Equipment Foundation drawing DOCUMENT NO.

P.O.NO. AND DATE EQUIPMENT LOCATION REY-5585-1229-FD-006

YEI/BABRALA/PROJ/201
Refrigeration Unit
9/LOI/01 DATED ON BABRALA Sheet 01 of 02 Rev 1
(RFAL0070SC)
25.07.2019

Equipment Foundation drawing

Refrigeration Unit (RFAL0070SC)

1 REVISED AND 'ISSUED FOR APPROVAL 17-Sep-2019

0 ISSUED FOR APPROVAL D.YADAV S.RAKSHIT S.RAKSHIT 8-Aug-2019

REV. DESCRIPTION PREPARED CHECKED APPROVED DATE

This document is Reynold India's property and cannot be used by others for any purpose, without prior written consent.
NOTE: -
1. ALL DIMENSIONS ARE IN MM.

3. FOR DETAIL REFER THE GAD OF EQUIPMENT, DOC.


NO: REY-5585-1229-GAD-004

1000 1000

SPACE REQUIRED MAINTENANCE

250 287.5

HEIGHT OF 2METER MINIMUM FROM F.F.L.


FOR CONDENSER DESCALING UPTO A
3.0 METER CLEAR SPACE REQUIRED
SPACE REQUIRED
MAINTENANCE

CHILLER SKID
4400 2400 2400
1900 1825

250 1

1000 1000
SPACE REQUIRED FOR ELECTRICAL PANEL
OPERATION AND MAINTENANCE

1000 3500 3000


7500

01 REVISED ISSUED FOR 17.09.19 DY SR SR


APPROVAL

00 ISSUED FOR APPROVAL 08.08.19 DY SR SR

REV. DESCRIPTION DATE DRN. CHK. APP.


CLIENT:
M/S YARA FERTILIZERS INDIA PVT. LTD.
MANUFACTURER:
REYNOLD INDIA PVT. LTD. D:\LOGO\Reynold Lettar Head (Header) 1-1.jpg

Web : www.reynoldindia.com
DRAWING TITLE:
EQUIPMENT FOUNDATION DIAGRAM FOR WATER
EQUIPMENT LOAD COOLED AIR CHILLER MODEL - RFAL0070SC
1. STATIC LOAD 7,200 KG App. JOB NO. DRAWING NO.: SHEET REV. SCALE
2. OPERATING LOAD 7,700 KG App. 5585 REY-5585-1229-FD-006 2 OF 2 01 N.T.S.