Package 1 - Post Test Rev1
Package 1 - Post Test Rev1
(PRODUCTION)
Name:……………………………………………………………
Staff No:…………………………………………..…………...
/100
Open
1. What is the purpose of having the Fire Fighting Equipment on the helideck?
a.
10
3. Where can the layout plan of the Fire Fighting equipment be obtained?
5
5. Why must the Fire Water Pump be test run periodically?
Open
6. Why must the status check be carried out on the Fire Water Pump on a daily basis?
10
10
10. Calculate the working duration of a 6 liters air cylinder with 300 barg pressure?
10
Open
11. Explain what is the Permit to Work system?
10
12. Name the certificates that can be extended, when a job is not completed within a shift.
10