This document outlines 8 tasks for a project with the name MOV. It includes the task name, duration, start and finish dates for each task. The tasks include brainstorming, collecting data, documentation, building the project, testing, verification, and presenting. The project is scheduled to run from March 21st to April 9th 2019 with various team members assigned to each task.
This document outlines 8 tasks for a project with the name MOV. It includes the task name, duration, start and finish dates for each task. The tasks include brainstorming, collecting data, documentation, building the project, testing, verification, and presenting. The project is scheduled to run from March 21st to April 9th 2019 with various team members assigned to each task.
This document outlines 8 tasks for a project with the name MOV. It includes the task name, duration, start and finish dates for each task. The tasks include brainstorming, collecting data, documentation, building the project, testing, verification, and presenting. The project is scheduled to run from March 21st to April 9th 2019 with various team members assigned to each task.
ID Task Task Name Duration Start Finish 17 Mar '19 24 Mar '19 31 Mar '19 07 Apr '19 14 Apr
24 Mar '19 31 Mar '19 07 Apr '19 14 Apr '19
Mode W T F S S M T W T F S S M T W T F S S M T W T F S S M T W 1 2 Brainstorming Project 2 days Thu Fri 22/03/19 Project Manager Execution Plan 21/03/19
3 Collect Data insiden 2 days Mon Tue Incident Data[1]
dan solusinya 25/03/19 26/03/19 4 Dokumentasi Pre 2 days Wed Thu Project Manager Requisite 27/03/19 28/03/19 5 Build Project 3 days Fri 29/03/19 Tue 02/04/19 Programmer;RPA UiPath[1] 6 Testing 1 day Wed 03/04/19Wed 03/04/19 Tester 7 Verification and 3 days Thu Mon Project Manager;Tester Prepare for 04/04/19 08/04/19 Presentation 8 Presentasi 1 day Tue 09/04/19 Tue 09/04/19 Project Manager