Brigada Eskwela Physical Facilities Repair and Maintenance Needs Assessment Form

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 15

Appendix B

BE Form 01

Republic of the Philippines


Department of Education
Region VIII
Division of Leyte
(name of school)
School Year 2015-2016

BRIGADA ESKWELA
PHYSICAL FACILITIES REPAIR AND MAINTENANCE NEEDS ASSESSMENT FORM
(To be accomplished by the School Physical Facilities Coordinator)

Instruction: Conduct an ocular inspection of the school facilities listed below. Then provide the needed information to facilitate the improvement to be done on those
identified facilities. (If needed, you may use separate forms for each classroom or physical facility).
AREA/BUILDING:__________________
Condition Material Resources
FACILITIES Remarks Manpower Needed
(check one) Nature of Improvement Needed Needed
(indicate quantity and
Satisfactory Unsatisfactory If unsatisfactory, describe the (e.g. repair, repainting, (indicate kind and nature of labor
problem replacement, etc.) quantity) services needed)

Prepared by: Noted by:

______________________________________ ________________________ ________________________________


School Physical Facilities Coordinator Date Prepared School Principal
Property Custodian
Appendix C
BE Form 02
Republic of the Philippines
Department of Education
Region VIII
Division of Leyte
(name of school)
School Year: 2015-2016

BRIGADA ESKWELA
SCHOOL WORK PLAN
(To be accomplished by the School Head)

Instruction: List down all the specific activities that you will be undertaking in relation to the conduct of Brigada Eskwela in your school and fill in the required inform
Add another sheet if needed. Once complied submit a copy to the Adopt-A-School-Program coordinator or Brigada Eskwela coordinator of your division.

KRA Activities Timeline Person/s Responsible Materials Needed


1. Advocacy and Marketing

2. Resource Mobilization

3. Implementation

4.Monitoring and Evaluation

5. Reporting

Prepared by: Noted by:


______________________________________ ________________________ ______________________
School Physical Facilities Coordinator Date Prepared School Principal
Republic of the Philippines
Department of Education
Region VIII
Division of Leyte
(name of school)
School Year: 2015-2016

BRIGADA ESKWELA
SCHOOL WORK PLAN
(To be accomplished by the School Head)

e undertaking in relation to the conduct of Brigada Eskwela in your school and fill in the required information.
to the Adopt-A-School-Program coordinator or Brigada Eskwela coordinator of your division.

Budget
_______________________
School Principal
Appendix D
BE Form 03
Republic of the Philippines
Department of Education
Region VIII
Division of Leyte
(name of school)
School Year: 2015-2016

BRIGADA ESKWELA
RESOURCE MOBILIZATION FORM
(To be accomplished by THE Resource Mobilization Committee)

Instruction: Using the completed BE Form 01: Physical Facilities Needs Assessment Form as basis, summarize the resources (materials and manpower) needed and
list down the potential source or partners to be tapped. Add additional sheet if needed. The status and remarks columns should be updated regularly to determine
progress in acquiring resources needed.

Key
Materials Needed Quantity Persons/Organizations to Strategies/Plan of Action Person/s Responsible Status Remarks
be Tapped

Prepared by: Noted by:

_________________________________________ ________________________ _____________________________


Resource Mobilization Committee chairperson Date Prepared
_____________________________
Appendix E
BE Form 04
Republic of the Philippines
Department of Education
Region VIII
Division of Leyte
(name of school)
School Year: 2015-2016

BRIGADA ESKWELA
DAILY ATTENDANCE OF VOLUNTEERS
Date: _______________

Instruction: Volunteers themselves should personally fill in the details required by this form under the supervision of any of the committee members. *For
the last column, indicate if masonry, carpentry, plumbing, painting, electrical, gardening, landscaping, ordinary labor or others.

TIME TOTAL NUMBER NATURE OF


POSITION/DESIGNATION ADDRESS/ORGANIZAT CONTACT
NAME ION/AFFLIATION NUMBERS SIGNATURE OF HOURS VOLUNTEER SERVICES
SERVED RENDERED
IN OUT

Noted:

______________________________ ________________________
School Principal Date
Appendix F
BE Form 05
Republic of the Philippines
Department of Education
Region VIII
Division of Leyte
INOPACAN NATIONAL HIGH SCHOOL
School Year: 2019-2020

BRIGADA ESKWELA
RECORD OF DONATION RECEIVED
(To be accomplished by the Documentation Committee)

ITEMS OR MATERIALS QUANTITY DATE RECEIVED NAME OF DONOR ASSUMED COST OF ITEMS

PER UNIT TOTAL

Prepared by: Noted by:

______________________________________ __________________ ________________________________


Documentation Committee Chairperson Date Prepared School Principal
Appendix G
BE Form 06
Republic of the Philippines
Department of Education
Region VIII
Division of Leyte
(name of school)
School Year: 2015-2016

BRIGADA ESKWELA
DAILY ACCOMPLISHMENT REPORT
Date: ____________________
(To be accomplished by the Program Implementing Committee)

Instruction: List down all the activities that needs to be undertaken for each day of the Brigada Eskwela Week. At the end of each day, please mark the appropriate
column that corresponds to the status of each activity. Cite reasons for non-completion.
AREA/BUILDING: __________________________

STATUS
ACTIVITIES REMARKS/RECOMMENDATIONS
Completed Started but not yet completed Not done

Prepared by: Noted by:

___________________________________________ __________________ ________________________________


Program implementation Committee - Chairman Date Prepared School Principal
BE Form 07
DEPARTMENT OF EDUCATION

BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(To be accomplished by the School Head)

DIVISION: Leyte REGION: VIII


SCHOOL: SCHOOL ID:
SCHOOL ADDRESS:
(Please check appropriate box)
Level: Type of School
Elementary Central School
Secondary Non-central School
Multi-grade
Primary School/Incomplete
Integrated School
SCHOOL HEAD: CONTACT NUMBER:

GPTA PRESIDENT: CONTACT NUMBER:

A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
What was done?
Repaired Repainted Replaced Others(brief discription)

B. DONATIONS/MATERIAL RESOURCES GENERATED (use separate sheet if needed)


Type of Donations Source Estimated Cost (Php)

TOTALS

C. VOLUNTEER SERVICES
Name of Number of Volunteer
Type of Volunteer Individuals/Organizatio
n (Use separate sheets Day 1 Day 2 Day 3 Day 4 Day 5 Total
if needed)

TOTALS
D. ESTIMATED COST OF VOLUNTEER SERVICES
(Use separate sheets if needed)
Total Number of Total Number of Hours Total Estimated Cost
Type of service Volunteers Rendered

TOTALS

E. SIGNIFICANT EVENTS/EXPERIENCES (Use separate sheets if needed)


What is/are its important
contribution to the operation
What happened? Who were involved? When? of the school or to the
existing needs of the school?

ISSUES AND CONCERNS (Describe briefly problems encountered and resolved)


ISSUES AND CONCERNS HOW WAS IT RESOLVED?

LESSONS LEARNED/BEST PRACTICES

F. SUGGESTIONS TO STRENGTHEN BRIGADA ESKWELA PROJECT (include support need from Central, Region, and
Division Office that can increase the impact of Brigada Eskwela Project in your school.

G. EVIDENCES/ATTACHMENTS
1. Photos before, during and after the Brigada eskwela
2. Copies of al completed BE forms (check if attached)
__________ Form 1 __________ Form 5
__________ Form 2 __________ Form 6
__________ Form 3 __________ Form 7
__________ Form 4
3. Copies of deed of donation
4. Copies of acceptance
5. Copies of Deed of Undertaking
6. Others: Notice of award
Notice to proceed
Prepared by: Date:
Submit copy of this form to ADOPT-A-SCHOOL PROGRAM District Coordinator or District Supervisor.