I.L.=20*6*0.25/2=15kN/m
Column dead load:
Roof =15kN
Col S.W.=40*9.81*6/1000 =2.4kN
Girts=3*7*9.81*6/1000 =1.2kN
Side Cladding=6*6*7*9.81/1000=2.5kN
∑ D.L. =21.1kN
Case1 =1.2D.L.+1.6I.L.=1.2*21.1+1.6*15=49.32kN Pnominal= 0.005*44.1=0.25kN
49.3
0.25
1.5kNm
Consider Wind @90o
Wind col load = 1*0.773*6*6=27.83kN Roof load = 0.85*0.773*10.15*6=40kN
39.4kN 39.4kN
6.9kN 10.4kN
6.9kN
27.8kN 27.8kN 27.8kN 27.8kN
. .
.
∆ ∆ ⇒ ∆ ∆ ⇒ ⇒ 10.4
0.9D.L.+1.3W.L =0.9*21.1‐1.3*39.4=‐32.2kN
Mt=1.3*(27.8*3‐10.4*6)=27.3kNm Tension and Bending
C:\Users\vawda\Documents\steel 4\industrial\truss bldg\Tut Column loading for 20m truss Ex1.docx
W.L 39.4kN
D.L. 21.1kN
Prop 10.4kN
W.L 27.8kN
Consider 00 wind as critical because it combines Dead and Wind acting downwards simultaneously:
3.3kN
WW roof=0.773*0.4*6*10.15=18.8kN 18.5kN
LW roof =0kN
28.3kN 1.03kN
WW Col=0.773*1.018*6*6=28.3kN
. .
∆ ∆ ⇒ 5.1 28.3kN 1.03kN
Column load and Moments:
Or 5.5kN/m