Pekerjaan Galian Tanah
Pekerjaan Galian Tanah
1
a. GalianKomEmbung
2
Luas G1 Luas G1
1
G1.1 = pxl 𝐺2.1 = 𝜋𝑟 2
2
1
=80x50 = 2 𝜋252
=4000 m2 = 981.7477042 m2
1
G1.2 = pxl 𝐺2.2 = 𝜋𝑟 2
2
1
=89x68 = 𝜋342
2
=6052 m2 = 1815.840554 m2
1
G1.3 =pxl 𝐺2.3 = 𝜋𝑟 2
2
1
=91x72 = 2 𝜋362
=6552 m2 = 2035.75204 m2
1
G1.4 =pxl 𝐺2.4 = 2 𝜋𝑟 2
1
=99x88 = 2 𝜋442
=8712 m2 = 3041.061689 m2
1
G1.5 =pxl 𝐺2.5 = 2 𝜋𝑟 2
1
=100.75x91.50 = 𝜋45.752
2
=9218.625 m2 = 3287.774887 m2
1
G1.6 =pxl 𝐺2.6 = 2 𝜋𝑟 2
1
=110.75x115.50 = 2 𝜋55.752
=12791.625 m2 = 4882.133158 m2
3
Luas kom Embung
L1 = 4000+981.7477042
=4981.747704m2
L2 =6052+1815.840554
=7867.840554m2
L3 =6552+2035.75204
=8587.75204m2
L4 =8712+3041.061689
=11753.061689m2
L5 =9218.625+3287.774887
=12506.39989m2
L6 =12791.625+4882.133158
=17673.75816m2
Volume
𝐿1 + 𝐿2
𝑉1 = ×𝑡
2
4981.747704 + 7867.840554
𝑉1 = ×3
2
𝑉1 = 19274.38239 m3
𝐿1 + 𝐿2
𝑉2 = ×𝑡
2
8587.75204 + 11753.061689
𝑉2 = ×4
2
𝑉2 = 40681.62744 m3
𝐿1 + 𝐿2
𝑉3 = ×𝑡
2
12506.39989 + 17673.75816
𝑉3 = ×5
2
𝑉3 = 75450.39513 m3
4
Volume kom Embung Total (VG1)
V1+V2+V3
=135406.405 m3
𝑉 = 𝐿1 × 𝑡𝑆𝑇𝑅𝐼𝑃𝑃𝐼𝑁𝐺
𝑉 = 4981.747704 × 0.3
𝑉3 = 1494.524311 m3
𝑉 = 𝑉𝐺1 − 𝑉𝐺2
𝑉 = 135406.405 − 1494.524311
𝑉 = 133911.8806 m3
Diketahui : B = 1.843 t/ m3
L = 1.545 t/m3
C = 1.795 t/ m3
𝐵−𝐿
𝑆𝑤 = 𝐿
× 100%
1.843−1.545
= 1.545
× 100%
= 0.193 × 100%
= 19.3%
𝐶−𝐵
𝑆ℎ = 𝐶
× 100%
1.795−1.843
= 1.795
× 100%
= −0.0267 × 100%
= −2.67%
5
VOLUME GALIAN (LCM)
6
b. Perkerjaan Urugan dan Tumpukan Tanah
𝑉 = 7468.5 m3
5+13
𝑉1 = 2
× 2 × (2 × (219 + 164)
𝑉1 = 17618 m3
𝑎+𝑏
Volume Tanggul (bawah)𝑉1 = 2
× 𝑡 × 𝐾𝑒𝑙𝑖𝑙𝑖𝑛𝑔 𝐴𝑠 𝑇𝑎𝑛𝑔𝑔𝑢𝑙
𝑎+𝑏
𝑉2 = 2
× 𝑡 × 𝐾𝑒𝑙𝑖𝑙𝑖𝑛𝑔 𝐴𝑠 𝑇𝑎𝑛𝑔𝑔𝑢𝑙
16.50+32.50
𝑉2 = × 4 × (2 × (219 + 164)
2
𝑉2 = 58996 m3
7
Volume tanggul total (VG5) = V1+V2
=17618+58996
=76614 m3
𝑉𝑐
1 − 0.0267 =
159756.8736
𝑉𝑐 = 155491.36507488 m3(CCM)
Selisih jumlah tanah galian dan timbunan = tanah galian − keperluan tanah timbunan
=155491.36507488 m3 −76614 m3
8
𝐿𝑎𝑡𝑎𝑠 +𝐿𝑏𝑎𝑤𝑎ℎ
VOLUME AIR = × 𝑡 + 𝑣𝑜𝑙 𝑉𝐺1
2
(214.00×159.00)+(186.50×131.50)
= 2
× 𝑡 + 135406.405
(34026+24524.75)
= 2
× 5 + 135406.405
58550.75
= 2
× 5 + 135406.405
= 146376.875+135406.405
= 281783.28 m3
MT I (Musim Hujan) :
MT II (MusimGadu) :