AS-BUILT

AB Sep. 14, 2015 AS-BUILT MT DL/DP AS/JM


0 May. 13, 2014 For Construction MT DL/DP AS/JM
REV. DATE DESCRIPTION DSGN CHKD APPD
EMPLOYER :

Termotasajero Dos S.A. E.S.P


CONTRACTOR :

MANUFACTURER / SUB-CONTRACTOR :

PROJECT :

Termotasajero 2 161.6MW CFPP


DESIGNED BY DATE TITLE :
MT Sep.14, 2015
CHECKED BY DATE ELECTRICAL LOAD LIST
DL / DP Sep.14, 2015
APPROVED BY DATE DOCUMENT NUMBER PROJECT NO. REV.
AS / JM Sep.14, 2015 TT2-CTW-E443-00001 BECO1201 AB
CLIENTE HEC DOC. TT2-CTW-E443-00001
HYUNDAI ENGINEERING Co.
Customer SPIG DOC F5451A13-D-082
IMPIANTO FOGLIO DI
TT2 2 5
Plant Sheet Of
LOCALITA' COMMESSA
COLOMBIA F5451A13
Location Job
Documento di proprietà SPIG S.p.A. La società tutela i propri diritti da esso derivati in sede civile e penale a termini di legge.

ELECTRICAL LOAD LIST

0 05-13-2014 FOR CONSTRUCTION MT DL/DP AS/JM

B 01-13-2014 FIRST ISSUE MT DL/DP AS/JM

A 03-08-2013 INITIAL ISSUE MT DL/DP AS/JM

REV. DATE REVISION EDITED CHECKED APPROVED


ELECTRIC LOAD LIST
PROJECT NAME : Termotasajero II
EQUIPMENT NAME : Cooling tower

GENERAL NOTE

1. Equipment Number shall be designated according to Procedure for Plant Identification (KKS)

2. Load Type
M : Motor Load
P : Power (Non-motor) Load

3. Operation
1) Mode
C : Continuous operation
I : Intermittent operaton
S : Stand-by
I(SU) : During plant start-up only (Intermittent)
C(E) : Continuous operation (Emergency load)
I(E) : Intermittent operation (Emergency load)

2) Duty (load) factor


defined as 'the ratio of the average load over a designated period of time to the peak load occuring in the period'.
For continuous operation : 1
For intermittent operation : 0.1 ~ 0.8 (to be decided by the supplier)
For stand-by : 0

4. Abbreviation
Ph : Phase (3 phase or 1 phase)
Volt : Rated voltage in V
EFF : Efficiency
PF : Power factor
FLC : Full load current in A
LRC : Motor starting current in A
AC : Alternating current
DC : Direct current
AC(U) : Uninterruptable AC power (UPS)

5. The marked "*" means 'Estimated Value' as preliminary.

F5451A13-D-082-02_TT2-CTW-E443-00001_0.xls
ELECTRICAL LOAD LIST
PROJECT NAME : Termo tasajero Unit 2
EQUIPMENT NAME : Cooling Tower Date : 05-13-2014

Shaft Rated Power Operation


Load Volt Power Freq. FLC LRC Manu- Installed
No. Equipment No. Equipment Name Ph EFF PF Remark
type [V] Demand [ Hz ] [A] [A] Duty facturer Location
[kW] [KVA] [KW] Mode
factor

94,5 0,78

Fan electric motor


1 M 3 460 ≤ 120 60 132 94,8 0,84 205 1230 continuous 1 WEG fan deck
22PAE10AC001-M

95.0 0,85

94,5 0,78

Fan electric motor


2 M 3 460 ≤ 120 60 132 94,8 0,84 205 1230 continuous 1 WEG fan deck
22PAE20AC001-M

95.0 0,85

94,5 0,78

Fan electric motor


3 M 3 460 ≤ 120 60 132 94,8 0,84 205 1230 continuous 1 WEG fan deck
22PAE30AC001-M

95.0 0,85

94,5 0,78
Fan electric motor
4 22PAE40AC001-M M 3 460 ≤ 120 60 132 94,8 0,84 205 1230 continuous 1 WEG fan deck

95.0 0,85

94,5 0,78

Fan electric motor


5 M 3 460 ≤ 120 60 132 94,8 0,84 205 1230 continuous 1 WEG fan deck
22PAE50AC001-M

95.0 0,85

94,5 0,78

Fan electric motor


6 M 3 460 ≤ 120 60 132 94,8 0,84 205 1230 continuous 1 WEG fan deck
22PAE60AC001-M

95.0 0,85

F5451A13-D-082-02_TT2-CTW-E443-00001_0.xls
ELECTRICAL LOAD LIST
PROJECT NAME : Termo tasajero Unit 2
EQUIPMENT NAME : Cooling Tower Date : 05-13-2014

Shaft
Rated Power Operation
Load Volt Power Freq. FLC LRC Manu- Installed
No. Equipment No. Equipment Name Ph EFF PF Remark
type [V] Demand [ Hz ] [A] [A] Duty facturer Location
[kW] [KVA] [KW] Mode
factor
(1) Electric motor heater
operation shall be switched
intermittent
Fan electric motor heater ON when the motor is
7 22PAE10AC001 P 1 240 N/A 60 0,14 / / / / (1) SEE Note 1 WEG motor
stopped and switched OFF
22PAE10AC001-H REMARK
when the motor is in
operation

(1) Electric motor heater


operation shall be switched
intermittent
Fan electric motor heater ON when the motor is
8 22PAE20AC001 P 1 240 N/A 60 0,14 / / / / (1) SEE Note 1 WEG motor
stopped and switched OFF
22PAE20AC001-H REMARK
when the motor is in
operation

(1) Electric motor heater


operation shall be switched
intermittent
Fan electric motor heater ON when the motor is
9 22PAE30AC001 P 1 240 N/A 60 0,14 / / / / (1) SEE Note 1 WEG motor
stopped and switched OFF
22PAE30AC001-H REMARK
when the motor is in
operation

(1) Electric motor heater


operation shall be switched
intermittent
Fan electric motor heater ON when the motor is
10 22PAE40AC001 P 1 240 N/A 60 0,14 / / / / (1) SEE Note 1 WEG motor
stopped and switched OFF
22PAE40AC001-H REMARK
when the motor is in
operation

(1) Electric motor heater


operation shall be switched
intermittent
Fan electric motor heater ON when the motor is
11 22PAE50AC001 P 1 240 N/A 60 0,14 / / / / (1) SEE Note 1 WEG motor
stopped and switched OFF
22PAE50AC001-H REMARK
when the motor is in
operation

(1) Electric motor heater


operation shall be switched
intermittent
Fan electric motor heater ON when the motor is
12 22PAE60AC001 P 1 240 N/A 60 0,14 / / / / (1) SEE Note 1 WEG motor
stopped and switched OFF
22PAE60AC001-H REMARK
when the motor is in
operation

F5451A13-D-082-02_TT2-CTW-E443-00001_0.xls