This document is a cost estimate for the construction of a weighing bridge at PT. Multi Nabati Sulawesi Unit Maleo in Maleo. It includes 15 line items with descriptions of work, quantities, unit prices, and total costs. The total estimated cost is Rp250,000,000 or approximately $17,500 USD for work including excavation, concrete work, installation of I-beams, checkered plates, and a computer.
This document is a cost estimate for the construction of a weighing bridge at PT. Multi Nabati Sulawesi Unit Maleo in Maleo. It includes 15 line items with descriptions of work, quantities, unit prices, and total costs. The total estimated cost is Rp250,000,000 or approximately $17,500 USD for work including excavation, concrete work, installation of I-beams, checkered plates, and a computer.
This document is a cost estimate for the construction of a weighing bridge at PT. Multi Nabati Sulawesi Unit Maleo in Maleo. It includes 15 line items with descriptions of work, quantities, unit prices, and total costs. The total estimated cost is Rp250,000,000 or approximately $17,500 USD for work including excavation, concrete work, installation of I-beams, checkered plates, and a computer.
This document is a cost estimate for the construction of a weighing bridge at PT. Multi Nabati Sulawesi Unit Maleo in Maleo. It includes 15 line items with descriptions of work, quantities, unit prices, and total costs. The total estimated cost is Rp250,000,000 or approximately $17,500 USD for work including excavation, concrete work, installation of I-beams, checkered plates, and a computer.
NO. URAIAN PEKERJAAN VOL SAT (Rp) (Rp) 1 2 3 4 5 6 1. Pek. Pengukuran dan Pas. Bouwplank 1.00 Ls 1,000,000.00 1,000,000.00 2. Pek. Bongkaran dan Angkut Material 1.00 Ls 10,000,000.00 10,000,000.00 3. Pek. Galian Tanah 50.88 M3 54,500.00 2,772,960.00 4. Pek. Timbunan Tanah 12.72 M3 185,000.00 2,353,200.00 5. Pek. Cor Gelagar Beton Bertulang 40 x 60 cm 5.38 M3 4,136,447.90 22,237,543.89 6. Pek. Cor Beton Bertulang 20 x 30 cm Pinggiran RAM 2.78 M3 4,303,284.09 11,980,342.91 7. Pek. Cor Aboutmen Beton Bertulang 70 x 80 cm 3.36 M3 2,374,219.97 7,977,379.12 8. Pek. Cor Lantai Bertulang Besi Wiremess 12.72 M3 1,725,000.00 21,942,000.00 9. Load Sheel 4.00 Bh 11,000,000.00 44,000,000.00 10. U-Channel 200 x 90 x 8 mm x 6 m 5.00 Btg 4,500,000.00 22,500,000.00 11. U-Channel 150 x 55 x 6 mm x 6 m 3.00 Btg 3,750,000.00 11,250,000.00 12. W-Beam 150 x 75 x 5 x 7 mm x 6 m 6.00 Pcs 3,500,000.00 21,000,000.00 13. W-Beam 600 x 200 x 12 x 20 m x 6 m 4.00 Pcs 5,500,000.00 22,000,000.00 14. Checkered Plate 5 x 20 x 12 mm (Plat bmpa) 3.00 Lbr 13,000,000.00 39,000,000.00 15. Computer 1.00 Set 10,000,000.00 10,000,000.00 JUMLAH TOTAL 250,013,425.91 PEMBULATAN 250,000,000.00 TERBILANG : DUA RATUS LIMA PULUH JUTA RUPIAH ] Maleo, November 2014 PT. MULTI NABATI SULAWESI UNIT MALEO