Construction of NBBIA Package-1: 00 Site Preparation 01 Runways
Construction of NBBIA Package-1: 00 Site Preparation 01 Runways
Construction of NBBIA Package-1: 00 Site Preparation 01 Runways
Technical Associate
Habib Construction Services (Joint Venture)
G.TOTAL 73,565 5,19,861 Err:509 66,464 48,775 Err:509 1,27,279 Err:509 Err:509
QS SEC 92,885 640,000 608,000 89,616 62,000 887,800 91,544 429,250 887,800
Difference -19,320 -120,139 Err:509 -23,152 -13,225 Err:509 35,735 Err:509 Err:509
nstruction Ltd.Technical Associate
struction Services (Joint Venture)
Date:12-09-2012
Wearing Course
40mm
SM.
65,604
0
86,783
7,946
25,703
29,794
15,785
15,785
11,020
21,663
13,504
10,166
11,003
11,610
11,003
12,402
10,564
-
21,768
23,230
32,583
52,664
Wearing Course
40mm
15,850
9,553
5,15,983
520,799
-4,816
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet
Page 01
Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
ItemCode:- 01A-2C Description:- Cement Treated Base Course
Granular Sub-Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+190.00 to 1+271.82 1190
Lane 1 1 81.82 45.00 0.600 2209.14 Avg W
RG-02 RD 1+271.82 to 1+289.72 1271.82
Lane 1 1 17.90 46.15 0.600 495.65 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Lane 1 1 475.89 47.30 0.600 13505.76 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Lane 1 1 186.51 46.15 0.600 5164.46 Avg W
RG-02 RD 1+952.12 to 2+136.88 1952.12
Lane 1 1 184.76 45.00 0.600 4988.52 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Lane 1 1 56.69 46.15 0.600 1569.75 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Lane 1 1 414.93 47.30 0.600 11775.71 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Lane 1 1 143.57 46.15 0.600 3975.45 Avg W
RG-02 RD 2+752.07 to 2+937.49 2752.07
Lane 1 1 185.42 45.00 0.600 5006.34 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Lane 1 1 56.57 46.15 0.600 1566.42 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Lane 1 1 557.09 47.30 0.600 15810.21 Avg W
RG-02 RD 3+551.15 to 3+709.86 3551.15
Lane 1 1 158.71 46.15 0.600 4394.68 Avg W
RG-02 RD 3+709.86 to 3+887.03 3709.86
Lane 1 1 177.17 45.00 0.600 4783.59 Avg W
RG-02 RD 3+887.03 to 3+951.77 3887.03
Lane 1 1 64.74 46.15 0.600 1792.65 Avg W
RG-02 RD 3+951.77 to 4+184.05 3951.77
Lane 1 1 232.28 47.30 0.600 6592.11 Avg W
RG-02 RD 4+184.05 to 4+243.19 4184.05
Lane 1 1 59.14 46.15 0.600 1637.59 Avg W
RG-02 RD 4+243.19 to 4+355.71 4243.19
Lane 1 1 112.52 45.00 0.600 3038.09 4355.712
RG-02 RD 4+355.71 to 4+426.21 4355.712
Lane 1 1 70.50 46.15 0.600 1952.15 Avg W
Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
ItemCode:- 01A-2C Description:- Cement Treated Base Course
Granular Sub-Base Course
Page 02
No of Detail
No in of Measurements
Description Units Each L B D/H Quantity Remarks
90258.27
RG-02 RD 4+426.21 to 4+608.08 4426.212
Lane 1 1 181.87 47.30 0.600 5161.47 Avg W
RG-02 RD 4+608.08 to 4+678.66 4608.082
Lane 1 1 70.58 46.15 0.600 1954.36 Avg W
RG-02 RD 4+678.66 to 4+847.42 4678.662
Lane 1 1 168.76 45.00 0.600 4556.52 Avg W
Total 101930.62
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet
Page 01
Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
ItemCode:- 01A-3C Description:- Crush Aggregate BaseCement
CourseTreated Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BLAST PAD
RG-01 RD 1+070.00 to 1+172.50 1070.00
Lane 1 1 102.50 45.00 0.200 922.50 Avg W
Shoulder B/side 2 1 102.50 8.42 0.200 345.22 Avg W
RG-01 RD 1+070.00 to 1+190.00 1172.5
Lane 1 1 17.50 45.00 0.200 157.50 Avg W
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+190.00 to 1+271.82 1190
Lane 1 1 81.82 45.00 0.550 2025.05 Avg W
RG-02 RD 1+271.82 to 1+289.72 1271.82
Lane 1 1 17.90 45.43 0.550 447.21 Avg W
Shoulder R/side 1 1 17.90 7.94 0.200 28.43 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Lane 1 1 475.89 45.85 0.550 12000.76 Avg W
Shoulder B/side 2 1 475.89 8.38 0.200 1595.18 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Lane 1 1 186.51 45.43 0.550 4659.72 Avg W
Shoulder L/side 1 1 186.51 7.94 0.200 296.18 Avg W
RG-02 RD 1+952.12 to 2+136.88 1952.12
Lane 1 1 184.76 45.00 0.550 4572.81 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Lane 1 1 56.69 45.43 0.550 1416.33 Avg W
Shoulder R/side 1 1 56.69 7.94 0.200 90.02 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Lane 1 1 414.93 45.85 0.550 10463.50 Avg W
Shoulder B/side 2 1 414.93 8.38 0.200 1390.85 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Lane 1 1 143.57 45.43 0.550 3586.92 Avg W
Shoulder L/side 1 1 143.57 7.94 0.200 227.99 Avg W
RG-02 RD 2+752.07 to 2+937.49 2752.07
Lane 1 1 185.42 45.00 0.550 4589.15 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Lane 1 1 56.57 45.43 0.550 1413.33 Avg W
Shoulder R/side 1 1 56.57 7.94 0.200 89.83 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Lane 1 1 557.09 45.85 0.550 14048.42 Avg W
Shoulder B/side 2 1 557.09 8.38 0.200 1867.37 Avg W
Total 102095.73
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet Page 01
Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
ItemCode:- 01A-4C Description:- Cement Treated Base Course
Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+190.00 to 1+271.82 1190
Lane 1 1 81.82 45.00 0.100 368.19 Avg W
RG-02 RD 1+271.82 to 1+289.72 1271.82
Lane 1 1 17.90 45.00 0.100 80.55 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Lane 1 1 475.89 45.00 0.100 2141.51 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Lane 1 1 186.51 45.00 0.100 839.30 Avg W
RG-02 RD 1+952.12 to 2+136.88 1952.12
Lane 1 1 184.76 45.00 0.100 831.42 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Lane 1 1 56.69 45.00 0.100 255.11 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Lane 1 1 414.93 45.00 0.100 1867.19 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Lane 1 1 143.57 45.00 0.100 646.07 Avg W
RG-02 RD 2+752.07 to 2+937.49 2752.07
Lane 1 1 185.42 45.00 0.100 834.39 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Lane 1 1 56.57 45.00 0.100 254.57 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Lane 1 1 557.09 45.00 0.100 2506.91 Avg W
RG-02 RD 3+551.15 to 3+709.86 3551.15
Lane 1 1 158.71 45.00 0.100 714.20 Avg W
RG-02 RD 3+709.86 to 3+887.03 3709.86
Lane 1 1 177.17 45.00 0.100 797.27 Avg W
RG-02 RD 3+887.03 to 3+951.77 3887.03
Lane 1 1 64.74 45.00 0.100 291.33 Avg W
RG-02 RD 3+951.77 to 4+184.05 3951.77
Lane 1 1 232.28 45.00 0.100 1045.26 Avg W
RG-02 RD 4+184.05 to 4+243.19 4184.05
Lane 1 1 59.14 45.00 0.100 266.13 Avg W
RG-02 RD 4+243.19 to 4+355.71 4243.19
Lane 1 1 112.52 45.00 0.100 506.35 4355.712
RG-02 RD 4+355.71 to 4+426.21 4355.712
Lane 1 1 70.50 45.00 0.100 317.25 Avg W
RG-02 RD 4+426.21 to 4+608.08 45
Lane 1 1 181.87 45.00 0.100 818.42 Avg W
Carried over to next page 15381.37
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet Page 02
Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
ItemCode:- 01A-4C Description:- Cement Treated Base Course
Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
15381.37
RG-02 RD 4+608.08 to 4+678.66 226.87
Lane 1 1 70.58 45.00 0.100 317.61 Avg W
RG-02 RD 4+678.66 to 4+847.42 297.45
Lane 1 1 168.76 45.00 0.100 759.42 Avg W
Total 16458.40
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet
Page 01
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-6C Description:- Bituminous Binder Course
a) 75 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+190.00 to 1+271.82 1190
Lane 1 1 81.82 45.00 - 3681.90 Avg W
RG-02 RD 1+271.82 to 1+289.72 1271.82
Lane 1 1 17.90 45.00 - 805.50 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Lane 1 1 475.89 45.00 - 21415.05 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Lane 1 1 186.51 45.00 - 8392.95 Avg W
RG-02 RD 1+952.12 to 2+136.88 1952.12
Lane 1 1 184.76 45.00 - 8314.20 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Lane 1 1 56.69 45.00 - 2551.05 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Lane 1 1 414.93 45.00 - 18671.85 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Lane 1 1 143.57 45.00 - 6460.65 Avg W
RG-02 RD 2+752.07 to 2+937.49 2752.07
Lane 1 1 185.42 45.00 - 8343.90 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Lane 1 1 56.57 45.00 - 2545.65 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Lane 1 1 557.09 45.00 - 25069.05 Avg W
RG-02 RD 3+551.15 to 3+709.86 3551.15
Lane 1 1 158.71 45.00 - 7141.95 Avg W
RG-02 RD 3+709.86 to 3+887.03 3709.86
Lane 1 1 177.17 45.00 - 7972.65 Avg W
RG-02 RD 3+887.03 to 3+951.77 3887.03
Lane 1 1 64.74 45.00 - 2913.30 Avg W
RG-02 RD 3+951.77 to 4+184.05 3951.77
Lane 1 1 232.28 45.00 - 10452.60 Avg W
RG-02 RD 4+184.05 to 4+243.19 4184.05
Lane 1 1 59.14 45.00 - 2661.30 Avg W
RG-02 RD 4+243.19 to 4+355.71 4243.19
Lane 1 1 112.52 45.00 - 5063.49 4355.712
RG-02 RD 4+355.71 to 4+426.21 4355.712
Lane 1 1 70.50 45.00 - 3172.50 Avg W
Total 164583.99
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Total 14046.59
Lagan Construction Ltd.Technical Associate
Habib Construction
Construction OfServices
NBBIA(Joint Venture)
Package-1
Measurements Sheet
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-6C Description:- Bituminous Binder Course
a) 40 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+271.82 to 1+289.72 1271.82
Shoulder R/side 1 1 17.90 7.69 - 137.65 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Shoulder B/side 2 1 475.89 7.88 - 7500.03 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Shoulder L/side 1 1 186.51 7.69 - 1434.26 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Shoulder R/side 1 1 56.69 7.69 - 435.95 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Shoulder B/side 2 1 414.93 7.88 - 6539.30 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Shoulder L/side 1 1 143.57 7.69 - 1104.05 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Shoulder R/side 1 1 56.57 7.69 - 435.02 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Shoulder B/side 2 1 557.09 7.88 - 8779.74 Avg W
RG-02 RD 3+551.15 to 3+709.86 3551.15
Shoulder L/side 1 1 158.71 7.69 - 1220.48 Avg W
RG-02 RD 3+887.03 to 3+951.77 388.03
Shoulder R/side 1 1 64.74 7.69 - 497.85 Avg W
RG-02 RD 3+951.77 to 4+184.05 452.77
Shoulder B/side 2 1 232.28 7.88 - 3660.73 Avg W
RG-02 RD 4+184.05 to 4+243.19 685.05
Shoulder R/side 1 1 59.14 7.69 - 454.79 Avg W
RG-02 RD 4+355.71 to 4+426.21 4355.712
Shoulder R/side 1 1 70.50 7.69 - 542.15 Avg W
RG-02 RD 4+426.21 to 4+608.08 4426.212
Shoulder B/side 2 1 181.87 7.88 - 2866.27 Avg W
RG-02 RD 4+608.08 to 4+678.66 4608.082
Shoulder R/side 1 1 70.58 7.69 - 542.76 Avg W
TOTAL 36151.02
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet
Page 01
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-7C Description:- Bituminous Wearing Course
a) 50 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+190.00 to 1+271.82 1190
Lane 1 1 81.82 45.00 - 3681.90 Avg W
RG-02 RD 1+271.82 to 1+289.72 1271.82
Lane 1 1 17.90 45.00 - 805.50 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Lane 1 1 475.89 45.00 - 21415.05 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Lane 1 1 186.51 45.00 - 8392.95 Avg W
RG-02 RD 1+952.12 to 2+136.88 1952.12
Lane 1 1 184.76 45.00 - 8314.20 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Lane 1 1 56.69 45.00 - 2551.05 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Lane 1 1 414.93 45.00 - 18671.85 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Lane 1 1 143.57 45.00 - 6460.65 Avg W
RG-02 RD 2+752.07 to 2+937.49 2752.07
Lane 1 1 185.42 45.00 - 8343.90 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Lane 1 1 56.57 45.00 - 2545.65 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Lane 1 1 557.09 45.00 - 25069.05 Avg W
RG-02 RD 3+551.15 to 3+709.86 3551.15
Lane 1 1 158.71 45.00 - 7141.95 Avg W
RG-02 RD 3+709.86 to 3+887.03 3709.86
Lane 1 1 177.17 45.00 - 7972.65 Avg W
RG-02 RD 3+887.03 to 3+951.77 3887.03
Lane 1 1 64.74 45.00 - 2913.30 Avg W
RG-02 RD 3+951.77 to 4+184.05 3951.77
Lane 1 1 232.28 45.00 - 10452.60 Avg W
RG-02 RD 4+184.05 to 4+243.19 4184.05
Lane 1 1 59.14 45.00 - 2661.30 Avg W
RG-02 RD 4+243.19 to 4+355.71 4243.19
Lane 1 1 112.52 45.00 - 5063.49 4355.712
RG-02 RD 4+355.71 to 4+426.21 4355.712
Lane 1 1 70.50 45.00 - 3172.50 Avg W
Total 164583.99
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Total 48442.13
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+190.00 to 1+271.82 1190
Lane 1 1 81.82 0.00 - 0.00 Avg W
RG-02 RD 1+271.82 to 1+289.72 1271.82
Lane 1 1 17.90 0.00 - 0.00 Avg W
Shoulder R/side 1 1 17.90 0.00 - 0.00 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Lane 1 1 475.89 0.00 - 0.00 Avg W
Shoulder B/side 2 1 475.89 0.00 - 0.00 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Lane 1 1 186.51 0.00 - 0.00 Avg W
Shoulder L/side 1 1 186.51 0.00 - 0.00 Avg W
RG-02 RD 1+952.12 to 2+136.88 1952.12
Lane 1 1 184.76 0.00 - 0.00 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Lane 1 1 56.69 0.00 - 0.00 Avg W
Shoulder R/side 1 1 56.69 0.00 - 0.00 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Lane 1 1 414.93 0.00 - 0.00 Avg W
Shoulder B/side 2 1 414.93 0.00 - 0.00 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Lane 1 1 143.57 0.00 - 0.00 Avg W
Shoulder L/side 1 1 143.57 0.00 - 0.00 Avg W
RG-02 RD 2+752.07 to 2+937.49 2752.07
Lane 1 1 185.42 0.00 - 0.00 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Lane 1 1 56.57 0.00 - 0.00 Avg W
Shoulder R/side 1 1 56.57 0.00 - 0.00 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Lane 1 1 557.09 0.00 - 0.00 Avg W
Shoulder B/side 2 1 557.09 0.00 - 0.00 Avg W
RG-02 RD 3+551.15 to 3+709.86 3551.15
Lane 1 1 158.71 0.00 - 0.00 Avg W
Shoulder L/side 1 1 158.71 0.00 - 0.00 Avg W
RG-02 RD 3+709.86 to 3+887.03 3709.86
Lane 1 1 177.17 0.00 - 0.00 Avg W
RG-02 RD 3+887.03 to 3+951.77 3887.03
Lane 1 1 64.74 0.00 - 0.00 Avg W
Shoulder R/side 1 1 64.74 0.00 - 0.00 Avg W
RG-02 RD 3+951.77 to 4+184.05 3951.77
Lane 1 1 232.28 0.00 - 0.00 Avg W
Shoulder B/side 2 1 232.28 0.00 - 0.00 Avg W
RG-02 RD 4+184.05 to 4+243.19 4184.05
Lane 1 1 59.14 0.00 - 0.00 Avg W
Shoulder R/side 1 1 59.14 0.00 - 0.00 Avg W
RG-02 RD 4+243.19 to 4+355.71 4243.19
Lane 1 1 112.52 0.00 - 0.00 4355.712
RG-02 RD 4+355.71 to 4+426.21 4355.712
Lane 1 1 70.50 0.00 - 0.00 Avg W
Shoulder R/side 1 1 70.50 0.00 - 0.00 Avg W
RG-02 RD 4+426.21 to 4+608.08 4426.212
Lane 1 1 181.87 0.00 - 0.00 Avg W
Shoulder B/side 2 1 181.87 0.00 - 0.00 Avg W
RG-02 RD 4+608.08 to 4+678.66 4608.082
Lane 1 1 70.58 0.00 - 0.00 Avg W
Shoulder R/side 1 1 70.58 0.00 - 0.00 Avg W
RG-02 RD 4+678.66 to 4+847.42 4678.662
Lane 1 1 168.76 0.00 - 0.00 Avg W
BLAST PAD
RG-01 RD 1+070.00 to 1+172.50 1070.00
Lane 1 1 102.50 0.00 - 0.00 Avg W
Shoulder B/side 2 1 102.50 0.00 - 0.00 Avg W
RG-01 RD 1+070.00 to 1+190.00 1172.5
Lane 1 1 17.50 0.00 - 0.00 Avg W
BLAST PAD
RG-01 RD 4+847.42 to 4+864.92 4847.422
Lane 1 1 17.50 0.00 - 0.00 Avg W
RG-01 RD 4+864.92 to 4+967.41 4864.922
Lane 1 1 102.49 0.00 - 0.00 Avg W
Shoulder B/side 2 1 102.49 0.00 - 0.00 Avg W
1271.82 81.82
45 45 45
1289.72 17.9
46.15 46.15 46.15
1765.61 475.89
47.3 47.3 47.3
1952.12 186.51
46.15 46.15 46.15
2136.88 184.76
45 45 45
2193.57 56.69
46.15 46.15 46.15
2608.5 414.93
47.3 47.3 47.3
2752.07 143.57
46.15 46.15 46.15
2937.49 185.42
45 45 45
2994.06 56.57
46.15 46.15 46.15
3551.15 557.09
47.3 47.3 47.3
3709.86 158.71
46.15 46.15 46.15
3887.03 177.17
45 45 45
3951.77 64.74
46.15 46.15 46.15
4184.05 232.28
47.3 47.3 47.3
4243.19 59.14
46.15 46.15 46.15
4355.712 112.522
45 45 45
4426.212 70.5
46.15 46.15 46.15
4608.082 181.87
47.3 47.3 47.3
4678.662 70.58
46.15 46.15 46.15
4847.422 168.76
45 45 45
1172.5 102.5
45 45 45
8.42 8.42 8.42
1190 17.5
45 45 45
1271.82 81.82
45 45 45
1289.72 17.9
45.425 45.425 45.425
7.94 7.94 7.94
1765.61 475.89
45.85 45.85 45.85
8.38 8.38 8.38
1952.12 186.51
45.425 45.425 45.425
7.94 7.94 7.94
2136.88 184.76
45 45 45
2193.57 56.69
45.425 45.425 45.425
7.94 7.94 7.94
2608.5 414.93
45.85 45.85 45.85
8.38 8.38 8.38
2752.07 143.57
45.425 45.425 45.425
7.94 7.94 7.94
2937.49 185.42
45 45 45
2994.06 56.57
45.425 45.425 45.425
7.94 7.94 7.94
3551.15 557.09
45.85 45.85 45.85
8.38 8.38 8.38
3709.86 158.71
45.425 45.425 45.425
7.94 7.94 7.94
3887.03 177.17
45 45 45
3951.77 64.74
45.425 45.425 45.425
7.94 7.94 7.94
4184.05 232.28
45.85 45.85 45.85
8.38 8.38 8.38
4243.19 59.14
45.425 45.425 45.425
7.94 7.94 7.94
4355.712 112.522
45 45 45
4426.212 70.5
45.425 45.425 45.425
7.94 7.94 7.94
4608.082 181.87
45.85 45.85 45.85
8.38 8.38 8.38
4678.662 70.58
45.425 45.425 45.425
7.94 7.94 7.94
4847.422 168.76
45 45 45
4864.922 17.5
45 45 45
4967.412 102.49
45 45 45
8.42 8.42 8.42
1271.82 81.82
45 45 45
1289.72 17.9
45 45 45
1765.61 475.89
45 45 45
1952.12 186.51
45 45 45
2136.88 184.76
45 45 45
2193.57 56.69
45 45 45
2608.5 414.93
45 45 45
2752.07 143.57
45 45 45
2937.49 185.42
45 45 45
2994.06 56.57
45 45 45
3551.15 557.09
45 45 45
3709.86 158.71
45 45 45
3887.03 177.17
45 45 45
3951.77 64.74
45 45 45
4184.05 232.28
45 45 45
4243.19 59.14
45 45 45
4355.712 112.522
45 45 45
4426.212 70.5
45 45 45
226.87 181.87
45 45 45
297.45 70.58
45 45 45
466.21 168.76
45 45 45
1271.82 81.82
45 45 45
1289.72 17.9
45 45 45
1765.61 475.89
45 45 45
1952.12 186.51
45 45 45
2136.88 184.76
45 45 45
2193.57 56.69
45 45 45
2608.5 414.93
45 45 45
2752.07 143.57
45 45 45
2937.49 185.42
45 45 45
2994.06 56.57
45 45 45
3551.15 557.09
45 45 45
3709.86 158.71
45 45 45
3887.03 177.17
45 45 45
3951.77 64.74
45 45 45
4184.05 232.28
45 45 45
4243.19 59.14
45 45 45
4355.712 112.522
45 45 45
4426.212 70.5
45 45 45
4608.082 181.87
45 45 45
4678.662 70.58
45 45 45
4847.422 168.76
45 45 45
1172.5 102.5
45 45 45
7.92 7.92 7.92
1190 17.5
45 45 45
4864.922 17.5
45 45 45
4967.412 102.49
45 45 45
7.92 7.92 7.92
1289.72 17.9
7.69 7.69 7.69
1765.61 475.89
7.88 7.88 7.88
1952.12 186.51
7.69 7.69 7.69
2193.57 56.69
7.69 7.69 7.69
2608.5 414.93
7.88 7.88 7.88
2752.07 143.57
7.69 7.69 7.69
2994.06 56.57
7.69 7.69 7.69
3551.15 557.09
7.88 7.88 7.88
3709.86 158.71
7.69 7.69 7.69
452.77 64.74
7.69 7.69 7.69
685.05 232.28
7.88 7.88 7.88
744.19 59.14
7.69 7.69 7.69
4426.212 70.5
7.69 7.69 7.69
4608.082 181.87
7.88 7.88 7.88
4678.662 70.58
7.69 7.69 7.69
1271.82 81.82
45 45 45
1289.72 17.9
45 45 45
1765.61 475.89
45 45 45
1952.12 186.51
45 45 45
2136.88 184.76
45 45 45
2193.57 56.69
45 45 45
2608.5 414.93
45 45 45
2752.07 143.57
45 45 45
2937.49 185.42
45 45 45
2994.06 56.57
45 45 45
3551.15 557.09
45 45 45
3709.86 158.71
45 45 45
3887.03 177.17
45 45 45
3951.77 64.74
45 45 45
4184.05 232.28
45 45 45
4243.19 59.14
45 45 45
4355.712 112.522
45 45 45
4426.212 70.5
45 45 45
4608.082 181.87
45 45 45
4678.662 70.58
45 45 45
4847.422 168.76
45 45 45
1172.5 102.5
45 45 45
7.5 7.5 7.5
1190 17.5
45 45 45
1289.72 17.9
7.5 7.5 7.5
1765.61 475.89
7.5 7.5 7.5
1952.12 186.51
7.5 7.5 7.5
2193.57 56.69
7.5 7.5 7.5
2608.5 414.93
7.5 7.5 7.5
2752.07 143.57
7.5 7.5 7.5
2994.06 56.57
7.5 7.5 7.5
3551.15 557.09
7.5 7.5 7.5
3709.86 158.71
7.5 7.5 7.5
452.77 64.74
7.5 7.5 7.5
685.05 232.28
7.5 7.5 7.5
744.19 59.14
7.5 7.5 7.5
4426.212 70.5
7.5 7.5 7.5
4608.082 181.87
7.5 7.5 7.5
4678.662 70.58
7.5 7.5 7.5
4864.922 17.5
45 45 45
4967.412 102.49
45 45 45
7.5 7.5 7.5
1271.82 81.82
0 0 0
1289.72 17.9
0 0 0
0 0 0
1765.61 475.89
0 0 0
0 0 0
1952.12 186.51
0 0 0
0 0 0
2136.88 184.76
0 0 0
2193.57 56.69
0 0 0
0 0 0
2608.5 414.93
0 0 0
0 0 0
2752.07 143.57
0 0 0
0 0 0
2937.49 185.42
0 0 0
2994.06 56.57
0 0 0
0 0 0
3551.15 557.09
0 0 0
0 0 0
3709.86 158.71
0 0 0
0 0 0
3887.03 177.17
0 0 0
3951.77 64.74
0 0 0
0 0 0
4184.05 232.28
0 0 0
0 0 0
4243.19 59.14
0 0 0
0 0 0
4355.712 112.522
0 0 0
4426.212 70.5
0 0 0
0 0 0
4608.082 181.87
0 0 0
0 0 0
4678.662 70.58
0 0 0
0 0 0
4847.422 168.76
0 0 0
1172.5 102.5
0 0 0
0 0 0
1190 17.5
0 0 0
4864.922 17.5
0 0 0
4967.412 102.49
0 0 0
0 0 0
Binder
75mm
L
B
Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 205.00 -
Lane With 1/S Shoulder 60+7.5 - -
Lane Without Shoulder - 35.00 -
BCP
Lane With B/S Shoulder 60+7.50+7.50 1862.06 60.00
Lane With 1/S Shoulder 60+7.5 884.91 60.00
Lane Without Shoulder 60 910.45 60.00
3897.42
Binder
75mm
Total
-
-
-
111723.60
53094.60
54627.00
219445.20
Binde
60mm
L
B
Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 205.00 75.42
Lane With 1/S Shoulder 60+7.5 - 67.71
Lane Without Shoulder - 35.00 -
BCP
Lane With B/S Shoulder 60+7.50+7.50 1862.06 -
Lane With 1/S Shoulder 60+7.5 884.91 -
Lane Without Shoulder - 910.45 -
3897.42
Binder
60mm
Total
15461.10
67.71
-
-
-
15528.81
Wearing
50mm
L
B
Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 205.00 -
Lane With 1/S Shoulder 60+7.5 - -
Lane Without Shoulder - 35.00 -
BCP
Lane With B/S Shoulder 60+7.50+7.50 1862.06 60.00
Lane With 1/S Shoulder 60+7.5 884.91 60.00
Lane Without Shoulder 60 910.45 60.00
3897.42
Wearing
50mm
Total
-
-
111723.60
53094.60
54627.00
219445.20
Binder
40mm
L
B
Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 205.00 -
Lane With 1/S Shoulder 60+7.5 - -
Lane Without Shoulder - 35.00 -
BCP
Lane With B/S Shoulder 60+7.50+7.50 1862.06 15.38
Lane With 1/S Shoulder 60+7.5 884.91 7.69
Lane Without Shoulder 60 910.45 -
3897.42
Binder
40mm
Total
-
-
28638.48
6804.96
-
35443.44
Wearing
40mm
L
B
Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 205.00 75.00
Lane With 1/S Shoulder 60+7.5 - 67.50
Lane Without Shoulder - 35.00 -
BCP
Lane With B/S Shoulder 60+7.50+7.50 1862.06 15.00
Lane With 1/S Shoulder 60+7.5 884.91 7.50
Lane Without Shoulder 60 910.45 -
3897.42
Wearing
40mm
Total
15375
-
27930.9
6636.825
-
49942.73
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 8280.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-03 RD 4+355.51 to 4+647.6 2944.49
Lane 1 1 292.03 62.30 0.600 10916.08 Avg W
CEMENT CONCRETE PAVEMENT
RG-04 RD 4+647.60 to 4+680.06 4647.6
Lane 1 1 32.46 62.30 0.200 404.45 Avg W
RG-04 RD 4+680.06 to 4+847.6 4680.06
Lane 1 1 167.53 61.15 0.200 2048.89 Avg W
Total 128186.19
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Total 119308.32
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
Cement Treated Base Course
ItemCode:- 01A-4C Description:- Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 20145.60
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 3629.76
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Total 201452.40
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Total 17863.40
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Total 46705.33
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Total 201456.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Total 65604.08
Blast Pad Binder 40
Lane With B/S Shoulder = 2275 2275
Lane With 1/S Shoulder = 1507 1507
Lane Without Shoulder = 116 116
PQC
Lane With B/S Shoulder = 2275
Lane With 1/S Shoulder = 1507
Lane Without Shoulder = 116
Bituminos Pavement
Lane With B/S Shoulder = 2275
Lane With 1/S Shoulder = 1507
Lane Without Shoulder = 116
3,898 3,898
1290.00 100
60 60 60
4847.60 200
60 60 60
1270.3 80.3
1289.99 19.69
62.3 62.3 62.3
1413.43 123.43
1512.57 99.14
61.15 61.15 61.15
2158.88 646.31
62.3 62.3 62.3
2453.39 294.51
61.15 61.15 61.15
2808.03 354.64
2112.46 599.89
2363.91 251.45
62.3 62.3 62.3
2475.79 111.88
61.15 61.15 61.15
2832.61 356.82
62.3 62.3 62.3
2944.49 111.88
61.15 61.15 61.15
3236.52 292.03
62.3 62.3 62.3
4680.06 32.46
62.3 62.3 62.3
4847.59 167.53
61.15 61.15 61.15
1172.5 102.5
60.92 60.92 60.92
1190 17.5
60.46 60.46 60.46
1270.3 80.3
1289.99 19.69
8.38 8.38 8.38
1413.43 123.43
1512.57 99.14
2158.88 646.31
60.85 60.85 60.85
2453.39 294.51
60.425 60.425 60.425
2808.03 354.64
60.85 60.85 60.85
8.08 8.08 8.08
2923.59 115.56
60 60 60
3523.48 599.89
3774.93 251.45
3886.81 111.88
60.425 60.425 60.425
4243.63 356.82
60.85 60.85 60.85
4680.06 32.46
8.38 8.38 8.38
4847.59 167.53
7.94 7.94 7.94
4871.68 24.08
60.46 60.46 60.46
7.96 7.96 7.96
4967.59 95.91
60.92 60.92 60.92
8.42 8.42 8.42
4647.60 3357.6
60 60 60
1270.3 80.3
1289.99 19.69
60.5 60.5 60.5
4680.06 32.46
4967.6 120
60 60 60
1289.99 19.69
7.88 7.88 7.88
1413.43 123.43
7.88 7.88 7.88
1512.57 99.14
1413.43 123.43
1512.57 99.14
7.69 7.69 7.69
2158.88 646.31
7.88 7.88 7.88
2453.39 294.51
7.69 7.69 7.69
2808.03 354.64
7.88 7.88 7.88
3523.48 599.89
7.69 7.69 7.69
3774.93 251.45
7.88 7.88 7.88
3886.81 111.88
4243.63 356.82
1190 17.5
Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 198.41 -
Lane With 1/S Shoulder 60+7.5 41.58 -
Lane Without Shoulder - - -
CCP
Lane With B/S Shoulder 60+7.50+7.50 52.15 -
Lane With 1/S Shoulder 60+7.5 247.83 -
Lane Without Shoulder - - -
BCP
Lane With B/S Shoulder 60+7.50+7.50 2024.68 60.00
Lane With 1/S Shoulder 60+7.5 1217.30 60.00
Lane Without Shoulder 60 115.56 60.00
3897.51
Binder
75mm
Total
-
-
-
-
-
-
121480.80
73038.00
6933.60
201452.40
Binde
60mm
L
B
Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 198.41 75.42
Lane With 1/S Shoulder 60+7.5 41.58 67.71
Lane Without Shoulder - - -
CCP
Lane With B/S Shoulder 60+7.50+7.50 52.15 -
Lane With 1/S Shoulder 60+7.5 247.83 -
Lane Without Shoulder - - -
BCP
Lane With B/S Shoulder 60+7.50+7.50 2024.68 -
Lane With 1/S Shoulder 60+7.5 1217.30 -
Lane Without Shoulder 60 115.56 -
3897.51
Binder
60mm
Total
14964.08
2815.38
-
-
-
-
-
17779.46
Binder
40mm
L
B
Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 198.41 -
Lane With 1/S Shoulder 60+7.5 41.58 -
Lane Without Shoulder - - -
CCP
Lane With B/S Shoulder 60+7.50+7.50 52.15 15.38
Lane With 1/S Shoulder 60+7.5 247.83 7.69
Lane Without Shoulder - - -
BCP
Lane With B/S Shoulder 60+7.50+7.50 2024.68 15.38
Lane With 1/S Shoulder 60+7.5 1217.30 7.69
Lane Without Shoulder 60 115.56 -
3897.51
Binder
40mm
Total
-
-
802.07
1905.81
31139.58
9361.04
-
43208.50
Wearing
50mm
L
B
Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 198.41 -
Lane With 1/S Shoulder 60+7.5 41.58 -
Lane Without Shoulder - - -
CCP
Lane With B/S Shoulder 60+7.50+7.50 52.15 -
Lane With 1/S Shoulder 60+7.5 247.83 -
Lane Without Shoulder - - -
BCP
Lane With B/S Shoulder 60+7.50+7.50 2024.68 60.00
Lane With 1/S Shoulder 60+7.5 1217.30 60.00
Lane Without Shoulder 60 115.56 60.00
3897.51
Wearing
50mm
Total
-
-
-
-
121480.80
73038.00
6933.60
201452.40
Wearing
40mm
L
B
Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 198.41 75.00
Lane With 1/S Shoulder 60+7.5 41.58 67.50
Lane Without Shoulder - - -
CCP
Lane With B/S Shoulder 60+7.50+7.50 52.15 15.00
Lane With 1/S Shoulder 60+7.5 247.83 7.50
Lane Without Shoulder - - -
BCP
Lane With B/S Shoulder 60+7.50+7.50 2024.68 15.00
Lane With 1/S Shoulder 60+7.5 1217.30 7.50
Lane Without Shoulder 60 115.56 -
3897.51
Wearing
40mm
Total
14880.75
2806.65
782.25
1858.725
30370.2
9129.75
-
59828.33
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 63949.65
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+757.27 to 0+898.88
Lane 1 1 141.61 29.64 0.550 2308.53
RG-02 RD 0+898.88 to 0+1232.38
Lane 1 1 333.50 32.40 0.550 5942.97
RG-03 RD 0+1232.38 to 0+1620.5
Lane 1 1 388.21 50.47 0.550 10776.46
RG-04 RD 0+1620.50 to 0+1814.67
Lane 1 1 194.17 38.46 0.550 4107.28
RG-05 RD 0+1814.67 to 0+2280.50
Lane 1 1 465.91 36.45 0.550 9340.33
RG-06 RD 0+2280.50 to 0+2501.40
Lane 1 1 220.90 25.85 0.550 3140.65
RG-07 RD 0+2501.40 to 0+2970.17
Lane 1 1 468.77 34.34 0.550 8853.32
RG-08 RD 0+2970.17 to 0+3019.68
Lane 1 1 49.58 63.35 0.550 1727.49
RG-09 RD 0+3019.68 to 0+3219.95
Lane 1 1 200.35 41.02 0.550 4520.57
RG-10 RD 0+3219.95 to 0+3579.16
Lane 1 1 359.87 25.85 0.550 5116.45
RG-11 RD 0+3579.16 to 0+3615.91
Lane 1 1 36.75 25.03 0.550 505.92
RG-01 RD 0+000.00 to 0+3616
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 74127.14
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02A-Taxiways-Parallel Taxiways Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02A-3C Description:- Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 10000.58
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 100005.83
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 87727.30
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 100005.83
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 86782.71
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 5813.35
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
226
39
28.5
Total 6815.27
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 878.55
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 8785.52
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 8034.64
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks Rang
Total 8785.52
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 7946.16
0068.21 28.21
1381.43 48.97
0114.99 46.78
161.8 46.81
38.95 29.4 34.175
197.48 35.68
1849.57 51.84
254.5 28.5
1884.54 66.12
293.5 39
1327.764 47.07
0114.99 46.78
161.8 46.81
38.65 29.1 33.875
197.48 157.48
1767.96 11.23
1295.91 8.23
2911.52 15.31
254.5 28.5
1814.43 63.66
293.5 39
1201.97 12.04
8.845
0.15
0068.21 28.21
1295.91 45.94
0114.99 46.78
161.8 46.81
37.8 28.25 33.025
197.48 35.68
1295.91 36.32
254.5 28.5
1772.8 62.20
293.5 39
37 31.21 34.105
0068.21 28.21
1295.91 45.94
0114.99 46.78
37.8 28.25 33.025
161.8 46.81
197.48 35.68
1295.91 36.32
254.5 28.5
1772.8 62.20
293.5 39
37 31.21 34.105
0197.50 157.5
1295.91 8.23
2881.94 15.15
293.5 67.5
1295.91 19.20
1181.45 11.83
Range Rd L Avg W
0068.21 28.21
1295.91 45.94
0114.99 46.78
37.8 28.25 33.025
161.8 46.81
197.48 35.68
1295.91 36.32
254.5 28.5
1772.8 62.20
293.5 39
37 31.21 34.105
0197.50 157.5
1295.91 8.23
2856.64 15.02
293.5 67.5
1295.91 19.20
1152.02 11.54
28.5 8.75
39
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+021.00
Lane 1 1 21.00 165.89 0.550 1915.98
RG-02 RD 0+021.00 to 0+099.41
Lane 1 1 54.35 40.12 0.550 1199.29
RG-03 RD 0+099.41 to 0+154.76
Lane 1 1 55.35 27.30 0.550 831.08
RG-04 RD 0+154.76 to 0+233.19
Lane 1 1 78.43 33.65 0.550 1451.54
RG-05 RD 0+233.19 to 0+263.33
Lane 1 1 30.14 114.76 0.550 1902.30
RG-01 RD 0+026.00 to 0+051.21
Lane 1 1 25.21 67.69 0.600 1023.80
RG-02 RD 0+051.21 to 0+108.51
Lane 1 1 57.30 41.92 0.600 1441.35
RG-03 RD 0+108.51 to 0+167.51
Lane 1 1 59.00 42.20 0.600 1493.88
RG-04 RD 0+167.51 to 0+201
Lane 1 1 33.50 112.11 0.600 2253.49
RG-01 RD 0+0.000 to 0+014.77
Lane 1 1 14.77 60.36 0.600 534.94
RG-02 RD 0+0.14.77 to 0+073.82
Lane 1 1 59.05 43.37 0.600 1536.60
RG-03 RD 0+073.82 to 0+132.92
Lane 1 1 59.10 38.63 0.600 1369.64
RG-04 RD 0+0.132.92 to 0+154.30
Lane 1 1 21.37 50.64 0.600 649.31
RG-01 RD 0+204.00 to 0+224.73
Lane 1 1 20.73 49.78 0.600 619.19
RG-02 RD 0+0.224.73 to 0+283.78
Lane 1 1 59.05 38.63 0.600 1368.48
RG-03 RD 0+283.78 to 0+338.13
Lane 1 1 54.35 43.41 0.600 1415.60
RG-04 RD 0+0.338.13 to 0+358.77
Lane 1 1 20.64 66.71 0.600 826.09
Total 21832.54
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 25270.27
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+021.00
Lane 1 1 21.00 62.77 0.100 131.81
RG-02 RD 0+021.00 to 0+099.41
Lane 1 1 54.35 37.82 0.100 205.55
RG-03 RD 0+099.41 to 0+154.76
Lane 1 1 55.35 25.00 0.100 138.38
RG-04 RD 0+154.76 to 0+233.19
Lane 1 1 78.43 31.35 0.100 245.88
RG-05 RD 0+233.19 to 0+263.33
Lane 1 1 30.14 30.49 0.100 91.89
RG-01 RD 0+026.00 to 0+051.21
Lane 1 1 25.21 64.54 0.100 162.71
RG-02 RD 0+051.21 to 0+108.51
Lane 1 1 57.30 40.77 0.100 233.64
RG-03 RD 0+108.51 to 0+167.51
Lane 1 1 59.00 41.05 0.100 242.20
RG-04 RD 0+167.51 to 0+201
Lane 1 1 33.50 103.77 0.100 347.62
RG-01 RD 0+0.000 to 0+014.77
Lane 1 1 14.77 57.76 0.100 85.31
RG-02 RD 0+0.14.77 to 0+073.82
Lane 1 1 59.05 41.07 0.100 242.52
RG-03 RD 0+073.82 to 0+132.92
Lane 1 1 59.10 36.33 0.100 214.68
RG-04 RD 0+0.132.92 to 0+154.30
Lane 1 1 21.37 47.45 0.100 101.39
RG-01 RD 0+204.00 to 0+224.73
Lane 1 1 20.73 46.96 0.100 97.35
RG-02 RD 0+0.224.73 to 0+283.78
Lane 1 1 59.05 36.33 0.100 214.50
RG-03 RD 0+283.78 to 0+338.13
Lane 1 1 54.35 41.11 0.100 223.43
RG-04 RD 0+0.338.13 to 0+358.77
Lane 1 1 20.64 62.92 0.100 129.87
Total 3108.71
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+021.00
Lane 1 1 21.00 62.77 - 1318.11
RG-02 RD 0+021.00 to 0+099.41
Lane 1 1 54.35 37.82 - 2055.52
RG-03 RD 0+099.41 to 0+154.76
Lane 1 1 55.35 25.00 - 1383.75
RG-04 RD 0+154.76 to 0+233.19
Lane 1 1 78.43 31.35 - 2458.78
RG-05 RD 0+233.19 to 0+263.33
Lane 1 1 30.14 30.49 - 918.86
RG-01 RD 0+026.00 to 0+051.21
Lane 1 1 25.21 64.54 - 1627.14
RG-02 RD 0+051.21 to 0+108.51
Lane 1 1 57.30 40.77 - 2336.35
RG-03 RD 0+108.51 to 0+167.51
Lane 1 1 59.00 41.05 - 2421.95
RG-04 RD 0+167.51 to 0+201
Lane 1 1 33.50 103.77 - 3476.16
RG-01 RD 0+0.000 to 0+014.77
Lane 1 1 14.77 57.76 - 853.09
RG-02 RD 0+0.14.77 to 0+073.82
Lane 1 1 59.05 41.07 - 2425.18
RG-03 RD 0+073.82 to 0+132.92
Lane 1 1 59.10 36.33 - 2146.81
RG-03 RD 0+0.132.92 to 0+154.30
Lane 1 1 21.37 47.45 - 1013.90
RG-01 RD 0+204.00 to 0+224.73
Lane 1 1 20.73 46.96 - 973.52
RG-02 RD 0+0.224.73 to 0+283.78
Lane 1 1 59.05 36.33 - 2144.99
RG-03 RD 0+283.78 to 0+338.13
Lane 1 1 54.35 41.11 - 2234.33
RG-04 RD 0+0.338.13 to 0+358.77
Lane 1 1 20.64 62.92 - 1298.69
Total 31087.13
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 25915.06
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+021.00
Lane 1 1 21.00 62.77 - 1318.11
RG-02 RD 0+021.00 to 0+099.41
Lane 1 1 54.35 37.82 - 2055.52
RG-03 RD 0+099.41 to 0+154.76
Lane 1 1 55.35 25.00 - 1383.75
RG-04 RD 0+154.76 to 0+233.19
Lane 1 1 78.43 31.35 - 2458.78
RG-05 RD 0+233.19 to 0+263.33
Lane 1 1 30.14 30.49 - 918.86
RG-01 RD 0+026.00 to 0+051.21
Lane 1 1 25.21 64.54 - 1627.14
RG-02 RD 0+051.21 to 0+108.51
Lane 1 1 57.30 40.77 - 2336.35
RG-03 RD 0+108.51 to 0+167.51
Lane 1 1 59.00 41.05 - 2421.95
RG-04 RD 0+167.51 to 0+201
Lane 1 1 33.50 103.77 - 3476.16
RG-01 RD 0+0.000 to 0+014.77
Lane 1 1 14.77 57.76 - 853.09
RG-02 RD 0+0.14.77 to 0+073.82
Lane 1 1 59.05 41.07 - 2425.18
RG-03 RD 0+073.82 to 0+132.92
Lane 1 1 59.10 36.33 - 2146.81
RG-03 RD 0+0.132.92 to 0+154.30
Lane 1 1 21.37 47.45 - 1013.90
RG-01 RD 0+204.00 to 0+224.73
Lane 1 1 20.73 46.96 - 973.52
RG-02 RD 0+0.224.73 to 0+283.78
Lane 1 1 59.05 36.33 - 2144.99
RG-03 RD 0+283.78 to 0+338.13
Lane 1 1 54.35 41.11 - 2234.33
RG-04 RD 0+0.338.13 to 0+358.77
Lane 1 1 20.64 62.92 - 1298.69
Total 31087.13
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 25703.39
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 18267.85
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity
RG-01 RD 0+000.00 to 0+033.47 0000.00
Lane 1 1 33.47 106.93 0.550 1968.51 Area
RG-02 RD 0+033.47 to 0+167.14 0033.47
Lane 1 1 54.35 38.67 0.550 1155.79 Avg W
RG-03 RD 0+167.14 to 0+236.18 0167.14
Lane 1 1 69.04 38.65 0.550 1467.62 Avg W
RG-04 RD 0+236.18 to 0+269.95 0236.18
Lane 1 1 33.77 105.24 0.550 1954.66 Area
RG-01 RD 0+037.50to 0+201
L/side shoulder portion-1 1 1 135.37 12.94 0.200 350.33 area
portion-2 1 1 212.22 17.50 0.200 742.76
portion-3 1 1 118.96 12.94 0.200 307.88 area
R/side shoulder
portion-1 1 1 135.37 12.94 0.200 350.33 area
portion-2 1 1 212.22 17.50 0.200 742.76
portion-3 1 1 118.96 12.94 0.200 307.88 area
RG-01 RD 0+026.00 to 0+051.21 0026.00
Lane 1 1 25.21 65.62 0.550 909.85 Area
RG-02 RD 0+051.21 to 0+108.51 0051.21
Lane 1 1 57.30 41.62 0.550 1311.78 Avg W
RG-03 RD 0+108.51 to 0+167.51 0108.51
Lane 1 1 59.00 41.90 0.550 1359.66 Avg W
RG-04 RD 0+167.51 to 0+201 0167.51
Lane 1 1 33.50 106.57 0.550 1963.53 Area
RG-01 RD 0+026.00 to 0+201 0026.00
L/side shoulder 1 1 312.34 16.58 0.200 1035.92 Area
R/side shoulder 1 1 306.73 16.76 0.200 1028.31 Area
RG-01 RD 0+037.50 to 0+058.14 0037.50
Lane 1 1 20.64 64.32 0.550 730.14 Area
RG-02 RD 0+058.14 to 0+112.49 0058.14
Lane 1 1 54.35 41.96 0.550 1254.29 Avg W
RG-03 RD 0+112.49 to 0+173.98 0112.49
Lane 1 1 61.49 42.30 0.550 1430.68 Avg W
RG-04 RD 0+173.98 to 0+194.98 0173.98
Lane 1 1 21.00 64.88 0.550 749.36 Area
L/side shoulder portion-1 1 1 27.01 12.94 0.200 69.89 area
portion-2 1 1 120.40 17.50 0.200 421.40
portion-3 1 1 27.26 12.94 0.200 70.54 area
R/side shoulder portion-1 1 1 27.01 12.94 0.200 69.89 area
portion-2 1 1 120.40 17.50 0.200 421.40
portion-3 1 1 27.26 12.94 0.200 70.54 area
Total 22245.67
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 2888.44
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity
Total 28884.43
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity
R/side shoulder
Total 29887.16
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 28884.43
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity
R/side shoulder
Total 29794.30
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
###
Total 10826.07
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 12897.17
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 1727.72
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 17277.16
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 15877.52
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 17277.16
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 15784.66
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
###
Total 10826.07
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 12897.17
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 1727.72
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 17277.16
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 15877.52
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 17277.16
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 15784.66
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 7015.65
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
R/side shoulder
R/side shoulder
portion-1 1 1 142.50 17.50 0.200 498.75
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 16642.27
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 1093.37
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 10933.72
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
R/side shoulder
R/side shoulder
Total 11019.87
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 10933.72
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
R/side shoulder
R/side shoulder
Total 11019.87
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 18524.01
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
###
Total 6634.43
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 8518.25
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
###
Total 1029.48
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
###
Total 10294.76
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 13503.96
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
###
Total 10294.76
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 13503.96
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 6212.52
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
###
Total 7609.04
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 986.16
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 9861.60
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 10259.22
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 9861.60
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
###
###
Total 10166.36
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
###
Total 8206.14
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 9425.54
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 399.89
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 3998.93
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 11041.25
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 3998.93
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 11003.36
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 11699.52
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 12501.81
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 1159.37
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 11593.72
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 11609.64
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 11593.72
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 11609.64
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
###
Total 8206.14
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 9425.54
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 399.89
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 3998.93
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 11041.25
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 3998.93
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 11003.36
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000 to 0+245.00
Lane 1 1 245.00 90.00 0.400 8820.00
Total 8820.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000 to 0+245.00
Lane 1 1 353.84 13.35 0.600 2834.26
Lane 1 1 245.00 90.00 0.200 4410.00
Shoulder L/Side 1 1 245.00 10.00 0.600 1470.00
Shoulder R/Side 1 1 361.34 17.64 0.200 1274.81
RG-01 RD 0+000.00 to 0+515.00
Lane 1 1 51.00 296.24 0.600 9064.91
Total 19053.98
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000 to 0+245.00
Lane 1 1 353.84 12.78 0.550 2486.17
Shoulder L/Side 1 1 245.00 10.00 0.200 490.00
Shoulder R/Side 1 1 361.34 17.54 0.200 1268.53
RG-01 RD 0+000.00 to 0+515.00
Lane 1 1 51.00 296.24 0.550 8309.50
Total 13279.84
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000 to 0+245.00
Lane 1 1 353.84 12.50 0.100 442.30
RG-01 RD 0+000.00 to 0+515.00
Lane 1 1 51.00 296.24 0.100 1510.82
Total 1953.12
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000 to 0+245.00
Lane 1 1 245.00 90.00 0.200 4410.00
Total 4410.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Total 19538.27
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Total 2454.90
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Total 9958.85
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Total 19531.19
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Total 12401.62
0000.00 51 51
Area 15108.19 296.24
0000.00 51 51
Area 15108.19 296.24
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 1980.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 3C-Aprons-State Lounge Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 03C-4C Description:- Granular Sub-Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 22529.66
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 3C-Aprons-State Lounge Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 03C-5C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 13510.89
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 3C-Aprons-State Lounge Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 03C-6C Description:- Bituminious Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 2639.55
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 3C-Aprons-State Lounge Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 03C-7C Description:- Cement Treated Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 6187.50
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 26395.48
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 2750.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Total 10563.73
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 26395.48
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 10563.73
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks Rd L
Total 5936.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 3D-Aprons-Aircraft Maintenance Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 03D-4C Description:- Granular Sub-Base Course ###
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 14840.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 3D-Aprons-Aircraft Maintenance Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 03D-5C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 11130.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 3D-Aprons-Aircraft Maintenance Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 03D-5C Description:- Cement Treated Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
###
Total 11130.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 20780.44
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- Aprons-South East & North West Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 03A-4C Description:- Granular Sub-Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 485.64 13.65 0.600 3977.38
RG-01 RD 0+000.00 to 0+950
Lane 1 1 414.78 50.50 0.600 12567.98
RG-01 RD 0+000.00 to 0+950
Lane 1 1 447.67 8.00 0.600 2148.81
RG-01 RD 0+000.00 to 0+515.00
Total 49434.48
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- Aprons-South East & North West Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 03A-5C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 512.88 12.93 0.550 3645.93
RG-01 RD 0+000.00 to 0+950
Lane 1 1 414.78 50.50 0.550 11520.65
RG-01 RD 0+000.00 to 0+950
Lane 1 1 447.67 8.00 0.550 1969.74
RG-01 RD 0+0.00 to 0+950.00
Total 38478.06
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- Aprons-South East & North West Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 3A-6C Description:- Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 530.32 12.50 0.100 662.90
RG-01 RD 0+000.00 to 0+950
Lane 1 1 414.78 50.50 0.100 2094.66
RG-01 RD 0+000.00 to 0+950
Lane 1 1 447.67 8.00 0.100 358.14
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 413.40 12.50 0.100 516.75
RG-01 RD 0+000.00 to 0+950
Lane 1 1 407.10 50.50 0.100 2055.88
RG-01 RD 0+000.00 to 0+950
Lane 1 1 430.84 8.00 0.100 344.67
Total 6032.99
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- Aprons-South East & North West Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 03A-5C Description:- Cement Treated Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 10424.61
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-8C Description:- Bituminous Binder Course
a) 75mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 530.32 12.50 - 6628.97
RG-01 RD 0+000.00 to 0+950
Lane 1 1 414.78 50.50 - 20946.63
RG-01 RD 0+000.00 to 0+950
Lane 1 1 447.67 8.00 - 3581.35
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 413.40 12.50 - 5167.50
RG-01 RD 0+000.00 to 0+950
Lane 1 1 407.10 50.50 - 20558.77
RG-01 RD 0+000.00 to 0+950
Lane 1 1 430.84 8.00 - 3446.70
Total 60329.92
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-8C Description:- Bituminous Binder Course
a) 60mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 9373.06
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-8C Description:- Bituminous Binder Course
a) 40mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+950
R/side shoulder 1 1 335.98 17.52 - 5886.33
Total 12402.55
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-9C Description:- Bituminous wearing Course
a) 50mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 530.32 12.50 - 6628.97
RG-01 RD 0+000.00 to 0+950
Lane 1 1 414.78 50.50 - 20946.63
RG-01 RD 0+000.00 to 0+950
Lane 1 1 447.67 8.00 - 3581.35
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 413.40 12.50 - 5167.50
RG-01 RD 0+000.00 to 0+950
Lane 1 1 407.10 50.50 - 20558.77
RG-01 RD 0+000.00 to 0+950
Lane 1 1 430.84 8.00 - 3446.70
Total 60329.92
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-9C Description:- Bituminous wearing Course
a) 40mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+950
R/side shoulder 1 1 336.36 17.50 - 5886.33
Total 21768.17
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks Range
Total 27768.69
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 56564.57
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
6485.599
Total 42817.04
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 6754.64
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- Aprons-South East & North West Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 03A-5C Description:- Cement Treated Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
37.5
Total 12993.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
a) 75mm
No of No in Detail of Measurements
3987.52
Total 67546.43
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
a) 60mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
area
Total 10145.72
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
a) 40mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 13091.14
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
a) 50mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 67546.43
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
a) 40mm
No of No in Detail of Measurements
Total 23229.78
Range Rd L Avg W
24623.86 492.48
15108.581 503.62
25232.54 421.95
29.45675 29.45675
24623.872
8606.37 630.50
3987.52 498.44
25232.54 421.95
24623.86 492.48
15108.581 503.62
10145.72 507.29
6485.599 475.14
19755.72 391.20
3283.697 410.46
3987.52
6197.18
25232.536
8606.37 665.87
25427.52 503.52
3987.52 498.44
6886.88 393.54
10145.72 507.29
6197.18 354.12
6485.599 501.59
19755.72 391.20
3283.697 410.46
8606.37 688.51
25427.52 503.52
3987.52 498.44
6485.599 518.85
19755.72 391.20
3283.697 410.46
0.15
0.04
0.15
0.1
15108.581
24623.86 492.48
15108.581 503.62
25232.54 421.95
25427.52 503.52
3987.52 498.44
6485.599 518.85
19755.72 391.20
3283.697 410.46
0.15
0.04
0.15
0.1
10145.72 507.29
6197.18 354.12
24623.86
8606.376 688.51
25427.52 503.52
3987.52 498.44
6485.599 518.85
19755.72 391.20
3283.697 410.46
0.29
6886.88 393.54
10145.72 507.29
6197.18 354.12
10145.795
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 8536.13
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 7829.45
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 26346.07
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 32582.98
0.4
10.8
Range Rd L Avg W
878.911 904.911 26
Range Rd L Avg W
878.911 904.911 26
arks
Avg W 10 10 10
878.911 904.911 26
Avg W 10 10 10
Avg W 10 10 10
Avg W 10 10 10
Avg W 10 10 10
878.911 904.911 26
Avg W 10 10 10
Avg W 10 10 10
Avg W 10 10 10
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 13709.17
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 12780.98
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 42495.28
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 52663.56
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+060.00
Lane 1 1 60.00 11.35 0.300 204.38
RG-02 RD 0+060.00 to 0+470.639
Total 5127.33
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 05-Service Roads Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 05-2C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+060.00
Lane 1 1 60.00 10.96 0.250 164.36
RG-02 RD 0+060.00 to 0+470.639
Total 4059.52
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+060.00
Lane 1 1 60.00 10.78 - 646.57
RG-02 RD 0+060.00 to 0+470.639
Lane 1 1 410.64 10.00 - 4106.39
RG-03 RD 0+470.639 to 0+520.639
Lane 1 1 50.00 11.72 - 585.84
RG-04 RD 0+520.639 to 0+978.669
Total 15850.34
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+060.00
Lane 1 1 60.00 10.78 - 646.57
RG-02 RD 0+060.00 to 0+470.639
Total 15850.34
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 10457.56
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 5380.78
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 1685.93
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 16859.33
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 9708.42
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 16859.33
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
Total 9552.96