Professional Documents
Culture Documents
Notes: Traffic Direction MP238
Notes: Traffic Direction MP238
Notes: Traffic Direction MP238
T3 BAR BAR 1. ALL DIMENSIONS ARE IN MM AND LEVELS ARE IN METRE UNLESS OTHERWISE MENTIONED.
MP238 SPACING/NOS. SHAPE REMARK 2. DIMENSIONS SHALL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED.
MARK DIA
MP238-LHS T3 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS.
01 20 10 Nos. EACH FACE 4. UNTENSIONED REINFORCEMENT SHALL BE THERMO MECHANICALLY TREATED (TMT), HIGH YIELD
STRENGTH DEFORMED BARS OF GRADE DESIGNATION Fe-500D CONFORMING TO IS: 1786.
02 20 8 Nos. EACH FACE 5. REINFORCEMENT OF PIER SHAFT IS TO BE ANCHORED IN THE FOUNDATION BEFORE IT'S
CONCRETING.
6. CLEAR COVER TO OUTER MOST REINF. SHALL BE AS FOLLOWS:-
03 25 23 Nos. EACH FACE
PIER : 75mm (OUTSIDE)
PIER : 50mm (INSIDE)
04 20 21 Nos. EACH FACE 7. FOR ANCHOR AND LAPPING DETAILS REFER DRAWING NO. BX-00-0011 AND BX-00-0012.
8. FOR GENERAL ARRANGEMENT DRAWING REFER DRAWING NO. BX-00-0020 TO BX-00-0037.
05 25 6 Nos. EACH CORNER 9. FOR DIMENSION DETAILS OF PIER AND PIER CAP REFER DRAWING NO. BX-16-2201.
300 (TYP.)
REINFORCEMENT DETAILS 06 20 4 Nos. EACH CORNER
OF PIER CAP T3
REFER SEPARATE DRAWING. 07 16 @400 c/c EACH FACE/ALTERNATE WITH 07c
OUTER REINFORCEMENT
OUTER REINFORCEMENT
INNER REINFORCEMENT
INNER REINFORCEMENT
07b 12 @400 c/c EACH FACE/ALTERNATE WITH 07a
T3
(TYP.)
300
300
5Ø mm
≥5
0
17 17
17 17 17 17 T3
17 17
Ø
300 300 07a / 07b
(TYP.) (TYP.)
Ld
Ld
10Ø
SECTION A SECTION B
≥ 70mm
07 / 07c
1: 50 1: 50
T3 DETAIL - DETAIL 1
1: 10 - 1: 20 -
Ld (TYP.)
B DESIGN LINE HOOK DETAIL SHOWING BAR No. 07 ,07a, 07b & 07c ONLY
07a/07b 07a/07b
MP238-LHS -
16 16
07 / 07c 03 T3
14 13 15 15 13 14 T3 MP238-RHS T3
05 05
08
16 16
10xDia of Bar
09 07/07c 07/07c 09
09
TRAFFIC DIRECTION
06 11 04 10 09 11 06
15 15
02 02 8-LHS
07a
07a
07a
MP23
A A AS
/
01 12 12 01 -
07b 07b
08 08
15 15 T3
06 11 04 10 09 11 06
T3
10xDia of Bar
09 07/07c 07/07c 09
16 16
1 DETAIL 1
- - T3 REVISION AS CLOUDED - RECESS & KICKER REMOVED 14.08.19 NSB PP AS
1: 20
T2 REVISION AS CLOUDED 12.06.19 SNS SK AS
SHOWING BAR No. 08 & 09 ONLY T1 REVISION AS CLOUDED 16.05.19 SNS SK AS
05 05 T0 FIRST ISSUE 18.01.19 SNS SK AS
Rev Description Date Drawn Chk App
14 13 15 07 / 07c 03
B
15 13 14 SECTION C @ COPYRIGHT. THIS DOCUMENT IS THE PROPERTY OF RAMBOLL INDIA PVT. LTD.AND ALL RIGHTS ARERESERVED IN
16 16 RESPECT OF IT. THIS DOCUMENT MAY NOT BE REPRODUCED OR DISCLOSED IN ANY MANNERWHATSOEVER, IN WHOLE OR
1: 25 - IN PART,WITHOUT THE PRIOR WRITTEN CONSENT OF RAMBOLL INDIA PVT. LTD.RAMBOLL INDIA PVT. LTD. EXPRESSLY
07a/07b 07a/07b DISCLAIMS ANY RESPONSIBILITY FOR ORLIABILITY ARISING FROM THE USE OF THIS DOCUMENT BY ANY THIRD PARTY.
Client: General consutant: EPC Contractor: Independent Design Consultant: Design Consultant: Name of Project: Drawing title:
MUMBAI METROPOLITAN REGION MODULE M16
DEVELOPMENT AUTHORITY MUMBAI TRANS HARBOUR LINK PROJECT PIER MP238
(PACKAGE-2) (CONSTRUCTION OF A 7.807 KM REINFORCEMENT DETAILS OF PIER
Login: Nilesh Barnis