MULTISKILL DEVELOPMENT TRAINING

(PRODUCTION)

Pre Test Assessment


Package 3

Name:……………………………………………………………

Staff No:…………………………………………..…………...

/100

Open
1. Define the purpose of the following chemical treatments:

 Crude Oil Demulsifier:


 Corrosion Inhibition:
 Scale Removal:

10

2. What are the various types of chemical injection pumps used in the oil and gas industry?

a.
10

3. What checks need to be carried out before commencing the chemical injection system?

15

4. Why must the wind direction be checked, prior to opening the tank cover?

5
Open
5. When is Diesel Fuel bunkering required?

6. What is the safe allowable limit of diesel to be stored on a platform?

7. Why is communication important during the diesel fuel bunkering process?

8. Why must the potable water be tested prior to bunkering?

9. When is potable water bunkering required?

Open
10. What is the purpose of Nitrogen in the oil and gas industry?

11. What is the purpose of the coalescing filters in the Nitrogen system?

12. Carbon Filters absorbs the hydrocarbon in the feed air supply and Particulate Filters removes solid
particles ion the Nitrogen system.

True

False

13. What is the purpose of the Flare system?

14. The Flare System is divided into two distinct sections. Name the two sections.

Open
15. The HP flare header is a system to collect gas being vented or blowdown from
…………………………………………………………………………

16. What is the purpose of the Drain System?

17. What is the purpose of the Closed Drain Vessel?