Professional Documents
Culture Documents
Sludge Treatment: Total Solid in Raw Water 600 Kg/day
Sludge Treatment: Total Solid in Raw Water 600 Kg/day
1 NTU 1 mg/l
Assume,
Page 01/03
Volume goes to Back wash recovery tank 912 m3
Assume,
Pipe Size 100 mm
So, Velocity 0.39 m/s
SLUDGE THICKNER
Assume,
Solid loading rate 25 kg/m2.d
Page 02/03
hydraulic loading rate 9.86 m3/m2.d
Diameter 5.58 m
let 5.60 m
Sludge withdrawal
Assume Solid removal rate is 90%
So, Thicked Solid Volume 550.80 kg/m3
Assume,
5% Solid 550.80 kg/day
95% water 10,465 kg/day
Pump Selection
Assume,
Operating time 1 hrs/day
So, Pumping rate to Sludge Thickner 11 m3/hr
183.33 l/min
Assume,
Pipe Size 100 mm
So, Velocity 0.39 m/s
Page 03/03
EATMENT
= 50*1*10-3*12000
V= Mass/Density
47-50 m/hr
= Back wash rate*Area of filter bed
Page 04/03
per back wash per filetr
Assume, Recoverd 90% of volume ( 0.9* volume) of
back wash Regulation tank
= 4.5m*4.5m*1.65m
20-80 kg/m2.d
Page 05/03
= flow rate/ Area (4 to 10 m3/m2.d)
V= Mass/Density
Page 06/03
SLUDGE TREATMENT
1 NTU 1 mg/l
Assume,
Page 07/03
Total back wash volume (4 beds) 910 m3
Volume goes to Back wash recovery tank 912 m3
Assume,
Pipe Size 100 mm
So, Velocity 0.48 m/s
SLUDGE THICKNER
Assume,
Solid loading rate 40 kg/m2.d
Page 08/03
Area Required 30.00 m2
Diameter 6.18 m
let 6.20 m
Sludge withdrawal
Assume Solid removal rate is 90%
So, Thicked Solid Volume 1,080.00 kg/m3
Assume,
5% Solid 1,080.00 kg/day
95% water 20,520 kg/day
Pump Selection
Assume,
Operating time 1 hrs/day
So, Pumping rate to Sludge Thickner 22 m3/hr
359.48 l/min
Assume,
Pipe Size 100 mm
So, Velocity 0.76 m/s
Page 09/03
ATMENT
= 50*1*10-3*12000
V= Mass/Density
47-50 m/hr
= Back wash rate*Area of filter bed
Page 010/03
per back wash per filetr
Assume, Recoverd 90% of volume ( 0.9* volume) of
back wash Regulation tank
= 5m*5m*2m
41.25
20-80 kg/m2.d
Page 011/03
=Total Sludge weight (kg/day)/Solid loading rate
V= Mass/Density
Page 012/03