LOAD ANALYSIS Doc. No.

0318-00-16-50-4701
Page 1 of 4
Rev. No. A

LOAD ANALYSIS
FOR DABHOL RT & SV/IP STATIONS ALONG
PANVEL-DABHOL PIPELINE

GAIL(INDIA) LIMITED

A 20.03.06 ISSUED FOR ENGG./TENDER RS AM SKG

Rev. No Date Purpose Prepared by Reviewed by Approved by

Template No. 6116-3--0000-0015- Rev. 0 Copyrights EIL – All rights


reserved
Doc. No.0318-00-16-50-
LOAD ANALYSIS 4701
Page 2 of 4
Rev. No. A

NOTES & ASSUMPTIONS:-

1.0 FOR INTERMEDIATE SV/IP STATIONS / RECEIPT TERMINAL AT DABHOL

(a) 24V power source i.e.TEG(n+1)/CCVT(1+1) configuration along with battery back-up for
24hours has been considered for meeting the power requirements at the unmanned
stations.

(b) Air conditioning load has not been considered for SV/IP stations.

(c) Air conditioning load is considered only for Control room building at Dabhol.

(d) 24V DC(Floating) 1 no.feeder for Telecom and 1 no.feeder for SCADA shall be provided
at each SV/IP station. Any DC-DC conversion as required shall be in respective
Telecom/SCADA equipment to be supplied & installed by GAIL separately.The efficiency
of dual redundant DC to DC converters ito be provided in SCADA/Telecom equipment is
assumed as 0.7 in power source sizing calculations.

(e) Other loads considered are following:-

On Power source:-

- Exhaust fan in battery- 30W


- Exhaust fan in Elect.room- 30W
- Exhaust fan in Telecom/SCADA room- 30W
- Room Lighting load – 100W
- Fire alarm cum CO2 fire protection load- 25W

On Battery:-

- Exhaust fan in Elect.room- 30W


- Exhaust fan in Telecom/SCADA room- 30W
- Room Lighting load – 100W
Fire alarm cum CO2 fire protection load- 25W
(f) Boost charging requirement of batteries has not been considered in sizing of CCVT/TEG
ratings.

2.0 FOR RECEIPT TERMINAL AT DABHOL

(a) New building has been considered at Receipt Terminal at Dabhol. As such
indoor/outdoor lighting, air conditioning loads, etc. have been considered. Power
requirement is envisaged to be met through 2 nos.415V, TPN feeders from existing
power system of LNG Terminal at Dabhol.

Template No. 6116-3--0000-0015 Rev. 0 Copyrights EIL – All rights


reserved
Doc. No.0318-00-16-50-
LOAD ANALYSIS 4701
Page 3 of 4
Rev. No. A

LOAD ANALYSIS FOR DABHOL TERMINAL

LOAD ANALYSIS FOR RECEIPT TERMINAL AT DABHOL:-

SL. RATED Operating Rem-


No. EQPT. No. SERVICE Normal kW Standby kW Mech kW Eff kW pf kVA kVAR arks

CP system(AC
1 UPS load) 0.15 0.15 0.8 0.188 0.75 0.25 0.165
Instt.load at
230V AC (AC
2 UPS load) 1.6 1.6 0.8 2 0.8 2.5 1.5
Instt.Non UPS
3 load 0.4 0.4 0.8 0.5 0.75 0.667 0.441
4 SCADA Load 0.2 0.2 0.8 0.25 0.56 0.446 0.37

Telecom load
at 230V AC
5 (AC UPS load) 1.5 0.4 0.8 0.5 0.8 0.625 0.375
Non UPS
6 Telecom load 0.4 0.4 0.8 0.5 0.75 0.667 0.441
Fire alarm
load(AC UPS
7 load) 0.15 0.15 0.8 0.188 0.8 0.234 0.141
8 Lighting load 5 5 0.8 6.25 0.9 6.944 3.027
Air
conditioning
9 load 35 35 0.8 43.75 0.8 54.69 32.81
UPS battery
charging
load(Consideri
ng 100AH
battery, 291
10 cells) 12 12 0.8 15 0.9 16.67 7.265
TOTAL 56.4 0 69.13 46.54
Electrical Load Assessment:-
Maximum normal running load/Load demand(In terms of KVA) 83.33
Considering 10% margin maximum load demand(In terms of KVA) 91.66
i.e. 92 kVA

Template No. 6116-3--0000-0015 Rev. 0 Copyrights EIL – All rights


reserved
Doc. No.0318-00-16-50-
LOAD ANALYSIS 4701
Page 4 of 4
Rev. No. A

LOAD ANALYSIS FOR SV/IP STATION


Load on Load on Load on Battery
pow er pow er pow er rating(24
Sl. Load source at source at (- source Load on hours Pow er source
no. Station Description 24V(-ve) )48V at 24V Battery backup) rating & Nos.
1 SV-3/6 Telecom 250 357.143 357.14286 Battery
( without SCADA RTU 150 214.286 214.28571 selected:- 2
CP) Instt.(PLC Blind) 200 200 nos.700AH,
Batt.charging 100 24V; Power
O ther loads 215 185 source TEG-
(See note-1(f)) (3+1) nos.
TO TAL 150 0 979.286 956.42857 1328.373 500W ,24V
Considering TEG or CCVT-
10% design (1+1)
m argin 1077.21 no.1500W
2 SV-4 Telecom 450 642.857 642.85714 Battery
( without SCADA RTU 150 214.286 214.28571 selected:- 2
CP) Instt.(PLC Blind) 200 200 nos.900AH,
Batt.charging 100 24V; Power
O ther loads 215 185 source TEG-
(3+1) nos.
TO TAL 150 450 1179.29 1242.1429 1725.1984 500W ,24V
Considering TEG or CCVT-
10% design (1+1)
m argin 1297.21 no.1500W
3 SV-2 Telecom 450 642.857 642.85714
(w ith cp) RTU 150 214.286 214.28571 Battery
CP system 150 150 selected:- 2
Instt.(PLC Blind) 200 200 nos.1000AH,
Batt.charging 100 24V; Power
O ther loads 215 185 source TEG-
(4+1) nos.
TO TAL 150 450 1522.14 1392.1429 1933.5317 500W ,24V
Considering TEG or CCVT-
10% design (1+1)
m argin 1674.36 no.2000W
4 SV-1/5 Telecom 250 357.143 357.14286
(w ith cp) RTU 150 214.286 214.28571 Battery
CP system 150 150 selected:- 2
Instt.(PLC Blind) 200 200 nos.800AH,
Batt.charging 100 24V; Power
O ther loads 215 185 source TEG-
(3+1) nos.
TO TAL 150 250 1236.43 1106.4286 1536.7063 500W ,24V
Considering TEG or CCVT-
10% design (1+1)
m argin 1360.07 no.1500W
5 IP-1 Telecom 250 357.143 357.14286 Battery
(w ithout RTU 150 214.286 214.28571 selected:- 2
CP) Instt.(PLC Blind) 350 350 nos.800AH,
Batt.charging 100 24V; Power
O ther loads 215 185 source TEG-
(3+1) nos.
TO TAL 150 250 1236.43 1106.4286 1536.7063 500W ,24V
TEG or CCVT-
Considering (1+1)
10% design 1360.07 no.1500W
m argin
6 IP-2 Telecom 250 357.143 357.14286
(w ith CP) RTU 150 214.286 214.28571 Battery
CP system 150 150 selected:- 2
Instt.(PLC Blind) 350 350 nos.900AH,
Batt.charging 100 24V; Power
O ther loads 215 185 source TEG-
(3+1) nos.
TO TAL 150 250 1386.43 1256.4286 1745.0397 500W ,24V
Considering TEG or CCVT-
10% design (1+1)
m argin 1525.07 no.1500W