TOWER-2 TOWER-3
AIR COOLED
CHILLER-03

FAHU-B2-R-03
CHILLER
AIR COOLED PLANT
CHILLER-01 MANAGER

FAHU-B3-R-02
FAHU-B2-R-01
AIR COOLED CHILLERS VIA
SOFTWARE INTERFACE
AIR COOLED SITE KEY PLAN:
CHILLER-04

Q
P P P
FAHU-B2-R-04

AIR COOLED CHWP-R-01 CHWP-R-02 CHWP-R-03


VARIABLE SPEED PRIMARY PUMPS
CHILLER-02 PHASE 1
PHASE 2

FAHU-B2-R-02 FAHU-B3-R-01

3 4

GREF-B2-02,03 SPF-B2-05 TO 08 LPF-B2-01 TO 03 CPF-B2-01 TO 04 SEF-B2-01 TO 06 GREF-B2-01 SPF-B2-01 TO 04 LPF-B2-04 TO 06 CPF-B2-05 TO 12 SEF-B2-07 TO 12 GREF-B3-01 SPF-B3-R-01 TO 04 LPF-B3-01 TO 03 CPF-B3-01 TO 06 SEF-B3-01 TO 06 EXISTING
APPROVED

TCP / IP NETWORK
CABLES FROM BMS PANEL TO FIELD EQUIPMENT
2 1
TCP / IP NETWORK

CHEMICAL DOSING UNIT- 1 SET.

PRESSURIZATION UNITS -1 SET.


SMDB PMU SMDB
DDC-T3-ROOF-01 DDC-T3-ROOF-02 REFER NOTE NO -3
PMU MCC MCC KEY PLAN : NTS
EMCC MSFD MSFD MSFD MSFD MSFD EMCC
DDC-T2-ROOF-01 DDC-T2-ROOF-02 LOC - ROOF PMU LOC - ROOF
PMU FCU FCU FCU FCU FCU FCU
LOC - ROOF MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD LOC - ROOF MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD
GENERAL NOTES:
ROOF ROOF
REFER NOTE NO -3 NOTES:
REFER NOTE NO -3
DDC-T2-8F-01 1. THIS DRAWING IS THE COPYRIGHT OF PNC ARCHITECTS AND MUST
EIGHTH FLOOR LPG LPG LPG BTU BTU BTU FCU FCU FCU MSFD MSFD MSFD MSFD MSFD FCU FCU FCU BTU BTU BTU LPG LPG LPG NOT BE RETAINED,COPIED OR USED WITHOUT THE CONSULTANTS
LIFT - 01 LIFT - 02 FIRE LIFT - 03 LIFT - 04 LIFT - 05 FIRE LIFT - 06 CONSENT.
MSFD MSFD MSFD MSFD MSFD MSFD EIGHTH FLOOR
EIGHTH FLOOR 2. ALL STRUCTURAL, MEP, CIVIL AND LANDSCAPING QUERIES ARE TO BE
REFERRED TO THE RELEVANT CONSULTANTS DRAWINGS,
SPECIFICATIONS AND DETAILS.
REFER NOTE NO -3 PMU
DDC-T2-7F-01 FIRE LIFT - 01 LIFT - 02 LIFT - 03 REFER NOTE NO -3 3. ALL DESIGN AND CONSTRUCTION TO COMPLY WITH APPLICABLE
MSFD MSFD MSFD MSFD MSFD REGULATIONS AND LOCAL AUTHORITY REQUIREMENTS.
SEVENTH FLOOR DDC-T3-7F-01
PMU MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD
LPG LPG LPG BTU BTU BTU FCU FCU FCU FCU FCU FCU BTU BTU BTU LPG LPG LPG 4. CONTRACTORS AND SUBCONTRACTORS ARE TO CHECK ALL
SEVENTH FLOOR
SEVENTH FLOOR SEVENTH FLOOR DIMENSIONS AND LEVELS ON THE BUILDING SITE BEFORE COMMENCING
WITH ANY WORK.
REFER NOTE NO -3 REFER NOTE NO -3 5. ANY DISCREPANCY IN THE DRAWINGS, DIMENSIONS &
PMU
SPECIFICATIONS TO BE BROUGHT TO THE ATTENTION OF THE
LPG LPG LPG BTU BTU BTU FCU FCU FCU MSFD MSFD MSFD MSFD MSFD FCU FCU FCU BTU BTU BTU LPG LPG LPG CONSULTANT AND ARCHITECTS PRIOR TO ANY WORK BEING STARTED
PMU MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD
SIXTH FLOOR SIXTH FLOOR 6. ONLY FIGURED DIMENSIONS TO BE FOLLOWED - SCALED DIMENSIONS
OFF DRAWINGS WILL NOT BE PERMITTED.
REFER NOTE NO -3
PMU REFER NOTE NO -3 7. CONTRACTOR TO SUBMIT COORDINATED SHOP DRAWINGS FOR
ENGINEER'S APPROVAL PRIOR TO COMMENCEMENT OF WORK AT SITE.
MSFD MSFD MSFD MSFD MSFD
LPG LPG LPG BTU BTU BTU FCU FCU FCU FCU FCU FCU BTU BTU BTU LPG LPG LPG
PMU MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD
FIFTH FLOOR FIFTH FLOOR KEY/ADDITIONAL NOTES:
REFER NOTE NO -3
PMU
REFER NOTE NO -3 1. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE SPECIFICATIONS,
CONTROL SCHEMATICS, DATA POINT SCHEDULES AND OTHER
MSFD MSFD MSFD MSFD MSFD RELEVANT MEP DRAWINGS.
LPG LPG LPG BTU BTU BTU FCU FCU FCU FCU FCU FCU BTU BTU BTU LPG LPG LPG
PMU MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD
2. THIS SCHEMATIC IS A DIAGRAMMATIC REPRESENTATION ONLY.
FOURTH FLOOR FOURTH FLOOR
DDC LOCATION AND QUANTITY ARE INDICATIVE. EXACT QUANTITY AND
LOCATION TO BE CONFIRMED BY BMS VENDOR.
REFER NOTE NO -3
REFER NOTE NO -3 3. ALL QUANTITIES AND LOCATIONS OF EQUIPMENT CONNECTED TO
PMU BMS ARE INDICATIVE ONLY. BMS VENDOR SHALL COORDINATE,
MSFD MSFD MSFD MSFD MSFD CONSOLIDATE AND VERIFY WITH SPECIFICATIONS, SCHEMATICS AND OTHER
LPG LPG LPG BTU BTU BTU FCU FCU FCU FCU FCU FCU BTU BTU BTU LPG LPG LPG RELEVANT MEP DRAWINGS AND SPECIFICATIONS.
PMU MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD
THIRD FLOOR THIRD FLOOR

REFER NOTE NO -3
PMU
REFER NOTE NO -3
MSFD MSFD MSFD MSFD MSFD
LPG LPG LPG BTU BTU BTU FCU FCU FCU FCU FCU FCU BTU BTU BTU LPG LPG LPG
PMU MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD
SECOND FLOOR SECOND FLOOR

REFER NOTE NO -3 PMU REFER NOTE NO -3


DDC-T2-1F-01 DDC-T2-1F-02 MSFD MSFD MSFD MSFD MSFD
FCU FCU FCU FCU FCU FCU
FIRST FLOOR PMU MSFD MSFD MSFD MSFD MSFD MSFD MSFD FIRST FLOOR MSFD MSFD MSFD MSFD MSFD MSFD MSFD MSFD LPG LPG LPG BTU BTU BTU BTU BTU BTU LPG LPG LPG
FIRST FLOOR FIRST FLOOR

CAT 6 / BACNET/IP

CAT 6 / BACNET/IP

CABLES FROM BMS PANEL


TO FIELD EQUIPMENT
REFER NOTE NO -3
REFER NOTE NO -3
LPG LPG LPG BTU BTU BTU FCU FCU FCU FCU FCU FCU BTU BTU BTU LPG LPG LPG
PMU PMU PMU PMU
MSFD PMU PMU PMU MSFD MSFD MSFD MSFD MSFD
FIRE ALARM SYSTEM
FACP-3
DDC-T2-G-01 FIRE ALARM SYSTEM DDC-T3-GF-01 LOCATION - MAIN LOBBY
TCP / IP NETWORK

CCTV SYSTEM LPG LEAK DETECTION SYSTEM

TCP / IP NETWORK
FACP-2A & 2B
GROUND FLOOR LOCATION - LOBBY CCTV & FIRE COMMAND ROOM 2Nos - CCTV & FIRE COMMAND ROOM GROUND FLOOR
CLEANING AGENT SYSTEM
LOCATION - LV ROOM
CLEANING AGENT SYSTEM
LOCATION - CCTV & FIRE COMMAND ROOM
FIRE ALARM SYSTEM MAIN FACP
CCTV & FIRE COMMAND ROOM
GATE BARRIER CONTROL
SYSTEM
ISSUED FOR CONSTRUCTION
SMDB
MCC
EMCC

THE RELATIVE ±0.000M PROJECT


GROUND FLOOR GROUND FLOOR
LEVEL IS EQUAL TO ±3.461m (DMD)
LOCATION - BMS ROOM

TCP / IP NETWORK TCP / IP NETWORK


REVISIONS:
RESP.
ABBREVATION NO. DATE BY DESCRIPTION CONSULT
LEGEND
REFER NOTE NO -3 REPORT ALARM REFER NOTE NO -3 0 23/02/17 T.C ISSUED FOR CONSTRUCTION PNCA
PRINTER PRINTER BACNET / MSTP
BTU BTU BTU FCU FCU FCU FCU FCU FCU BTU BTU BTU

MODBUS CAT 6 / BACNET/IP

MODBUS

BACNET / IP
CO SENSORS
CABLES FROM BMS PANEL TO FIELD EQUIPMENT
MODBUS
DDC-TX-XX
LOC - 01-X-XX
XX-XX-XX ROOM
OUT STATION
BMS WORKSTATION
PMU FAHU FRESH AIR HANDLING UNIT

CPEF CAR PARK EXHAUST FAN


PMU INTERFACE PANEL
CPMF CAR PARK MAKE UP AIR FAN

CO SENSORS PMU BREF BATTERY ROOM EXHAUST FAN

DOMESTIC WATER TANK-1Nos. - 01-B-74 GREF GARBAGE ROOM EXHAUST FAN


CENTRAL
BATTERY SYSTEM GEF GARBAGE ROOM SUPPLY FAN CLIENT:
LOCATION - CBS ROOM
SEF SMOKE EXTRACT FAN
CO SENSORS
TRSF TRANSFORMER ROOM SUPPLY FAN
DOMESTIC WATER RE-CIRCULATION PUMP SET CPF
SUMP PUMP SET - 1D+1S - SP-11,12 CORRIDOR PRESSURIZATION FAN
1 SETS - 1D+1S
LOCATION - BASEMENT -01-B-42-
TREF
SOBHA SAPPHIRE BUILDING,
TRANSFORMER ROOM EXHAUST FAN
NEAR FIRE PUMP HEADER ROOM 13TH FLOOR , AL KHAIL ROAD,
LPF LIFT PRESSURIZATION FAN BUSINESS BAY, DUBAI

SUMP PUMP SET - 1D+1S - SP-05,06


LIGHTING SUMP PUMP SET - 1D+1S - SP-09,10
PMU
SPF STAIRCASE PRESSURIZATION FAN investments UNITED ARAB EMIRATES
P.O. BOX 125245 T: +971 4 4238064
LOCATION - PUMP ROOM BACNET / IP CONTROL PANEL LOCATION - BASEMENT -01-B-53 MSFD MOTORIZED SMOKE FIRE DAMPER
LOCATION - BASEMENT-TOWER 2 -BMS ROOM PMU
CO SENSORS CARBON MONOXIDE
CO

PMU
DOMESTIC WATER BOOSTER PUMP SET
2 SETS - 2D+1S
DDC-T2-B-02 CONDENSATE WATER TRANSFER PUMP
SET - 1D +1S -BASEMENT
SP SUMP PUMP
CONSULTANT:
LOC - BASEMENT - TOWER 2 SUMP PUMP SET - 1D+1S - SP-03,04 LPG LIQUEFIED PETROLEUM GAS
BMS ROOM -01-B-70 LOCATION - BASEMENT -01-B-91
MCC MOTOR CONTROL CENTRE
NEAR PLANT ROOM
CLEANING AGENT SYSTEM CONDENSATE WATER COLLECTION TANK EMCC ELECTRIC MOTOR CONTROL CENTRE
SUMP PUMP SET - 1D+1S - SP-01,02
LOCATION - MTR ROOM 1Nos - AC CONDENSATE ROOM LOCATION - BASEMENT -01-B-91 SOBHA SAPPHIRE BUILDING,
SMDB SUB MAIN DISTRIBUTION BOARD
NEAR CAR PARK EXHAUST FAN ROOM 8TH FLOOR , AL KHAIL ROAD,
DDC-T2-B-01 DDC-T2-B-03 FACP FIRE ALARM CONTROL PANEL BUSINESS BAY, DUBAI
LOC - PUMP ROOM -01-B-73 CLEANING AGENT SYSTEM LOC - BASEMENT - TOWER 2 CONDENSATE WATER TRANSFER PUMP SET - 1D+1S
LOCATION - BASEMENT PLANT ROOM PMU POWER MONITORING UNIT architects UNITED ARAB EMIRATES
P.O. BOX 122960 T: +971 4 4238054
LOCATION - CBS ROOM CAR PARK EXHAUST ROOM -01-B-53
DDC-T3-B-01 CCTV CLOSED CIRCUIT TELEVISION
LOC - BASEMENT - TOWER 3 SP STARTER PANEL
PLANT ROOM -01-B-89
CLEANING AGENT SYSTEM PRINTER ALARM PRINTER
LOCATION - BMS ROOM
CONDENSATE WATER COLLECTION TANK
PRINTER REPORT PRINTER
PROJECT:
SUMP PUMP SET - 1D+1S - SP-07,08
LOCATION - NEAR BMS ROOM BACNET / MSTP

CAR EXHAUST FAN ROOM - 01-B-91 LOCATION - BASEMENT PLANT ROOM SOBHA HARTLAND
SMDB
MCC
CPEF-01 GREENS - PHASE II
EMCC WATER FEATURE PUMP SET - 1D+1S BACNET / IP
SWIMMING POOL CHILLER
PLOT NO. 347-3283
PLANT AL MERKADH,
AIR COOLED CHILLERS VIA
MANAGER SOFTWARE INTERFACE DUBAI,
CHEMICAL DOSING UNIT- 1 SET. UNITED ARAB EMIRATES
CPEF-04 CPMF-01 CPMF-02 BATTERY ROOM EXHAUST FAN- 1D CPEF-02 CPEF-03 CPMF-03
LOCATION - CAR PARK CAR PARK MAKE UP AIR FAN BREF-B-01 CAR PARK EXHAUST FAN CAR PARK MAKE UP AIR FAN PRESSURIZATION UNITS -1 SET.
EXHAUST FAN ROOM 01-B-72

P P P

CHWP-B-01 CHWP-B-02 CHWP-B-03 DRAWING TITLE:


VARIABLE SPEED PRIMARY PUMPS

BASEMENT BASEMENT

PHASE 02
BMS SYSTEM ARCHITECTURE

SCALE: SHEET DRAWN CHECK APPROVED


SIZE: BY: BY: BY:

1:100 A0 T.C S.A S.A IFC


Drawing number: DWG STAGE:

15010-EE-APT0-3-BMS301

DM number: REV: 0

You might also like