CV Angel Georgiev EU English

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 19

CURRICULUM VITAE

ANGEL GEORGIEV
44y.o.
Bulgarian

Telephone: +359 888 345943


E-mail: angel.georgiev@gmail.com
Marital status: Married, 3 kids

Objective:
I am Certified SAP Solution Consultant with team-lead and architecture experience willing to obtain a consulting
manager or architecture position and continue his work as SAP PM/CS/PS/IS-A&D/DMS/MRO/MRS/SD/MM/S4/HANA
applications in a dynamic organization or a challenging project. I would like to participate in projects on the organization
of change with SAP ERP's implementation, strategic component for company competitiveness in today business world.
I have the capacity to deal with complex projects, to achieve them in good term within a short delay. I am interested in
learning new functionalities.

Profile:
Angel R. Georgiev is SAP R3 Senior Certified PLM (EAM Solution package), Functional consultant in modules: Plant
Maintenance (PM), Customer Service/Service Management (CS/SM), Multi-Resource Scheduling (MRS), Material
Management(MM), Industry Solution Aerospace and Defense (IS-A&D MRO/iMRO), Project systems/management (PS)
with strong background like ABAP Developer and Technical Consultant.

Senior level of Cross application PLM components:


Document Management System (DMS), Classification System configuration, Engineering Change Management (ECM),
Integrated Product and Process Engineering (IPPE), Product/Variant Configuration (VC), BOM (Bill of Material).

Summary - SAP experience:


- 22 years SAP projects participation
- 13 years of experience as a Functional Consultant and Architecture/Design experience with modules:
- PM – 11 years, CS – 8 years, MRS – 6 years, PLM(DMS/VC/ECM/Classification/BOM/eBOM) – 4 years, PS
– 2 years, IS-A&D MRO – 3 years, SD – 4 years, MM – 4 years, QM –2 years, PP – 1 year, S4/HANA – 1
year
- S4/HANA – initial design and transformation – 1 year
- 4 years of experience as an ABAP Developer/ SAP Technical Consultant - ABAP/4 and ABAP OO
- 5 years of experience in project management and team leading
- Total: 28 SAP projects, 14 Full life cycle projects, many rollouts
- Specific countries experience in EU: UK, Belgium, Luxemburg, Germany, Austria, Switzerland, Italy, Hungary,
Serbia, Albania, Greece, Baltic republics, Bulgaria

Summary - IT experience:
- 28 years
Participation in SAP Projects:

Customer: GSK, Brussels area


Duration: June 2018 – October 2019

Sector: Pharma / Pharmaceutical

Project description: GSK Vaccines Pharmaceutical SAP implementation

Project role: SAP Solution Architect / Designer / Senior Consultant


Responsibility:
- Functional and Business solution design and consulting
- Roadmap
- Risk management
- Project management & Team leading

Technical skills:
- Main: SAP PM, SAP PLM – BOM / ECM, SAP QM
Responsibilities: - Additional: SAP MM, SAP SD, Adobe forms

Projects:
- Various projects

Soft skills:
- Conflict management
- Leadership
- Cross culture sensitivity

Sector: Military/Defence

Duration: October 2018 – November 2019 – part time

Project description: Transformation from ECC to S/4 HANA

Project role: SAP Solution Architect and Project Manager


Responsibility:
- Business process solution design
- Redesign of the current custom processes and Z development
- Proof of Concept design and implementation
- Roadmap of the implementation to HANA and S/4 HANA
- Risk management
- Detailed planning
- Budgeting
- Resource management
Responsibilities:
Technical skills:
- Transformation design and POC for SAP HANA, SAP S/4 HANA, SAP Cloud Platform, SAP Cloud Cockpit, SAP
Leonardo
-
- Projects:
- Classified
Soft skills:
- Conflict management
- Leadership
- Cross culture sensitivity

Customer: NATO, Luxemburg


Duration: June 2017 – May 2018
Sector: Military / Defense / Government

Project description: Classified

Project role: SAP Solution Architect


Responsibility:
- Excellent conceptual knowledge, ability to produce feasibility studies, to advice management with high
level solution designs and descriptions
- Excellent knowledge of the SAP Business Area business processes
- Excellent hands-on knowledge of the SAP Business Area customization features
- Excellent functional and technical specification writing skills in the SAP Business Area
- Excellent experience in dealing with business representatives
- Functional and Business solution design and consulting
- Solution design
- Roadmap
- Budgeting
- Risk management
- Project management
- Others – Classified
Responsibilities:
Technical skills:
- SAP EAM (CS, PM, PS), SCM (MM, SD, WM, LE) and PLM (DMS, ECM, VCM, Configuration
management), DIMP, VIM, Fund management
- HANA platform – S4/HANA initial design
- Others - Classified
Projects:
- Various projects
- Classified

Soft skills:
- Conflict management
- Leadership
- Cross culture sensitivity

Customer: Coca-Cola HBC AG


Duration: November 2016 – November 2018

Sector: Beverage/Food/Alcohol FMCG industry

Project description: SAP P2P MM SCM Logistics Consultant

Project role: SAP Functional Consultant


Responsibility:
- Functional and Business solution design and consulting
- Configuration (Services, Vendor Consignment, Pricing, Outputs, Subcontracting, PR/PO/GR
processes)
- Writing Functional Specifications
- Writing Technical Specifications/ WRICEFs / ABAP debugging
- Training trainers
- Integration with PM,CS, PS, QM, FI, CO, PP, WM, APO, CRM
- SRM support – internal and external catalogues
Responsibilities: - HANA S4 initial design and analyses
Projects:
- Cloud IaaS Taulia - Supplier portal implementation, Cloud Amazon Web Services(AWS)
- Pitas Greece – food industry (cheese and yogurt) implementation
- P2P and Inventory Management - Rollout in Nigeria, Wave 2
- BSO SLA calculation - design

Technical skills:

Purchasing management:
Purchasing Requisition, Purchasing Order, GR/GI, and Invoice verification processes

Inventory management:
SAP Inbound Deliveries
SAP Outbound Deliveries
Batch Management
Serial Number Processing
Split Valuation
Quality Inspection Process at GR
Inter-Plant Inventory Processing Inter-company Inventory Processing

Soft skills:
- Conflict management
- Leadership
- Cross culture sensitivity
- Working with onsite team and offshore teams
- CHARM/Service now/HPQC

Customer: SAP Consult, Bulgaria


Duration: April 2016 – December 2016

Sector: Business consulting

Project description: SAP SD, CS, VC and ABAP Solution designer

Project role: SAP Solution Designer/Senior Functional Consultant


Responsibility:
- Roadmap and High-Level Solution design with SD/CS/VC and ABAP modules
- Writing Blueprint documentation
- Writing Functional Specifications
- Writing Technical Specifications/ WRICEF list
- Training key users
Skills:
Technical:
Responsibilities:
- Warranty management – Warranty claim workbench
- Preventive maintenance
- Corrective maintenance
- Contract management
- Sales and delivery
- Enhancements/BADI/ User exits
- Variant configuration
- TOGAF methodology

Customer: Kohler Mira, Gloucester UK


Duration: December 2015 – March 2016

Sector: Manufacturing / Retail

Project description: SAP PLM MRS to CRM implementation Phase II


SAP Multi Resource Scheduling Senior with overall architecture, processes, and functionality and technical
Project role: components. Strong integration with CRM, HR, Google APIs and Syclo (mobile).
Responsibility:
- Managing the solution design
- Business process review with the planning team
- Provide business process improvements if required to ensure the planning team is using the tool in the
best way
- TOGAF methodology
- Functional configuration audit
- Technical development audit
Responsibilities: - Technical specification creation for all MRS and CRM developments
- Recommendations for, and benefits of, an MRS to CRM upgrade
- Strong integration with CRM, HR, MM, Google APIs and Syclo (mobile).
- Support the Business with day to day process questions/issues

Soft skill
- Conflict management
- Leadership
- Cross culture sensitivity

Customer: SKF Sverige AB, Gothenburg Sweden


Duration: August 2015 – December 2015

Sector: Manufacturing

Project description: UNITE project, phases R0.3 and R1.0


SAP Multi Resource Scheduling (PLM MRS 10.00) and CS/PM integration subject matter Lead expert with
Project role: overall architecture, processes, functionality and technical components.
Responsibility:
- SAP MRS 10 Solution architecture/design of Prototype (Proof of Concept)
- Roadmap High-Level design
- PM/CS integration design
- Detailed / Configuration design - Blueprint documentation
- Directly interact with the client as MRS Lead. Reporting to Customer/Program manager for the track.
- Responsible for MRS 10 implementation and design Lead the onsite team
- Support/guide the team to meet the track deliverables
- Carry out AS-IS Fit Gap, To-Be study
- TOGAF methodology
- Conduct blueprinting workshops.
- For Custom developments – conceptualize; write a Functional Specification and Review technical
specification.
- Resolve the issue/escalation of issues in meetings, forums to constructively figure out
solution/alternatives.
- Manage the implementation, resources, and communication with stakeholders
- Co-ordination with other track/application team for solution integration
Responsibilities:
- HCM Time Management functional consultant
- S4/HANA initial design and analyses
- C4C(Cloud for Customer) integration

Skill:
Technical:
- Initial MRS 10 installation and landscape design
- SAP Solution design in areas SAP MRS 10 and PM/CS integrated with PS, C4C, HCM and MM
- PM/CS Work Centre (Std Value Key, Control Key, Capacity, Scheduling and Work Centre Formulas)
- PM/CS Task lists (Group Counters, Sequences, PRT and Control Key)
- PM/CS Service orders, Equipment, Notifications and Maintenance plans/ Preventive maintenance
configuration and design
- Tools management. ETM. Creation of tool catalogs BOMs. Tools planning and scheduling. Rental of
tools. Assignments between human resources and tool resources. Links between tools and assets.
- Developing functional specifications associated with system enhancements (RICEF).
- Good understanding of SAP implementation project Processes (ASAP methodology, phase
deliverables, activities)
- Good working skill on Microsoft Office ( visio, Word, Excel, presentation)
Soft skill
- Conflict management
- Leadership
- Cross culture sensitivity

Full life cycle

Customer: Cambridge Assessment, Cambridge UK


Duration: November 2014 – May 2015

Sector: Education

Project Description: ASP project phase: 2.2. ASP Threshold, Commissioning


SAP Multi Resource Scheduling (PLM MRS 9.00) and strong PM/CS/SD integration subject matter Lead expert
Project role: with overall architecture, processes, functionality and technical components
Responsibility:
- SAP MRS 9.00 Solution architecture/design of prototypes
- High-Level design
- SAP Solution design in areas SAP MRS 9.00 integrated with PM/CS, HCM, and MM
- Detailed / Configuration design - Blueprint documentation
- Directly interact with the client as Lead. Reporting to Customer/PMO for the track.
- Responsible for MRS 9.00 implementation and design Lead the offshore and onsite team
- Support/guide the team to meet the track deliverables
- Carry out AS-IS Fit Gap, To-Be study.
- TOGAF methodology
- Conduct blueprinting workshops.
- For Custom developments – conceptualize, write a Functional Specification and Review technical
specification.
- Resolve the issue/escalation of issues in meetings, forums to constructively figure out
solution/alternatives.
Responsibilities:
- Co-ordination with other track/application team for solution integration

Skill:
Technical:
- MRS 9.0 functional and technical implementation
- PM/CS and SD integration design and service elements processing(Quotations, Contracts & Orders,
Deliveries, End to end Service Management, Contracts & Processing, Spare parts management, Field
Services and in-house Repair), BOMs, Routings(general task lists)
- Good understanding of SAP implementation project Processes (ASAP methodology, phase
deliverables, activities)
- Good working skill on Microsoft Office ( visio, Word, excel, presentation)
Soft skill
- Conflict management
- Leadership
- Cross culture sensitivity
- Working with Cognizant onsite team and offshore in India

Customer: SAP Consult, Bulgaria/Greece


Duration: June 2014 – December 2014

Sector: Retail and Transportation industry

Project description: PLM - PM/CS/SD/MM/PS and MRS 8.00 implementation, ECC 6.0

Project role: SAP Project Manager / Solution Architect


Responsibility:
- Project management for Phase 1 – Blueprinting
- Solution architecture/design of prototypes
- Coaching workshops
- Setup roadmap with functional team
- Blueprint documentation revision
- Project management
Responsibilities:
Skill:
Technical:
- SAP Solution design and management in areas SAP CS, SD, MM, PM, PS, PLM and MRS 8.00.
- Strong integration with HCM / HR and FI/CO
Soft skill
- Conflict management
- Leadership
- Cross culture sensitivity

Customer: Atlas Copco Airpower, Antwerp, Belgium


Duration: November 2011 – March 2014

Sector: Compressors and Generators, Mining and Construction Equipment, Industrial tools
!ACT project and SEED and CT-AM templates;
Project Description: Service to closeandOrder to cash teams/ Aftermarket international implementation ( pilot implementations in
Germany, Belgium, Netherlands, Switzerland, and Austria)
Main role SAP CS Lead Consultant - !ACT project Phase 1 and 2, ECC 6.0
Project role: Additional roles : VC(variant configuration)/ SD/ MRS
Responsibility:
- SAP CS and SD Solution architecture/design of prototypes for Service processing, DIP profile
implementation, Preventive service and Contract management
- Quotations, Contracts & Orders, Deliveries, End to end Service Management, Contracts & Processing,
Spare parts management, Field Services and in-house Repair
- Setup roadmap with functional team
- Blueprint documentation revision
- Directly interact with client as Lead. Reporting to Customer/PMO for the track.
- Lead the offshore and onsite team. Managing small or micro projects with teams up to 5 people –
offshore or/and developers
- Support/guide the team to meet the track deliverables
- Carry out AS-IS Fit Gap, To-Be study.
- TOGAF methodology
- Conduct blueprinting workshops.
- For Custom developments – conceptualize, write a Functional specification, and Review technical
specification.
- Training Trainers/ Key-users
- Resolve the issue/escalation of issues in meetings, forums to constructively figure out
solution/alternatives.
- Co-ordination with other track/application team for solution integration
- On time and successful delivery of all milestones for the track.
- Configuration design

Skill:
Responsibilities: Technical:
- SAP Solution design in areas SAP EAM/PLM CS, PM, VC, SD, and MRS.
- CS Warranty management
- Strong SD, MM, Mobile and CRM integration
- Initial Blueprint design and integration for ECC MRS 8.0 to CRM, HR and Plant Maintenance with
exposure to Work Center Scheduling and Enhancements, Optimization, Automatic Planning, Parts
Availability Check, Planning Board and Enhancements, Employee Qualification and Integration with
Human Capital Management (PLM360)
- Configuration management solution: Variant configuration solution between contract’s service material
and maintenance plans per contract line item and Classification
- Routings(general task list) implementation including variant configuration
- PLM PSB/ PDM– Product structure browser
- Tools management - ETM. Warehouse management and delivery of tools. Rental of tools.
Assignments between human resources and tool resources. Links between tools and assets.
- KMAT, Class 300, Configuration profiles
- Good understanding of SAP implementation project Processes (ASAP methodology, phase
deliverables, activities)
- Solution Manager integration
- Good working skill on Microsoft Office ( vision, word, excel, presentation)
Soft skill
- Conflict management
- Leadership
- Cross culture sensitivity
- Working with offshore teams in India and Poland

Full life cycle

Customer: SAP / Steep Anwendungssysteme, Hungary/Germany


Duration: May 2011 – November 2011

Sector: Electronics / Power and Solar

Project Description: PS and PLM ( ECM, DMS / Easy DMS, Classification) design, prototype and realization, ECC 6.0

Project role: SAP PLM and PS Analyst, Munich / Budapest

Responsibilities: Solution design of prototypes and customizing. Blueprint documentation and presentation to the Client.
Customer: Centrica (BritishGas), London, UK
Duration: October 2009 – May 2011

Sector: Utilities IS-U

Project Description: SMART Metering Project Staines, London(BGSM)- Phase 1, 2 and 3

Project role: SAP MRS Analyst (Team Lead during Go Live phase) - SMART Metering, Utilities, London, ECC 6.0
A prototype implementation of SAP MRS (Multi Resource Scheduling) module Versions 6.10, 7.00 and 8.0.
Key MRS skills: VSR Optimizer, Capacity pots implementation, BW,‘Break’solution, Qualifications. Integration
with external systems.
Integration with: SAP HR, PM/CS, MAU, IS-U Metering
AGAIL SCRUM methodology.

Additional non-technical responsibilities:

 Responsible for the communication with SAP AG regarding Design gaps, solution proposal review
OSS notes and problem-solving during implementation
 CS solution design and implementation in Utility sector
 Strong integration with IS-U Metering processes: Metering, Supplier switch, Settlement,), Energy Data
Management
 Drive the IS strategy forward, deal with different business units to agree on requirements and build a
development plan
Responsibilities:  Team management during Go-Live phase to deliver work to agreed estimates and timescales using
Application Design and Development processes, templates and tools, and to support their
improvement
 Liaise with Application/Development Manager, Project Managers, Analysts, Business, and Users,
playing an active role in delivering the business benefits of change
 Requirements validation to eliminate ambiguity and agree on a program of work packages that can be
delivered through an agile methodology
 Tools management processes related to Resources assignments. Tools planning and scheduling on
resource’s van stock. Tools warranty management.
 Carry out impact analysis of change requests
 Estimate effort and elapsed time for required design and development.
 Solution Manager integration
 Carry out post project reviews of development and make recommendations for process improvements

Full life cycle

Customer: General Electric Aviation Caledonian, Prestwick/Scotland UK


Duration: July 2009 – December 2009

Sector: Aerospace Industry IS Aerospace & Defense

Project Description: SAP MRO Implementation Engines, OASIS project( micro, version 3, ERP 6 , EhP 3 ), ECC 6.0

Project role: IS-A&D MRO OBC Lead Functional Consultant Axon


Business aspects:

 Understanding of AS-IS Process of the customer


 Setup roadmap with functional team and architecture/design activities
 Understanding of Global Business Blueprint of the customer
 Finding gaps in AS-IS Process of the customer SAP processes
 Understanding of Customizations in global SAP processes of the customer
 Making local customizations as necessary
 Elaboration of a migration plan with customers global SAP management
 Data preparation for migration
 Carry out Go Live
Responsibilities:  Answer queries from users in SAP and provide them assistance
 Provide Post Go-Live Support
 ASAP methodology
 Training Trainers/Key users

Technical aspects:

 Induction workbench - Maintenance Operations


 Maintenance Planning and Contracts
 Component maintenance Cockpit – Open/Close loop scenarios
 UI integration - workbenches
 Work Packaging and Sequencing
 Maintenance Program Definition &Planning Maintenance Processing
 Component Management
 Configuration management solution
 Subcontracting for MRO Processes
 EAM- SD/PM/CS Orders Management in MRO (Quotations, Contracts & Orders, Deliveries, End to
end Service Management, Contracts & Processing, Spare parts management, Field Services and in-
house Repair, WCM, Refurbishment process, predictive and preventive maintenance)
 QM - Inspection Plans, Characteristics, Master Inspection CharacteristicsQuality Notifications and
Inspection lots, Preventive quality management
 Parts Management, KMATs, Classification and Configuration profiles
 Routings(General task lists) implementation via variant configuration
 Provided consultation on setting up Functional Location hierarchy and the use of inheritance and data
transfer between technical objects. Provided guidance and assistance in reviewing data and preparing
instructions and templates for all PM data loads. Developed the classes and characteristics load for
equipment and MRO Materials. Developed the Catalog Codes, Code Groups, and Catalog Profiles for
the PM group. Generated Task List load data and Maintenance Plan data for approximately 3,000
Maintenance Plans. Provided input to the team on Maintenance Planning, Order processing, Master
data creation and maintenance and configuration when appropriate. Provided Go-Live support to
maintenance personnel.
 Tools management.
 Configuration Management
 Logbook
 Warranty/Claims Management
 DIMP 4.71, Service order processing, Line Maintenance, Equipment, BOMs, Service Bulletins, Task
lists, Inspection lot and plans
 Service Contracts, Sales & service order, Quotation, Delivery and Billing process (including Recourse
related billing), Pricing, Shipping, Warranty solution, DMS / Easy DMS.
 Projects, WBS elements, networks, milestones.
 PS Integration with CO, FI, WM and external systems.
 Working with offshore teams.
 ABAP Functional/Technical Specification, ABAP development, debugging and problem-solving.
 Solution Manager specifications integration, configuration and documents development.

Customer: Lufthansa Technik, Sofia


Duration: January 2009 – June 2009

Sector: Aerospace Industry IS Aerospace & Defense

Project Description: SAP MRO Implementation

Project role: SAP IS-A&D MRO Functional Consultant, ECC 6.0


Post Go-live support
 Provided business consulting to support service sites to perform site servicing scheduled through
strategy maintenance plans. Provided assistance to less experienced analysts to learn the functions of
SAP PM and CS processing. Provided Business consulting to the business users to develop
improvements to their processes. Developed numerous ABAP Query reports for users to get the
Responsibilities: reports needed for analysis. Created and executed LSMW scripts for mass updates to master data
required by the business. Worked on several change request to improve functionality in the MRO, PM
CS modules.
 Configuration (Re-configuration)
 System testing and debugging
 Trouble-shooting

Customer: HoneywellAerospace, Bournemouth/ Evil, United Kingdom


Duration: January 2008 – March 2009

Sector: Aerospace Industry IS Aerospace & Defense

Project description: SAP MRO FI/CO/PS/MM/WM/SD/CS implementation, ECC 6.0

Project role: IS-A&D Aftermarket / MRO and VC - Lead Functional Consultant


Conceptual design; Requirements definition; Detailed Blueprint design; Configuration; System testing; Trouble-
shooting

Business aspects:
 Airline maintenance and engineering groups
Responsibilities:  Complex asset (frame, propulsion, avionics, etc.) - system MRO organizations
 Fixed base operators and maintenance service centers
 Technical support and field service organizations
 Component repair shops
 After-market spares provisioning organizations
 OEM warranty and customer support programs
 Highly integration with Quality Management
 ASAP methodology
 Training Trainers/key users

Technical aspects:
 DIMP 4.71, Equipment Master, Task Lists, BOM, Serial numbers, Work Center, Warranty, Service
Notification, Service orders, Service Contract, Service costing and billing, variant configuration, IPPE,
Master Part List (MPL).Maintenance event builder (MEB), Enterprise Asset Management (EAM), Work
Clearance Management (WCM), Work Efficiency Component (WEC)
 VC confer Master data modeling ( KMAT material type and Class 300) – Defining Material master data
like configurable. BOMs,- defining classes as BOM items. Configuration profiles. Maintaining
characteristics for configuration. Creation of the scripts for characteristics. Dependencies (Global and
Local). Precondition. Procedures. Constraints. Dependency groups for pricing.Maintain Routine
versions. Bom and Task list explosion. Strong integration with classes and characteristics.

 Quality Notifications(Tasks, Items(Defects), Quality Inspection Lots and Plans, Quality Certificates,
Activities), Material master quality data management (link to inspection types), QM messages and
work list.
 Component maintenance via custom build workbenches
 MRS 6.00 initial design and prototyping
 Service Process background: In-house-, Field Service Repair process; Material master records;
Engineering change management; design, quotation of an integrated solution within SAP DMS, Easy
DMS, design of a demonstrative model
 Tools management. Aerospace standardization of tools and usage based on resource skills and
permits. Tools repairs. Boms of tools. Assignment between resources and warehouse management.

 Object dependencies in classification and variant configuration – Classifications: Preconditions,


Selection Conditions, Actions, Procedures. Variant configurations: material BOMs
 Strong integration with SAP QM – Calibration process
 ABAP Functional/Technical Specification, debugging and problem-solving
 Solution Manager integration for specifications, configuration and documents development.
 Leading offshore teams.

Customer: Lykos S.A. Greece Athens


Duration: October 2007 – February 2008

Sector: Print Industry – FMCG/CPG industry

Project description: SAP PM/CS implementation

Project role: SAP EAM/PLM-PM/CS Solution Architect


PM/CS - Realization Phase

SAP PM Project with Full Cycle End-to-end implementations. Master Data (Equipment, functional locations, Job
Positions, Task Lists, Etc.). Configurations of Notifications, Orders, and Maintenance Plans for preventive
maintenance.
A load of Master Data through Batch Inputs (Equipment and Functional Locations) Creation of task lists with end
users. Unit testing, Integration testing, and Performance acceptance tests. Organized successfully various User
Training workshops on PM Module and prepared handouts and material to power users and end users under
knowledge transfer programs.

Business aspects:
The main objectives were to align many of the business processes throughout the various locations by
developing a global reference model. This development included:
 Configuration, testing and documenting of the global reference model before rollout
Responsibilities:  Provide solutions from AS-IS to TO-BE phases
 Participate in the business blueprint workshops and help business architect prepare the BBPD
 Map and configure the TO-BE business processes in SAP
 Provide detailed design for the business architect to complete the Functional Specifications
 Validate the bespoke applications developed by SAP Technical Consultant
 Act as a single point of contact for the Business Users
 Support the project through the lifecycle stages
 Fix the SAP configuration errors during System Testing, End to End testing and UAT
 Support the SAP Configuration during Post Implementation support period
 Train the trainer
 Field Service Repair process
 Material master records
 Engineering change management integration
 Solution Manager specifications, configuration and documents development
 Provide solutions and write technical specifications for Plant Maintenance (PM)and Customer Service
(CS) Modules:enhancements utilizing user-exits, closure of existing gaps, creation, and upgrade of
ABAP reports.
 Using PM sub-modules - Maintenance event builder (MEB), Work Clearance Management (WCM),
Work Efficiency Component (WEC), Product structure browser.
 ASAP methodology
.

Full life cycle

Customer: TOMI S.A, ( AKTOR A.T.E. ) Greece Athens – Athens Airport


Duration: July 2007 – April 2008

Sector: Aerospace Industry IS Aerospace & Defense

Project description: PLM - PM/PS Implementation

Project role: SAP IS-A&D MRO EAM - PM/PS Consultant


Implementation of PM/PS modules with exposure to DIMP4 add-on and IS MRO

Business aspects:
 Pre-sales work, modeling basic PM/PS practices for management demonstrations/presentations.
Responsibilities:  Gap analysis and associated functional specifications

Technical aspects:
 System enhancements are utilizing, user-exits, closure of existing gaps, creation and upgrade of
ABAP reports, fault diagnosis and rectification in production systems.

Customer: Zobele Group, Italy


Duration: December 2007

Sector: Chemical Industry

Project description: SAP ABAP Development

Project role: ABAP Developer


Technical aspects:
 ABAP Development, RFC, and translation for rollout in Bulgaria
Responsibilities:  Print Forms – sapscript, smartforms
 Reports

Customer: AMC (Cosmote) / SAP Hellas – Albania / Greece


Duration: February 2007 – December 2007
Sector: IS Mobile Telecommunications
SAP FI/CO/MM/SD/PM/PS implementation
Project description:

Project role: Lead Functional EAM/PLM - PM/CS/PS/AM consultant


Business and Functional aspects:
Full life-cycle PLM CS/PM/PS/QM project for an international telecommunications company. The main
responsibilities were to ensure quality assurance between implementation partner and client. Also provided
specialized knowledge to implementation partner in the areas of CS and PM. This project required high levels of
integration between the PM/CS modules and AM/PS. Provide Architecture design and solution, define
requirements, provide detailed Blueprint, customizing and configuration, key user support, and troubleshooting.
Using PM sub-modules - Mobile asset management (MAM) and Maintenance event builder (MEB), Enterprise
Asset Management (EAM).

Responsibilities: Writing technical specifications and providing solutions for:


Reporting, Data dictionary, user dialog screens, Menu Painter, user exits, ABAP query and report writer/painter
tools.BAPI’s, BADI-s, ALE, EDI, IDOC, SAPScript / SmartForms, LSMW / BDC conversion from legacy systems

QM - Inspection Plans, Characteristics, Master Inspection CharacteristicsQuality Notifications and Inspection


lots, Preventive quality management

MM- Parts Management

Full life cycle


Customer: TITAN Cement - Serbia/Kosjerich
Duration: June 2006 - February 2007

Sector: Cement/Mining Industry


SAP implementation project that provides an extensive functioning in the following modules: Finances,
Controlling, Materials Management, Sales and Distribution, Production Planning, Plant Maintenance and Project
Project Description: system (PS).
The Serbian branch is a part of the largest Greek cement manufacturer-Titan Cement S.A.
Titan Cement S.A is also the owner of the Bulgarian cement production factory- ZlatnaPanega Cement.
Project role: EAM/PLM-CS/PM/PS/DMS Team lead consultant
The project required significant configuration not only of the PM/PS/DMS modules but also many complex
integration aspects between PM and SD, MM and FI/CO modules. The objectives were to design, configure and
test a prototype to satisfy the Service Department requirements while enhancing elements such as planned
maintenance, planning, capacity planning, financial/profitability reporting, technical history of research &
development, etc. This prototype model is then going to be implemented throughout various multinational
locations. ASAP methodology.
Responsibilities: Tools management. Assignment of tools to resources. Planning and scheduling the tools. Tools warehouse
management.
Cross application components: Document Management System (DMS) and Classification System
Reporting, Data dictionary, Screen Painter, Menu Painter, user exits, ABAP query and report writer/painter tools.
BAPI’’s· SAPScript / SmartForms; LSMW / BDC conversion from legacy systems .

Full Life Cycle - Rollout

Customer: Alexsandris, Greece


Duration: February 2006 - July 2006

Sector: Spare parts for food processing Industry

Project Description: Support phase - corrections, post Go-life, Trouble-shooting

Project role: Team Lead PM/CS Solution Architect

Business aspects:
Responsibilities:
Gap analysis and associated functional specifications. Customizing and developing customer-specific
application

Technical responsibilities:
 Quotation processing, service contracts, field service, repair processing, warranty processing,
dispatching
 Functional Configuration.
 Developing customer specific application:
 User-exits/BADIs, BAPIs, ALE, EDI, IDOC, batch programs, reports, interfaces.
 OSS Note determination and implementation, Enhancements, Smartforms, ABAP, debug diagnosis

Customer: Coca - Cola Hellenic Bottling Company, Baltic Republics


Duration: February 2006 – May 2006

Sector: Beverage/Food/Alcohol FMCG industry


WAVE 1 support phase - CORE 4:
Project Description: Baltic Republics
Project role: PP/PM/CS Functional Consultant &ABAP Developer
Functional/Technical responsibilities:
Developing customer specific application include – user dialog screens (Screen Painter), custom DDIC tables,
Responsibilities: ALV reports, interfaces about breakdowns for repetitive production in EAM - PP/PM/CS modules
Full Life Cycle - Rollout

Customer: КIROV– BOSCH AD, Bulgaria


Duration: July 2005 – February 2006
Equipment Retail and Wholesale
Sector:
Project description: SAP FI/CO/MM/SD/CS implementation
Project role: Functional EAM/PLM CS/SM Consultant and ABAP developer

PLM - CS/ABAP Functional/Technical Consultant


Responsibilities:
Business/Functional responsibilities :
 Implementation for SAP Customer service(CS) module.
 Provide business process and flows mapping solutions Key users training, customizing and
configuration. Identifying reports and forms.
 Building Blueprint documentation, Functional, Technical specifications, training documentation and
Job Aids.
 ASAP methodology.

Technical responsibilities:
 ABAP developer:
 Developing user-specific process flow with dialog screens, user exits/BADIs, Y/Z tables and structures,
etc.
 OSS Note determination and implementation, ABAP debug diagnosis.
Full life cycle

Customer: BULGARTABAC Holding Group, Bulgaria


Duration: January 2004 – July 2005
Sector: Tobacco Products Producer - FMCG/CPG industry
Project Description: SAP Implementation of Large Cigar & Tobacco factories in Bulgaria

Project role: Product Life Cycle - Plant Maintenance (PM) Implementation – Full Life Cycle :

EAM/PLM – PM/CS/PP Functional consultant


Responsibilities:
SAP Plant Maintenance Functional Consultant to provide the maintenance “As-Is”, “To-Be” documentation and
prototyping design. This Bulgarian company used production-line technology to produce various cigar products.
After detailed “As-Is” documentation of the current maintenance system the project moved onto “To-Be” SAP
design and documentation. The design and configuration considered: outsourcing elements of maintenance to
contract whilst still allowing internal financial and managerial control, spares strategies, multilingual configuration,
control of maintenance function via SAP, variable shift patterns, data acquisition etc. This model will be used as
the basis for a global model in other factories. Integration with SAP FI/CO/MM/SD/PP modules.
Building Blueprint documentation, Functional, Technical specifications, training documentation and Job Aids.
Quotation processing, service contracts, field service, repair processing, warranty processing, dispatching.
Development and Maintenance of interfaces and reports for PM, MM, FI, CO, SD, PP and HR Modules.
Development of programs for loading Master Data of Fix Asses, Clients, and Vendors, Balance of GL Accounts,
etc. Development of Sapscript forms for Invoices, Process Orders, Checks, Goods Receipts, Purchase Orders,
and Contracts, etc. Applications of SAP Notes. Implementation of BADIS, User Exits, and Field Exits. ABAP
Instructor in CINDU Company, focus on Dialogue Programming Techniques, ALVs Reporting, List Processing
techniques, Table Controls programming, Batch Input programming, Sapscripts forms and Enhancements, and
Modifications.

ASAP methodology:
 Conceptual design
 Requirements definition
 Detailed Blueprint design
 Configuration
 System testing
 End-user training and support
 Trouble-shooting
Full Life Cycle

Customer: STOMANAINDUSTRY (VIOHALCO GROUP), Bulgaria - Phase II


Duration: February 2003 - January 2004

Sector: Metal Industry

SAP HR implementation, including Personnel Administration, Organizational Management, Time Management,


Enhancement of International Payroll to Bulgarian Payroll, Integration with Access System / SAP QM
Project Description: implementation – Calibration process
Full Life Cycle

Project role: HR ABAP/4 Developer


Technical responsibilities:
Developing customer specific HR Legal and Management Reporting, data upload and conversion programs,
Responsibilities: interfaces, forms within the functional area of HR. BADI-s, BAPIs, ALE, EDI, IDOC.
OSS Note determination and implementation, ABAP debug diagnosis
Full Life Cycle - Rollout
Customer: Coca-Cola Hellenic Bottling Company, Hungary/Budapest
Duration: April 2002 - January 2003

Sector: Beverage/Food/Alcohol FMCG industry

Project Description: WAVE 1 implementation - CORE 4

Project role: EAM/PLM PM/CS/PS Junior Consultant and ABAP/4 Developer


Functional analyses and Developing customer user exits, BADI-s, BAPIs, ALE, EDI, IDOC, Smartforms,
Responsibilities: sapscriptand ALV reports for PM/CS/PS modules.

Customer: STOMANA INDUSTRY (VIOHALCO GROUP), Bulgaria - Phase I


Duration: September 2000- March 2002

Sector: Metal Industry

SAP Finances and Accounting /FI/, Controlling /CO/, Materials Management /MM/, Production Planning /PP/,
Project Description: Sales and Distribution/SD implementation

Project role: ABAP/4 Developer

Developing customer specific Legal and Management Reporting, data upload and conversion programs,
Responsibilities: interfaces, userexits, functions and sapscript forms within the functional area of logistics.
Full Life Cycle

Customer: Foundation for Local Government Reform (FLGR) USAID


Duration: March 1998 - September 2000

Sector: NGO

Project Description: SAP for E-Municipalities, E-Government, SAP for Public Sector

Project role: IT Manager, Projects Coordinator


SAP for E-Municipalities, E-Government, SAP for Public Sector

Developing blueprint based on best practices for:


-Human capital management
Responsibilities: -Government procurement
-Financial management
-Supply chain management
-Constituent relationship management

Customer: Index Bulgaria (Dell Authorized Distributor)


Duration: February 1996 - September 1998

Sector: Information Technology and Services Industry

Project role: Customer Service Manager


Installation, configuration, and support of department equipment/services and clients. Part of the team who does
Responsibilities: the project for new Bulgarian “Identity Cards” for “Ministry of Interior of Republic Bulgaria”.

Customer: APIS
Duration: March 1994 - February 1996

Sector: Information Technology and Services Industry

Project role: Software Developer

Customer: Evrocom National Television


Duration: August 1992 - January 1994

Sector: Telecommunications Industry

Project role: Web Multimedia Developer

Education:

Institution Degree(s) or Diploma(s) obtained:


from- to
The University of National and World Economy, Sofia MBA degree
2005 - 2008
National Technical University, Sofia M.S. degree
1993 - 1999 Major: Nuclear Energy
Minor: Communication Technologies
Technical High School of Fine Mechanics and Optics, Sofia 1989-1993 Major: Laser Technologies and Applications

SAP Training and certificates:

 SAP Multiple Resource Scheduling (MRS) in ECC PLM360 - 2013


 SAP Aerospace and Defense iMRO Solution Axon HCL - 2009
 SAP Aerospace and Defense GAM MRO Solution Honeywell (A&D) - 2008
 SAP Quality Management (QM) on June 2008
 PLM - Maintenance & Repair with mySAP ERP 2005 (SAP ECC 6.0) SAP Certified Solution Consultant on November 2007
- S0004754375
 Enterprise Asset Management on November 2007
 SAP (PS) Project Systems on January 2005
 SAP R/3 MM/SD training 2004
 SAP R/3 BASIC (BC) Academy on October 2003
 SAP ABAP4 Academy on November 2002

Other certificates:
 ITIL4 - 2019
 PMP – 2019,
 PRINCE2 Practitioner - 2019
 PRINCE2 Foundation - 2016,
 NATO PERSONNEL SECURITY CLEARANCE CERTIFICATE – Jan 2019
 CCNA (Cisco Certified Network Associate 1999)
 Installing and Configuring Microsoft Windows Exchange, ISA, DNS, DHCP services and implementing with Active Directory
1998
 Installing and Configuring Microsoft Windows 2000 File, Print, and Web Servers 1996
 Microsoft Pre-installation Specialist: Windows 2000 Professional 1996
 ISO 9000 - Quality Insurance Framework 1996

Languages:
 English: very good command
 Russian: understanding very good, speaking basic
 German: basic
 Bulgarian: native

References:

I recommend Angel as a very good professional. Angel combines outstanding technical knowledge with fantastic analytical skills.

- Ben Loftus - Account Manager

I first contacted Angel when we had a contract position open with a global pharmaceutical company I was recruiting for. Angel had
come highly recommended and so it was no surprise that after one interview, he was offered the job immediately. Throughout the
entire recruitment process, Angel was extremely professional and easy to work with making my life as the recruiter very straight
forward! Since then, the feedback from our client has been very positive and I would have no hesitation in recommending Angel for
future opportunities.

- Brendan Hession – Director

I've had the pleasure of working with Angel on a couple of occasions when he was supplying niche SAP Consulting Services to two of
my customers in Europe. Angel was great to deal with from start to finish of the recruitment process, handling the contract process
and on-boarding with ease. He provided excellent services to our customers on both occasions, especially in the areas of SAP PM
and SAP CS, and I always pro-actively seek to find a new opportunity for Angel within my customers as I know he will always do a
great job. If you're looking for a seasoned SAP PM/CS Consultant who is professional and trustworthy then look no further than Angel.

- Dirk Vanderbeke - Business Manager at Atos


I recommend Angel as a very good professional. Angel combines outstanding technical knowledge with fantastic analytical skills.
“Angel has some strong commercial experience with some extremely rare SAP products. I have been in contact with Angel for just
over 5 years. Angel has excellent business communication skills, he is professional, articulate, hard working, approachable and most
important to me trustworthy & reliable. There are never any surprises when working with Angel, he does exactly as he says.”

—Reece Mitellas Recruitment Consultant - UK Market at Red Commerce

"Mr. Georgiev served for half a year as MRS consultant in my Project. He showed very good knowledge in

the tool and fast adaption to the way of working on our project. He is self driven and easy going socially and
come with my warm recommendation."

— Henric Widen, C2C Process Manager, SKF Group, managed Angel at SKF Group

"I had the opportunity of working very closely with Angel on the Swedish SKF UNITE SAP implementation
project. Angel represented the role of SAP MRS consulting expert on this project, serving together within
the C2C Service team. The objective assigned to Angel was to support the finalization of the Service High
level blueprint design, as well as building an SAP MRS “Proof of concept” (PoC), within an SAP ECC /
MRS Application landscaping. I supported Angel with the ECC CS functionality/ master data alignment
with Angel’s MRS configuration required to demo SAP MRS PoC for the SKF UNITE business team. I can
vouch that Angel is an very experienced SAP MRS Consultant with excellent knowledge and understanding
of MRS integration with SAP CS / PM. Angel resumed full ownership for realizing the activation of MRS
within ECC and supported the Basis team. Angel’s experience in SAP ABAP programming served him
favorably in helping Basis overcoming many of the issues relating to OSS notes, as well as activation
of business functions. Angel carried out full configuration of the SAP MRS module to support the PoC
mentioned above. On completion of the MRS PoC demonstration, Angel was highly commended by both
the UNITE Project members, as well as the SKF Business members for and excellent demonstration of the
MRS functionality, and its integration with ECC CS culminating in an successful MRS PoC. Angel has a
very pleasant disposition and professional attitude toward the end client, as well as his work colleges and very
openly shares what he has learned and I can recommend Angel with full confidence that he would be a great
asset on any SAP project team. " "

— David Mchendry, worked directly with Angel at SKF Group

"I worked with Angel at SKF's UNITE - All covering Business Transformation Program. He was proactively
creating and proposing the different high end solutions for resource planing which can fit to the customer and
meet all customer requirements in are of Service Business. Angel is target oriented individual with a strong
business acumen and great social skills. He deliveries with precision, acts only on facts, ignore speculations
and has a wonderful time management which all team appreciated! What impressed me most was how
quickly he grasped the essentials of a new challenge at the new customer, and with sense of urgency, moved
towards accomplishment of the objective, even if that was not fully clear. Under the project time, by shearing
own knowledge, he improved Service team's understanding of capabilities of SAP/MRS tool! It was really
my pleasure to be working with Angel and can warmly recommend this polite and high intelligent guy for
any position in the most complex projects! "

— Nebbe Damjanovic, C2C Process Manager - Complex Sales, SKF Group, worked directly with Angel at
SKF Group

"Angel is a great MRS solution lead with a great deal of in depth knowledge of MRS. He is creative in his
approach and holds himself to a very highy standard (quality of work). He is focused and totally committed
to satisfying his clients. Angel exceeded all of my expectations. He is not only an MRS expert but can also
be a CS expert as well so he is very rounded in his experiences. I would highly recommend him for any MRS
implementation. "

— Dean Rompella, Process Expert-C2C, SKF, was Angel's client

"Angel always ensured that our requirements were understood and delivered effectively within the remit of
the project. His knowledge of MRS and ability to deliver what was needed was excellent."

— Joanna Beresford-Knox, Business Process Manager, Cambridge English Language Assessment, was
Angel's client

"I have worked with Angel over the last 6 months and appreciated his methodical approach to problem
solving as well as his overall knowledge of SAP MRS. As the sole support for MRS throughout a demanding
project, he has played a key role in detailed design workshops, requirement confirmation , design document
creation and BFS creation."

— Philip Bicheno, Business Analyst, Cambridge Assessment, was Angel's client

"Angel has tremendous depth and breadth of expertise in the areas of SAP MRS and PM/CS modules and
their integration points with SAP HCM and MM modules. He is methodical in his approach thereby ensuring
that potential "gotchas" were identified and dealt with. He applied his expertise and approach to great effect
in the AS Project at Cambridge Assessment."

— Funso Apampa, AS Demand Lead, Cognizant, worked with Angel at Cambridge Assessment

"I first spoke to Angel early 2014 regarding a SAP MRS role for Cognizant, unfortunately on that occasion
the requirement was cancelled. I'm happy to have kept his profile on my SAP shortlist as he is an SME in this
field and we have always kept in touch; he is someone who is very passionate about his work. Submitting
him for a SAP MRS position on the 2nd occasion has proven successful as Angel has proved he still has the
skillset and experience required for this type of work. After enduring a tough interview process Angel has
been successful in his application and starting a long contract this month in the UK. I would recommend all
SAP recruiters to keep Angel's profile shortlisted for future opportunities and hope to work with him again."

— Jamil Miah AIRP, Account Manager - Cognizant Account, Experis UK & Ireland, was Angel's client

"I have had the opportunity and pleasure to experience that working with Angel during the time at Atlas
Copco. Angel was very senior consultant and acting as the SAP Lead Consultant for Modules SAP CS / PM
in the SAP program by Atlas Copco. He was very proactive with good knowledge. He has a very professional
attitude when dealing with colleagues and customer. He has very good interaction with others. He was
very positive, no problems with sharing expertise. He was very committed with quick reactions and quite
proactive, too. With regards to the initiative, I can also confirm, he was always seeking the best result and
benefit for the client. "

— Maxim Behm, PMP, SAP Program Manager, Infosys, managed Angel at Atlas Copco Airpower

"I have had the opportunity to work closely with Angel. He has a good understanding of MRS. He quickly
picks up unfamiliar toipcs and is always ready to go the extra mile when it come to analysis. He has a very
good work ethic and always delivers on his promises. I have enjoyed working with him and would gladly
recommend him."

— Maheen Mathew, SAP MRS Consultant, British Gas, worked directly with Angel at Centrica / British Gas
"I worked with Angel on a Smart Metering Project, Angel has got excellent SAP MRS functional knowledge,
he was available to help others on the project, he has a very pleasing nature and a good personality. I would
like to work with Angel in future."

— Mustafa Mohammed, SAP Specialist ( Smart Metering - ISU, MRS, PMCS) -


Functional, Centrica, worked with Angel at Centrica / British Gas

"Angel was the most hard working colleague I met at British Gas. He is open to challenges and would take up
new work without any hesitation.. would look forward to work with him in future..!!"

— Fayez Moidu, SAP Multiresource Scheduling (SAP MRS ) Principal Consultant, Centrica - Birtish
Gas, managed Angel at Centrica / British Gas

"I worked under Angel at Centrica / British gas. His position was SAP MRS Consultant. Very good
methodical approach and integration knowledge with SAP PM, HR and Mobile.A pleasure to work with and
for, excellent grasp, both technical and from a business point of view, of the tools, and a holistic view of the
project and the challenges therein..."

— Somashekar Avadhani, Solution Expert / Development Lead, Centrica, worked directly with Angel at
Centrica / British Gas

"Angel is a good consultant, always trying to fulfill the customer requirements and providing the best solutio
according to SAP Best practices. "

— Pedro Lourenço, Senior Consultant, Centrica, worked with Angel at Centrica / British Gas

"I`ve worked with Angel on SAP R/3 implementation project in Titan Cementara Kosjeric during 2007-2008
He is very professional, well organized, hardworking and cooperative person. In that period his main job is
related to PM and PS module implementation but it is visible that he has knowledge in whole SAP business
concepts. I also could say that PM and PS concept that He customize in that period is still valid almost
without any changes."

— Rade Jakovljevic, SAP R/3 Implementation Project Manager, Titan Cementara Kosjeric, was Angel's
Client

"I had the pleasure to cooperate with Angel in the framework of the SAP ERP implementation at Titan
Cement Company in Serbia. Angel is characterised by sound SAP knowledge coupled with excellent busine
process knowledge and analytical skills. He is a results oriented professional and very effective in terms of
keeping deadlines and delivering high quality deliverables. It would be a pleasure to have the opportunity to
cooperate with Angel in the future, "

— Nikos Thanasouras, ., Viohalco Group - TEKA Systems S.A., managed Angel at Titan Cement Company
SA – Serbia

"To whom it may concern: I know Angel from his work as SAP PM/CS consultant with Teka Systems. He i
very knowledgable consultant who has delivered on time and with best quality. Angel has also good sense o
humour and he is fun to work with. He was well accepted and fit well both within our team and with differen
customers and external colleagues. I can highly recommend him for any project work."

— Dobromir Bozhilov (dbozhilov@yahoo.co.uk), managed Angel at Kirov JSC

"I would recommend Angel as a very good consultant SAP CS/PM with very good technical (ABAP)
background, which is definitely a big benefit for every project. Combining excellent SAP knowledge,
analytical skills and focus to the customer requirements is a must have for the success of every project. "

— Alexander Strashilov, ABAP developer, FI consultant, Teka Systems, worked directly with Angel at
Kirov JSC

"Angel has worked as a senior development consultant on multiple SAP modules in our porjet in Stomana
Industry. He has delivered complex ABAP development and interfaces. In my capacity of his team lead
on this project , I can vouch for Angel's dependeable service delivery. He is a technically sound consultant
who has always delivered on very tight project deadlines. I have always received godd feedback from
then functional teams as well. I would recommend Angel for future engagements and look forward to an
opportunity to work with him again!"

— Kalin Damianov, Team Lead Development and Senior SAP ABAP Developer, Teka Systems (part of
Viohalco Holding), managed Angel at STOMANA INDUSTRY (VIOHALCO GROUP), Bulgaria - Phase II

"Angel worked as SAP ABAP developer for Coca-Cola in 2006. He was assigned to various tasks, which he
managed to complete and deliver in time and in a good quality. He acts with professionalism in his work and
is pleasure working with him."

— Tanja Simeonova, SAP Developer, Coca Cola Hellenic, managed Angel at Coca-Cola Hellenic Bottling
Company

"I used to work with Angel during his entire employment with FLGR. I know Angel as proactive person,
visionary in his professional field. Apart from his engagement in leading the IT function, Angel successfully
involved himself in project activities for the implementation of the first municipal customer service centers
in Bulgaria as well as the development of e-government at the local level of administration. Angel is focused,
aimed to deliver hi standard products through his work. He manages to get along with different types of
people and cultures. His moral and ethics in communicating with colleagues and customers make him
preferred partner. "

— Elena Paskaleva, Senior Accountant, Foundation for Local Government Reform (FLGR), managed Angel
indirectly at Foundation for Local Government Reform (FLGR) – USAID

"Angel is a person with deep knowledge in the IT field, which in combination with his trustworthy and
communication skills, make him one of the most wanted business partners. He is a knowledgeable and
experienced person with the main focus to understand customer needs and to tailor the right project solution."

— Zdravets Tsekov, Sales Manager, Index-Bulgaria Ltd., managed Angel indirectly at Index Bulgaria
(DELL Authorized Distributor)

"Angel was my colleague years ago. Very serious, professional person you can count on."

— Ventsyslav Vassilev, worked directly with Angel at Apis Europe

You might also like