REKAP DEBIT

Lokasi h pintu (m) h air (m) F (m2) V (m/detik) Qukur (m3/detik)


130 0.58 1.85 0.19 0.35
Sindupraja Ujung Pule 140 0.63 2.01 0.21 0.42
150 0.71 2.27 0.23 0.51

20 1.5 6.75 1.00 6.75


40 1.57 7.065 1.09 7.67
Sindupraja GS 60 1.64 7.38 1.17 8.65
80 1.7 7.65 1.26 9.66
100 1.77 7.965 1.35 10.74

40 1.15 16.004 0.26 4.15


60 1.3 18.226 0.31 5.64
Sindupraja SDP
80 1.4 19.987 0.35 7.02
100 1.5 21.793 0.38 8.26

10 0.75 10.124 0.29 3.45


20 0.91 14.074 0.31 4.82
Bangkir
30 1.03 16.91 0.33 6.23
40 1.13 19.303 0.37 7.67

Rambatan 1 (Hulu) - 4.45 274.89 0.03 9.75


Rambatan 2 (Hilir) - 4.50 317.75 0.03 9.94

Bojongsari 1 (Hulu) - 1.75 12.18 0.28 3.58


Bojongsari 2 (Hilir) - 1.66 16.15 0.20 3.60

Waledan 1 (Hulu) - 3.19 215.98 0.05 11.01


Waledan 2 (Hilir) - 3.24 246.10 0.04 11.05

Sabo Dam 1 - 2.31 59.70 0.10 6.72

Copong 1 (Hulu) - 1.55 13.68 0.12 2.59


Copong 2 (Hilir) - 1.05 14.46 0.15 2.66
5 0.85 6.22 0.17 1.13
Copong Saluran Induk
10 0.95 7.12 0.21 1.63
Tgl. Pengukuran

6-Sep-19

6-Sep-19

5-Sep-19

8-Sep-19

7-Sep-19

4-Sep-19

7-Sep-19

10-Oct-19

9-Oct-19

8-Oct-19