Tutorial Column loading for 20m truss (ref Example1)


For truss assume 0.25kN/m2 dead load on plan:  D.L.=20*6*0.25/2=15kN/m 

            I.L.=20*6*0.25/2=15kN/m 

Column dead load: 

  Roof        =15kN 

  Col S.W.=40*9.81*6/1000  =2.4kN 

  Girts=3*7*9.81*6/1000   =1.2kN 

  Side Cladding=6*6*7*9.81/1000=2.5kN 

        ∑ D.L.  =21.1kN 

Case1 =1.2D.L.+1.6I.L.=1.2*21.1+1.6*15=49.32kN   Pnominal= 0.005*44.1=0.25kN 

49.3

0.25

1.5kNm

   

Consider Wind @90o 

Wind col load = 1*0.773*6*6=27.83kN  Roof load = 0.85*0.773*10.15*6=40kN 

39.4kN 39.4kN
6.9kN  10.4kN
6.9kN
27.8kN 27.8kN 27.8kN 27.8kN

 
. .
.
∆ ∆ ⇒ ∆ ∆ ⇒ ⇒ 10.4   

0.9D.L.+1.3W.L =0.9*21.1‐1.3*39.4=‐32.2kN 

Mt=1.3*(27.8*3‐10.4*6)=27.3kNm  Tension and Bending 

C:\Users\vawda\Documents\steel 4\industrial\truss bldg\Tut Column loading for 20m truss Ex1.docx 

 
 

W.L 39.4kN 
D.L. 21.1kN
Prop 10.4kN

W.L 27.8kN

Consider 00 wind as critical because it combines Dead and Wind acting downwards simultaneously: 

3.3kN
 WW roof=0.773*0.4*6*10.15=18.8kN  18.5kN

LW roof =0kN 
28.3kN 1.03kN
WW Col=0.773*1.018*6*6=28.3kN 

LW  Col=0.773*0.037*6*6=1.03kN     1.65kN 1.65kN


 
13.7kN 4.8kN
Truss reactions: 

Prop Force:    5.1kN 5.1kN

. .
∆ ∆ ⇒ 5.1   28.3kN 1.03kN

  

Column load and Moments: 

1.2D.L+1.3W.L   W.L 13.7kN

N=1.2*21.1+1.3*13.7=43.1   1.65kN D.L. 21.1kN


5.1 kN
Mt=1.3*(28.3*6/2‐3.45*6)=83.5 
W.L 28.3kN

Or 5.5kN/m

C:\Users\vawda\Documents\steel 4\industrial\truss bldg\Tut Column loading for 20m truss Ex1.docx 