Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

IIIA Works and Equipment for Bus Reactor Installation

The works for Bus reactor shall comply with Section 16 of the Technical Specification
and the particular requirements as detailed in the Schedule of Technical Requirements
included as Appendix A1 to this section and shall comprise the following:-
1.IIIA1 EMTP study (for 400kV Bogura Substation) shall be performed by the contractor through
Independent Expert with consent of Employer and shall include the following aspects but are
not limited to
i. to determine the requirement and the size of the Bus reactor at Bogura (W)
400kV Bus and resonance phenomena for Bogura (W) 400kV Substation.
ii. to determine the requirement, rating (kV, kJ, kA etc.),location and the number
of lighting arrester at Bogura 400kV switchyard
iii. to determine the value of Pre Insertion Resistor
iv. Switching Over Voltage study of Bogura-Rahanpur 400 kV Line
v. Iinsulation co-ordination with detail surge arrester modelling and requirements
for Point-on-Wave device and PIRs for each busbar.
vi. Switching surge analysis for 400 kV Bogura (W) Substation
– Re-closing time determination
- Closing/Re-closing Over Voltage study
- TRV analysis for circuit breaker
The EMTP study shall have to be performed using PSCAD software and shall include training
of six (06) Design Engineers of the Employer for two (2) weeks regarding the use of PSCAD
software for typical EMTP study including/having example of the said EMTP study under this
project. Soft copy with detail EMTP report & psacd files shall have to be submittedto Employer
during execution work.
1.IIIA2 Four (4) sets of 420 kV, Size: 125MVAR (only for Bid purpose, the final size shall be as per
the EMTP study to be done by the Contractor) (ONAN), three phase outdoor type Shunt
Reactor as specified in the technical specifications of this Section. It is to be mentioned that,
for change in MVar size of Shunt Reactor during execution based on EMTP study, the price
shall be adjusted as follows:
𝑵𝒆𝒘 𝑺𝒊𝒛𝒆
𝑷𝑵 = 𝟐𝟎% × 𝑷𝟎 ± 𝟖𝟎% × 𝑷𝟎 × ;
𝑶𝒍𝒅 𝑺𝒊𝒛𝒆
𝑊ℎ𝑒𝑟𝑒,
𝑃𝑁 = 𝑁𝑒𝑤 𝑝𝑟𝑖𝑐𝑒 , 𝑃0 = 𝑂𝑟𝑖𝑔𝑖𝑛𝑎𝑙 𝑝𝑟𝑖𝑐𝑒 (𝐶𝑜𝑟𝑟𝑒𝑐𝑡𝑒𝑑 𝐵𝑖𝑑 𝑝𝑟𝑖𝑐𝑒)

1.IIIA3 Deleted

1.IIIA4 Three (03) no. of 390kV rated voltage, 303kV(rms) continuous operating voltage at 50oC, 10kA
nominal discharge current, 50Hz, gapless metal oxide type, single phase surge arrestors

1.IIIA5 Control, Protection, Monitoring & Substation Automation System including event recording
function for Bus Reactor as specified in the technical specifications and bid drawings of
Volume 2 of 3 of the Bidding Document)

1.IIIA6 One (1) lot of rigid tubular bus [Aluminium of grade 63401 WP], flexible conductors, insulators,
fittings including all necessary clamps and connectors required for completing 420kV busbar
and switchgear connection for Bus Reactor bay as specified in the technical specifications and
bid drawings of Volume 2 of 3 of the Bidding Document
1.IIIA7 One (1) lot of steel structures for gantry, equipment supports and civil works required for com
pleting 420kV busbar and switchgear for Bus Reactor bay as specified in the technical
specification and bid drawings of Volume 2 of 3 of the Bidding Document.

You might also like