10,000,000.00
JUMLAH TOTAL 250,013,425.91
PEMBULATAN 250,000,000.00
TERBILANG : DUA RATUS LIMA PULUH JUTA RUPIAH
]
Maleo, November 2014
PT. MULTI NABATI SULAWESI UNIT MALEO

YOHANIS SOMPAH

You might also like